Skip to content
OpenBuilding construction workEngineering works and construction works+13 more

National Developer Framework[E466]

United KingdomWirralWirral Council[E64]

Deadline[E144]
Buyer's deadline: 8 Jan 2027, 12:00 UTC. UTC: 8 Jan 2027, 12:00 UTC.
Value[E467]
GBP 12,000,000,000
Procedure[E462]
Open procedureOne stage: bids go in by the deadline
Bid language
Your language

In plain English

What they want

Wirral Council (the "Council"), as the Contracting Authority, in partnership with Procure Partnerships Framework intends to let a National Developer Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for public sector development requirements across all English Regions.

Who can bid
  • The legal basis is UKPGA 2023/54 (Procurement Act 2023).
  • Lot 31 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
  • Lot 49 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
  • Lot 1 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
  • Lot 1 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

Risks and unknowns

  • UnknownWe read the published notice, not the full tender documents.
Published[E463]
29 Oct 2026
Last checked
20 hours ago
About the requirement · From the notice
Wirral Council (the "Council"), as the Contracting Authority, in partnership with Procure Partnerships Framework intends to let a National Developer Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for public sector development requirements across all English Regions. The Framework is designed to provide Public Sector Contracting Authorities with access to suitably qualified Development Partners capable of supporting projects across the full development lifecycle, from master planning and securing planning permission through to design, construction, delivery and, where applicable, aftercare of completed assets. The Framework will include a range of delivery models, including Development Agreements (DA), Joint Ventures (JV), Special Purpose Vehicles (SPV), Limited Liability Partnerships (LLP) and pre-development and feasibility support services. The Framework will be structured on a regional basis across England, aligned with established English regions (based on NUTS codes), enabling delivery through locally experienced partners with knowledge of regional markets and supply chains. The Framework consists of 63 Lots, comprising 36 Development Agreement Lots (Lots 1-36) and 27 Joint Venture / SPV Lots (Lots 37-63), split across nine English regions and a series of value bands. Development Partners may apply for one or more Lots and one or more regional areas, subject to the Lot constraints set out below. Full details of the Lot structure are set out under each Lot below. Potential Framework users may ther…[E145]

Preliminary, from the notice only

What the published notice says. This is not a recommendation. The tender documents can add or change requirements.

  • Delivery location: UKI, United Kingdom.[E204]
  • Delivery location: UKI, United Kingdom.[E176]

10 more requirements, possible blockers and open questions are in your free profile.

