Vai al contenuto
In arrivoContributoApre il 4 ago 2027Apparecchiature elettriche

Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids[E8]

UnknownEuropean Commission[E1]

Chiude[E2]
Scadenza dell'ente finanziatore: 1 dic 2027, 01:00 Ora dell’Europa centrale (UTC+1). UTC: 1 dic 2027, 00:00 UTC.
Finanziamento totale[E9]
EUR 10.000.000
Lingua dell’offerta
La tua lingua

In parole semplici

Cosa finanzia
Sto scrivendo un breve riepilogo nella tua lingua…
Chi può partecipare
  • EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.
  • Fase: Prototype and MVP
Bando e domanda

Il bando, le regole e il modulo di domanda sono sulla pagina dell'ente. Leggili prima di fare domanda.

Rischi e incognite

  • RischioApplications open on 4 ago 2027. The funder can change the details before then.[E6]
  • RischioThis is a grant, not a contract. Grants usually need a proposal against the funder's criteria, may need partners and often need co-funding.[E5]
  • SconosciutoWe read the funder's listing, not the full guidance or application forms.
Apre[E6]
4 ago 2027
Ultimo controllo
3 ore fa
Sul finanziamento · Dal bando
Call: ENERGY. Type of action: HORIZON Innovation Actions. Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with TSOs and other DSOs; Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the ADSM design and operation and effectively manage a broad range of grid services. Scope: Projects are expected to address all the following items: Design and test innovative solutions, architectures, technologies and processes for advancing the way the ADSM are designed and operated; Provide ADSM software platforms that improve grid performance, controllability, and help integrating distributed energy resources (DERs) in an efficient way, while reducing congestion and improving grid flexibility; Advance forecasting solutions for energy supply, demand, and flexibility made available to the system operator; provide advanced analytics and visualisations; Advance interoperability, both with TSOs and other DSOs, as well as with the DERs at the edge of the grid; Leverage modern solutions, notably digital twins and artificial intelligence. Use security-by-design and advanced protection mechanisms against cyber threats. Use and/or develop, to the greatest extent possible, open-source software s…[E3]

Chi può partecipare

  • CondizioneEU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.[E4]

European Commission

Il bando non indica altri modi per contattare il finanziatore oltre alla pagina originale.

Come fare una domanda

Faccia le sue domande tramite la pagina o il contatto del finanziatore. Legga prima la guida. Apri il canale dell'ente

Mostriamo solo il canale di contatto dell'organizzazione come pubblicato: sito web, piattaforma, caselle condivise e centralino. Mai una persona.

Evidenze9 fatti dal bando · Mostra

Ogni dato di questa pagina viene dal bando dell'ente. Ogni voce mostra il record e il campo da cui è stato letto.

  1. E1

    The funder is European Commission.

    Da Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/type/0, letto 28 ott 2026, 21:22 UTC · fonte (si apre in una nuova scheda)

  2. E2

    Proposals must be submitted by 1 Dec 2027, 01:00 Central European time (UTC+1).

    “2027-12-01T00:00:00.000+0000”

    Da Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/deadlineDate/0, letto 28 ott 2026, 21:22 UTC · fonte (si apre in una nuova scheda)

  3. E3

    The buyer describes the requirement in the notice.

    “Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system o…”

    Da Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/descriptionByte/0, letto 28 ott 2026, 21:22 UTC · fonte (si apre in una nuova scheda)

  4. E4

    EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.

    “EU call topic”

    Da Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/type/0, letto 28 ott 2026, 21:22 UTC · fonte (si apre in una nuova scheda)

  5. E5

    The portal lists this call as forthcoming: it is announced but not open yet.

    “31094501”

    Da Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/status/0, letto 28 ott 2026, 21:22 UTC · fonte (si apre in una nuova scheda)

  6. E6

    Applications open on 4 Aug 2027.

    “2027-08-04T00:00:00.000+0000”

    Da Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/startDate/0, letto 28 ott 2026, 21:22 UTC · fonte (si apre in una nuova scheda)

  7. E7

    The Funding & Tenders Portal gives the status as forthcoming.

    Da Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/status/0, letto 28 ott 2026, 21:22 UTC · fonte (si apre in una nuova scheda)

  8. E8

    The notice is titled "Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids".

    Da Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/title/0, letto 28 ott 2026, 21:22 UTC · fonte (si apre in una nuova scheda)

  9. E9

    The EU contribution per grant is up to EUR 10,000,000 (from EUR 6,000,000).

    Da Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26), campo /metadata/budgetOverview/0, letto 28 ott 2026, 21:22 UTC · fonte (si apre in una nuova scheda)

Source: EU Funding & Tenders Portal, © European Union, CC BY 4.0. SLETOR shortened and reformatted the text. Licenza dei dati: Creative Commons Attribution 4.0 (European Commission) (si apre in una nuova scheda). I recapiti personali presenti nei bandi non vengono conservati né mostrati.

Aggiornamenti

  1. Visto per la prima volta · 28 ott 2026, 21:22 UTC

    The funder announced the call. Applications have not opened yet.

    Record di origine: Advanced Distribution Management Systems (ADSM) for more efficient and flexible… (ID HORIZON-CL5-2027-07-D3-26)