Pular para o conteúdo
Em breveSubvençãoAbre em 4 de ago. de 2027Equipamentos elétricos

Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids[E8]

UnknownEuropean Commission[E1]

Fecha[E2]
Prazo do financiador: 1 de dez. de 2027, 01:00 Horário da Europa Central (UTC+1). UTC: 1 de dez. de 2027, 00:00 UTC.
Financiamento total[E9]
EUR 10.000.000
Idioma da proposta
Seu idioma

Em palavras simples

O que financia
Escrevendo um resumo curto no seu idioma…
Quem pode se inscrever
  • EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.
  • Fase: Prototype and MVP
Edital e inscrição

O edital, as regras e o formulário de inscrição estão na página do financiador. Leia antes de se inscrever.

Riscos e incertezas

  • RiscoApplications open on 4 de ago. de 2027. The funder can change the details before then.[E6]
  • RiscoThis is a grant, not a contract. Grants usually need a proposal against the funder's criteria, may need partners and often need co-funding.[E5]
  • DesconhecidoWe read the funder's listing, not the full guidance or application forms.
Abre[E6]
4 de ago. de 2027
Última conferência
há 10 horas
Sobre o financiamento · Do aviso
Call: ENERGY. Type of action: HORIZON Innovation Actions. Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with TSOs and other DSOs; Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the ADSM design and operation and effectively manage a broad range of grid services. Scope: Projects are expected to address all the following items: Design and test innovative solutions, architectures, technologies and processes for advancing the way the ADSM are designed and operated; Provide ADSM software platforms that improve grid performance, controllability, and help integrating distributed energy resources (DERs) in an efficient way, while reducing congestion and improving grid flexibility; Advance forecasting solutions for energy supply, demand, and flexibility made available to the system operator; provide advanced analytics and visualisations; Advance interoperability, both with TSOs and other DSOs, as well as with the DERs at the edge of the grid; Leverage modern solutions, notably digital twins and artificial intelligence. Use security-by-design and advanced protection mechanisms against cyber threats. Use and/or develop, to the greatest extent possible, open-source software s…[E3]

Quem pode se inscrever

  • CondiçãoEU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.[E4]

European Commission

A chamada não dá outro canal de contato com o financiador além da página original.

Como fazer uma pergunta

Envie perguntas pela página ou pelo canal de atendimento do financiador. Leia o guia primeiro. Abrir o canal do comprador

Mostramos apenas o canal de contato da própria organização como publicado: site, portal, caixas compartilhadas e telefone principal. Nunca uma pessoa.

Evidências9 fatos do aviso · Mostrar

Cada dado desta página vem do edital do financiador. Cada item mostra o registro e o campo de onde foi lido.

  1. E1

    The funder is European Commission.

    De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/type/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)

  2. E2

    Proposals must be submitted by 1 Dec 2027, 01:00 Central European time (UTC+1).

    “2027-12-01T00:00:00.000+0000”

    De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/deadlineDate/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)

  3. E3

    The buyer describes the requirement in the notice.

    “Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system o…”

    De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/descriptionByte/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)

  4. E4

    EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.

    “EU call topic”

    De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/type/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)

  5. E5

    The portal lists this call as forthcoming: it is announced but not open yet.

    “31094501”

    De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/status/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)

  6. E6

    Applications open on 4 Aug 2027.

    “2027-08-04T00:00:00.000+0000”

    De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/startDate/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)

  7. E7

    The Funding & Tenders Portal gives the status as forthcoming.

    De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/status/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)

  8. E8

    The notice is titled "Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids".

    De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/title/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)

  9. E9

    The EU contribution per grant is up to EUR 10,000,000 (from EUR 6,000,000).

    De Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/budgetOverview/0, lido 28 de out. de 2026, 21:22 UTC · fonte (abre em nova aba)

Source: EU Funding & Tenders Portal, © European Union, CC BY 4.0. SLETOR shortened and reformatted the text. Licença dos dados: Creative Commons Attribution 4.0 (European Commission) (abre em nova aba). Dados de contato pessoais dos avisos não são guardados nem exibidos.

Atualizações

  1. Vista pela primeira vez · 28 de out. de 2026, 21:22 UTC

    The funder announced the call. Applications have not opened yet.

    Registro de origem: Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26)