Create a free profile

Eligibility and requirements

  • ConditionThe legal basis is UKPGA 2023/54 (Procurement Act 2023).[E207]
  • ConditionLot 31 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E220]
  • ConditionLot 49 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E222]
  • ConditionLot 1 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E289]
  • ConditionLot 1 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E290]
  • ConditionLot 2 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E293]
  • ConditionLot 2 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E294]
  • ConditionLot 3 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E297]
  • ConditionLot 3 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E298]
  • ConditionLot 4 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E301]
  • ConditionLot 4 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E302]
  • ConditionLot 5 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E305]
  • ConditionLot 5 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E306]
  • ConditionLot 6 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E309]
  • ConditionLot 6 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E310]
  • ConditionLot 7 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E313]
  • ConditionLot 7 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E314]
  • ConditionLot 8 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E317]
  • ConditionLot 8 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E318]
  • ConditionLot 9 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E321]
  • ConditionLot 9 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E322]
  • ConditionLot 10 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E286]
  • ConditionLot 10 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E285]
  • ConditionLot 11 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E284]
  • ConditionLot 11 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E283]
  • ConditionLot 12 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E282]
  • ConditionLot 12 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E281]
  • ConditionLot 13 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E280]
  • ConditionLot 13 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E279]
  • ConditionLot 14 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E332]
  • ConditionLot 14 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E208]
  • ConditionLot 15 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E271]
  • ConditionLot 15 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E272]
  • ConditionLot 16 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E239]
  • ConditionLot 16 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E240]
  • ConditionLot 17 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E311]
  • ConditionLot 17 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E312]
  • ConditionLot 18 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E223]
  • ConditionLot 18 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E224]
  • ConditionLot 19 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E255]
  • ConditionLot 19 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E256]
  • ConditionLot 20 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E295]
  • ConditionLot 20 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E296]
  • ConditionLot 21 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E325]
  • ConditionLot 21 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E326]
  • ConditionLot 22 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E215]
  • ConditionLot 22 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E216]
  • ConditionLot 23 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E231]
  • ConditionLot 23 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E232]
  • ConditionLot 24 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E247]
  • ConditionLot 24 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E248]
  • ConditionLot 25 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E263]
  • ConditionLot 25 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E264]
  • ConditionLot 26 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E287]
  • ConditionLot 26 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E288]
  • ConditionLot 27 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E303]
  • ConditionLot 27 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E304]
  • ConditionLot 28 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E319]
  • ConditionLot 28 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E320]
  • ConditionLot 29 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E329]
  • ConditionLot 29 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E330]
  • ConditionLot 30 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E211]
  • ConditionLot 30 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E212]
  • ConditionLot 31 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E219]
  • ConditionLot 32 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E227]
  • ConditionLot 32 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E228]
  • ConditionLot 33 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E235]
  • ConditionLot 33 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E236]
  • ConditionLot 34 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E243]
  • ConditionLot 34 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E244]
  • ConditionLot 35 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E251]
  • ConditionLot 35 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E252]
  • ConditionLot 36 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E259]
  • ConditionLot 36 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E260]
  • ConditionLot 37 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E267]
  • ConditionLot 37 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E268]
  • ConditionLot 38 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E275]
  • ConditionLot 38 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E276]
  • ConditionLot 39 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E291]
  • ConditionLot 39 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E292]
  • ConditionLot 40 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E299]
  • ConditionLot 40 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E300]
  • ConditionLot 41 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E307]
  • ConditionLot 41 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E308]
  • ConditionLot 42 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E315]
  • ConditionLot 42 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E316]
  • ConditionLot 43 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E323]
  • ConditionLot 43 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E324]
  • ConditionLot 44 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E327]
  • ConditionLot 44 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E328]
  • ConditionLot 45 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E331]
  • ConditionLot 45 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E333]
  • ConditionLot 46 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E209]
  • ConditionLot 46 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E210]
  • ConditionLot 47 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E213]
  • ConditionLot 47 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E214]
  • ConditionLot 48 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E217]
  • ConditionLot 48 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E218]
  • ConditionLot 49 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E221]
  • ConditionLot 50 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E225]
  • ConditionLot 50 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E226]
  • ConditionLot 51 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E229]
  • ConditionLot 51 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E230]
  • ConditionLot 52 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E233]
  • ConditionLot 52 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E234]
