Naar de inhoud
BinnenkortSubsidieOpent op 4 aug 2027Elektrische apparatuur

Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids[E8]

UnknownEuropean Commission[E1]

Sluit[E2]
Deadline van de financier: 1 dec 2027, 01:00 Midden-Europese tijd (UTC+1). UTC: 1 dec 2027, 00:00 UTC.
Totale financiering[E9]
EUR 10.000.000
Taal van de inschrijving
Jouw taal

In gewone taal

Wat het financiert
Korte samenvatting in jouw taal wordt geschreven…
Wie kan aanvragen
  • EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.
  • Fase: Prototype and MVP
Handleiding en aanvraag

De handleiding, regels en het aanvraagformulier staan op de pagina van de financier. Lees ze voordat u aanvraagt.

Risico's en onbekenden

  • RisicoApplications open on 4 aug 2027. The funder can change the details before then.[E6]
  • RisicoThis is a grant, not a contract. Grants usually need a proposal against the funder's criteria, may need partners and often need co-funding.[E5]
  • OnbekendWe read the funder's listing, not the full guidance or application forms.
Opent[E6]
4 aug 2027
Laatst gecontroleerd
8 uur geleden
Over de financiering · Uit de aankondiging
Call: ENERGY. Type of action: HORIZON Innovation Actions. Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with TSOs and other DSOs; Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the ADSM design and operation and effectively manage a broad range of grid services. Scope: Projects are expected to address all the following items: Design and test innovative solutions, architectures, technologies and processes for advancing the way the ADSM are designed and operated; Provide ADSM software platforms that improve grid performance, controllability, and help integrating distributed energy resources (DERs) in an efficient way, while reducing congestion and improving grid flexibility; Advance forecasting solutions for energy supply, demand, and flexibility made available to the system operator; provide advanced analytics and visualisations; Advance interoperability, both with TSOs and other DSOs, as well as with the DERs at the edge of the grid; Leverage modern solutions, notably digital twins and artificial intelligence. Use security-by-design and advanced protection mechanisms against cyber threats. Use and/or develop, to the greatest extent possible, open-source software s…[E3]

Wie kan aanvragen

  • VoorwaardeEU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.[E4]

European Commission

De oproep geeft geen andere contactroute dan de oorspronkelijke pagina.

Zo stelt u een vraag

Stel vragen via de pagina of het contactpunt van de financier. Lees eerst de handleiding. Open de route van de dienst

Wij tonen alleen de gepubliceerde contactroute van de organisatie: website, platform, algemene mailboxen en algemene nummers. Nooit een persoon.

Bewijs9 feiten uit de aankondiging · Tonen

Elk gegeven op deze pagina komt uit de vermelding van de financier. Elke regel toont het record en het veld waaruit het is gelezen.

  1. E1

    The funder is European Commission.

    Uit Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), veld /metadata/type/0, gelezen 28 okt 2026, 21:22 UTC · bron (opent in nieuw tabblad)

  2. E2

    Proposals must be submitted by 1 Dec 2027, 01:00 Central European time (UTC+1).

    “2027-12-01T00:00:00.000+0000”

    Uit Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), veld /metadata/deadlineDate/0, gelezen 28 okt 2026, 21:22 UTC · bron (opent in nieuw tabblad)

  3. E3

    The buyer describes the requirement in the notice.

    “Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system o…”

    Uit Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), veld /metadata/descriptionByte/0, gelezen 28 okt 2026, 21:22 UTC · bron (opent in nieuw tabblad)

  4. E4

    EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.

    “EU call topic”

    Uit Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), veld /metadata/type/0, gelezen 28 okt 2026, 21:22 UTC · bron (opent in nieuw tabblad)

  5. E5

    The portal lists this call as forthcoming: it is announced but not open yet.

    “31094501”

    Uit Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), veld /metadata/status/0, gelezen 28 okt 2026, 21:22 UTC · bron (opent in nieuw tabblad)

  6. E6

    Applications open on 4 Aug 2027.

    “2027-08-04T00:00:00.000+0000”

    Uit Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), veld /metadata/startDate/0, gelezen 28 okt 2026, 21:22 UTC · bron (opent in nieuw tabblad)

  7. E7

    The Funding & Tenders Portal gives the status as forthcoming.

    Uit Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), veld /metadata/status/0, gelezen 28 okt 2026, 21:22 UTC · bron (opent in nieuw tabblad)

  8. E8

    The notice is titled "Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids".

    Uit Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), veld /metadata/title/0, gelezen 28 okt 2026, 21:22 UTC · bron (opent in nieuw tabblad)

  9. E9

    The EU contribution per grant is up to EUR 10,000,000 (from EUR 6,000,000).

    Uit Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), veld /metadata/budgetOverview/0, gelezen 28 okt 2026, 21:22 UTC · bron (opent in nieuw tabblad)

Source: EU Funding & Tenders Portal, © European Union, CC BY 4.0. SLETOR shortened and reformatted the text. Datalicentie: Creative Commons Attribution 4.0 (European Commission) (opent in nieuw tabblad). Persoonlijke contactgegevens uit aankondigingen worden niet bewaard of getoond.

Updates

  1. Voor het eerst gezien · 28 okt 2026, 21:22 UTC

    The funder announced the call. Applications have not opened yet.

    Bronrecord: Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26)