Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids[E8]
UnknownEuropean Commission[E1]
In plain English
- What they want
- Call: ENERGY. Type of action: HORIZON Innovation Actions. Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively;
- Who can bid
- No restrictions are stated in the notice data. The tender documents may set more.
- Expected deadline
- Buyer's deadline: 1 Dec 2027, 01:00 Central European time (UTC+1). UTC: 1 Dec 2027, 00:00 UTC.Published Not stated.
- Value
- EUR 10,000,000
- Buyer
- European CommissionSee what else this buyer buys and when.
- How to apply
- Through the buyer's official process. Open the original notice on EU Funding & Tenders Portal (grants and calls for proposals) (opens in a new tab) ↗
- Tender documents
The tender documents for this notice are on the buyer's own portal, usually behind a free supplier registration. We link to them and do not fetch them, so the report is based on the notice only.
Your tender documents
Download the tender pack from the buyer's portal (the invitation to tender, specification, selection questionnaire, scoring and draft contract) and add it here. We read every page and check it against your company for the bid assessment.
Sign in to upload documents.
- Expected deadline[E2]
- 1 Dec 2027, 01:00 Central European time (UTC+1)
- Value[E9]
- EUR 10,000,000
- Published[E6]
- Not stated
- Procedure
- Not stated
- Last checked
- 34 minutes ago
About the requirement
From the notice
Call: ENERGY. Type of action: HORIZON Innovation Actions. Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with TSOs and other DSOs; Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the ADSM design and operation and effectively manage a broad range of grid services. Scope: Projects are expected to address all the following items: Design and test innovative solutions, architectures, technologies and processes for advancing the way the ADSM are designed and operated; Provide ADSM software platforms that improve grid performance, controllability, and help integrating distributed energy resources (DERs) in an efficient way, while reducing congestion and improving grid flexibility; Advance forecasting solutions for energy supply, demand, and flexibility made available to the system operator; provide advanced analytics and visualisations; Advance interoperability, both with TSOs and other DSOs, as well as with the DERs at the edge of the grid; Leverage modern solutions, notably digital twins and artificial intelligence. Use security-by-design and advanced protection mechanisms against cyber threats. Use and/or develop, to the greatest extent possible, open-source software s…[E3]
Eligibility and requirements
- ConditionEU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.[E4]
- The notice data states no restriction on who may bid. Exclusion grounds and selection criteria in the tender documents still apply.
Risks and unknowns
- RiskBidding has not opened. Scope and dates can change before the call for competition.[E5]
- RiskThis is a grant, not a contract. Grants usually need a proposal against the funder's criteria, may need partners and often need co-funding.[E5]
- UnknownWe read the published notice, not the full tender documents.
Updates
First seen · 28 Oct 2026, 21:22 UTC
The source published a planning or prior information notice. Bidding has not opened.
Source document HORIZON-CL5-2027-07-D3-26:31094501:2026-10-07T11:13:43.258+0200
Evidence
9 factsEvery fact on this page comes from the published notice. Each entry shows the document and the field it was read from.
- E1
The buyer is European Commission.
Document HORIZON-CL5-2027-07-D3-26:31094501:2026-10-07T11:13:43.258+0200, field /metadata/type/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E2
Proposals must be submitted by 1 Dec 2027, 01:00 Central European time (UTC+1).
“2027-12-01T00:00:00.000+0000”
Document HORIZON-CL5-2027-07-D3-26:31094501:2026-10-07T11:13:43.258+0200, field /metadata/deadlineDate/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E3
The buyer describes the requirement in the notice.
“Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system o…”
Document HORIZON-CL5-2027-07-D3-26:31094501:2026-10-07T11:13:43.258+0200, field /metadata/descriptionByte/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E4
EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.
“EU call topic”
Document HORIZON-CL5-2027-07-D3-26:31094501:2026-10-07T11:13:43.258+0200, field /metadata/type/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E5
This call is forthcoming: it is announced but not open yet.
“31094501”
Document HORIZON-CL5-2027-07-D3-26:31094501:2026-10-07T11:13:43.258+0200, field /metadata/status/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E6
The notice was published on 4 Aug 2027.
“2027-08-04T00:00:00.000+0000”
Document HORIZON-CL5-2027-07-D3-26:31094501:2026-10-07T11:13:43.258+0200, field /metadata/startDate/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E7
The Funding & Tenders Portal gives the status as forthcoming.
Document HORIZON-CL5-2027-07-D3-26:31094501:2026-10-07T11:13:43.258+0200, field /metadata/status/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E8
The notice is titled "Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids".
Document HORIZON-CL5-2027-07-D3-26:31094501:2026-10-07T11:13:43.258+0200, field /metadata/title/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E9
The EU contribution per grant is up to EUR 10,000,000 (from EUR 6,000,000).
Document HORIZON-CL5-2027-07-D3-26:31094501:2026-10-07T11:13:43.258+0200, field /metadata/budgetOverview/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
Source: EU Funding & Tenders Portal, © European Union, CC BY 4.0. SLETOR shortened and reformatted the text. Data licence: Creative Commons Attribution 4.0 (European Commission) (opens in a new tab). Personal contact details in notices are not stored or shown.