Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids[E8]
UnknownEuropean Commission[E1]
- Fecha[E2]
- Prazo do financiador: 1 de dez. de 2027, 01:00 Horário da Europa Central (UTC+1). UTC: 1 de dez. de 2027, 00:00 UTC.
- Financiamento total[E9]
- EUR 10.000.000
- Idioma da proposta
- Seu idioma
- Sua aderência
- Entre para ver a aderência
Em palavras simples
- O que financia
- Escrevendo um resumo curto no seu idioma…
- Quem pode se inscrever
- EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.
- Fase: Prototype and MVP
- Edital e inscrição
O edital, as regras e o formulário de inscrição estão na página do financiador. Leia antes de se inscrever.
Riscos e incertezas
- RiscoApplications open on 4 de ago. de 2027. The funder can change the details before then.[E6]
- RiscoThis is a grant, not a contract. Grants usually need a proposal against the funder's criteria, may need partners and often need co-funding.[E5]
- DesconhecidoWe read the funder's listing, not the full guidance or application forms.
- Abre[E6]
- 4 de ago. de 2027
- Última conferência
- há 10 horas
Sobre o financiamento · Do aviso
Call: ENERGY. Type of action: HORIZON Innovation Actions. Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with TSOs and other DSOs; Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the ADSM design and operation and effectively manage a broad range of grid services. Scope: Projects are expected to address all the following items: Design and test innovative solutions, architectures, technologies and processes for advancing the way the ADSM are designed and operated; Provide ADSM software platforms that improve grid performance, controllability, and help integrating distributed energy resources (DERs) in an efficient way, while reducing congestion and improving grid flexibility; Advance forecasting solutions for energy supply, demand, and flexibility made available to the system operator; provide advanced analytics and visualisations; Advance interoperability, both with TSOs and other DSOs, as well as with the DERs at the edge of the grid; Leverage modern solutions, notably digital twins and artificial intelligence. Use security-by-design and advanced protection mechanisms against cyber threats. Use and/or develop, to the greatest extent possible, open-source software s…[E3]
Quem pode se inscrever
- CondiçãoEU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.[E4]
Financiador
O que mais este financiador ofereceEuropean Commission
A chamada não dá outro canal de contato com o financiador além da página original.
Como fazer uma pergunta
Envie perguntas pela página ou pelo canal de atendimento do financiador. Leia o guia primeiro. Abrir o canal do comprador
Mostramos apenas o canal de contato da própria organização como publicado: site, portal, caixas compartilhadas e telefone principal. Nunca uma pessoa.
Evidências9 fatos do aviso · MostrarOcultar
Cada dado desta página vem do edital do financiador. Cada item mostra o registro e o campo de onde foi lido.
- E1
The funder is European Commission.
De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/type/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)
- E2
Proposals must be submitted by 1 Dec 2027, 01:00 Central European time (UTC+1).
“2027-12-01T00:00:00.000+0000”
De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/deadlineDate/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)
- E3
The buyer describes the requirement in the notice.
“Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system o…”
De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/descriptionByte/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)
- E4
EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.
“EU call topic”
De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/type/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)
- E5
The portal lists this call as forthcoming: it is announced but not open yet.
“31094501”
De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/status/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)
- E6
Applications open on 4 Aug 2027.
“2027-08-04T00:00:00.000+0000”
De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/startDate/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)
- E7
The Funding & Tenders Portal gives the status as forthcoming.
De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/status/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)
- E8
The notice is titled "Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids".
De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/title/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)
- E9
The EU contribution per grant is up to EUR 10,000,000 (from EUR 6,000,000).
De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/budgetOverview/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)
Source: EU Funding & Tenders Portal, © European Union, CC BY 4.0. SLETOR shortened and reformatted the text. Licença dos dados: Creative Commons Attribution 4.0 (European Commission) (abre em nova aba). Dados de contato pessoais dos avisos não são guardados nem exibidos.
Atualizações
Vista pela primeira vez · 28 de out. de 2026, 21:22 UTC
The funder announced the call. Applications have not opened yet.
Registro de origem: Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26)