  • ConditionLot 53 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E237]
  • ConditionLot 53 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E238]
  • ConditionLot 54 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E241]
  • ConditionLot 54 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E242]
  • ConditionLot 55 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E245]
  • ConditionLot 55 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E246]
  • ConditionLot 56 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E249]
  • ConditionLot 56 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E250]
  • ConditionLot 57 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E253]
  • ConditionLot 57 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E254]
  • ConditionLot 58 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E257]
  • ConditionLot 58 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E258]
  • ConditionLot 59 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E261]
  • ConditionLot 59 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E262]
  • ConditionLot 60 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E265]
  • ConditionLot 60 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E266]
  • ConditionLot 61 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E269]
  • ConditionLot 61 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E270]
  • ConditionLot 62 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E273]
  • ConditionLot 62 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E274]
  • ConditionLot 63 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E277]
  • ConditionLot 63 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E278]
  • ConditionThe buyer marks lot 17 as suitable for small and medium-sized businesses.[E339]
  • ConditionThe buyer marks lot 48 as suitable for small and medium-sized businesses.[E401]
  • ConditionThe buyer marks lot 48 as suitable for voluntary, community and social enterprises.[E402]
  • ConditionThe buyer marks lot 16 as suitable for small and medium-sized businesses.[E337]
  • ConditionThe buyer marks lot 15 as suitable for voluntary, community and social enterprises.[E336]
  • ConditionThe buyer marks lot 49 as suitable for small and medium-sized businesses.[E403]
  • ConditionThe buyer marks lot 49 as suitable for voluntary, community and social enterprises.[E404]
  • ConditionThe buyer marks lot 15 as suitable for small and medium-sized businesses.[E335]
  • ConditionThe buyer marks lot 1 as suitable for small and medium-sized businesses.[E433]
  • ConditionThe buyer marks lot 50 as suitable for small and medium-sized businesses.[E405]
  • ConditionThe buyer marks lot 50 as suitable for voluntary, community and social enterprises.[E406]
  • ConditionThe buyer marks lot 14 as suitable for voluntary, community and social enterprises.[E459]
  • ConditionThe buyer marks lot 14 as suitable for small and medium-sized businesses.[E334]
  • ConditionThe buyer marks lot 51 as suitable for small and medium-sized businesses.[E407]
  • ConditionThe buyer marks lot 51 as suitable for voluntary, community and social enterprises.[E408]
  • ConditionThe buyer marks lot 13 as suitable for voluntary, community and social enterprises.[E458]
  • ConditionThe buyer marks lot 13 as suitable for small and medium-sized businesses.[E457]
  • ConditionThe buyer marks lot 52 as suitable for small and medium-sized businesses.[E409]
  • ConditionThe buyer marks lot 52 as suitable for voluntary, community and social enterprises.[E410]
  • ConditionThe buyer marks lot 12 as suitable for voluntary, community and social enterprises.[E456]
  • ConditionThe buyer marks lot 12 as suitable for small and medium-sized businesses.[E455]
  • ConditionThe buyer marks lot 53 as suitable for small and medium-sized businesses.[E411]
  • ConditionThe buyer marks lot 53 as suitable for voluntary, community and social enterprises.[E412]
  • ConditionThe buyer marks lot 11 as suitable for voluntary, community and social enterprises.[E454]
  • ConditionThe buyer marks lot 11 as suitable for small and medium-sized businesses.[E453]
  • ConditionThe buyer marks lot 54 as suitable for small and medium-sized businesses.[E413]
  • ConditionThe buyer marks lot 54 as suitable for voluntary, community and social enterprises.[E414]
  • ConditionThe buyer marks lot 10 as suitable for voluntary, community and social enterprises.[E452]
  • ConditionThe buyer marks lot 10 as suitable for small and medium-sized businesses.[E451]
  • ConditionThe buyer marks lot 55 as suitable for small and medium-sized businesses.[E415]
  • ConditionThe buyer marks lot 55 as suitable for voluntary, community and social enterprises.[E416]
  • ConditionThe buyer marks lot 9 as suitable for voluntary, community and social enterprises.[E450]
  • ConditionThe buyer marks lot 9 as suitable for small and medium-sized businesses.[E449]
  • ConditionThe buyer marks lot 56 as suitable for small and medium-sized businesses.[E417]
  • ConditionThe buyer marks lot 56 as suitable for voluntary, community and social enterprises.[E418]
  • ConditionThe buyer marks lot 8 as suitable for voluntary, community and social enterprises.[E448]
  • ConditionThe buyer marks lot 8 as suitable for small and medium-sized businesses.[E447]
  • ConditionThe buyer marks lot 57 as suitable for voluntary, community and social enterprises.[E420]
  • ConditionThe buyer marks lot 7 as suitable for voluntary, community and social enterprises.[E446]
  • ConditionThe buyer marks lot 7 as suitable for small and medium-sized businesses.[E445]
  • ConditionThe buyer marks lot 58 as suitable for small and medium-sized businesses.[E421]
  • ConditionThe buyer marks lot 58 as suitable for voluntary, community and social enterprises.[E422]
  • ConditionThe buyer marks lot 6 as suitable for voluntary, community and social enterprises.[E444]
  • ConditionThe buyer marks lot 6 as suitable for small and medium-sized businesses.[E443]
  • ConditionThe buyer marks lot 59 as suitable for small and medium-sized businesses.[E423]
  • ConditionThe buyer marks lot 59 as suitable for voluntary, community and social enterprises.[E424]
  • ConditionThe buyer marks lot 5 as suitable for voluntary, community and social enterprises.[E442]
  • ConditionThe buyer marks lot 5 as suitable for small and medium-sized businesses.[E441]
  • ConditionThe buyer marks lot 60 as suitable for small and medium-sized businesses.[E425]
  • ConditionThe buyer marks lot 60 as suitable for voluntary, community and social enterprises.[E426]
  • ConditionThe buyer marks lot 16 as suitable for voluntary, community and social enterprises.[E338]
  • ConditionThe buyer marks lot 4 as suitable for voluntary, community and social enterprises.[E440]
  • ConditionThe buyer marks lot 61 as suitable for small and medium-sized businesses.[E427]
  • ConditionThe buyer marks lot 61 as suitable for voluntary, community and social enterprises.[E428]
  • ConditionThe buyer marks lot 4 as suitable for small and medium-sized businesses.[E439]
  • ConditionThe buyer marks lot 3 as suitable for voluntary, community and social enterprises.[E438]
  • ConditionThe buyer marks lot 62 as suitable for small and medium-sized businesses.[E429]
  • ConditionThe buyer marks lot 62 as suitable for voluntary, community and social enterprises.[E430]
  • ConditionThe buyer marks lot 3 as suitable for small and medium-sized businesses.[E437]
  • ConditionThe buyer marks lot 2 as suitable for voluntary, community and social enterprises.[E436]
  • ConditionThe buyer marks lot 63 as suitable for small and medium-sized businesses.[E431]
  • ConditionThe buyer marks lot 63 as suitable for voluntary, community and social enterprises.[E432]
  • ConditionThe buyer marks lot 2 as suitable for small and medium-sized businesses.[E435]
  • ConditionThe buyer marks lot 32 as suitable for voluntary, community and social enterprises.[E370]
  • ConditionThe buyer marks lot 1 as suitable for voluntary, community and social enterprises.[E434]
  • ConditionThe buyer marks lot 32 as suitable for small and medium-sized businesses.[E369]
  • ConditionThe buyer marks lot 33 as suitable for small and medium-sized businesses.[E371]
  • ConditionThe buyer marks lot 33 as suitable for voluntary, community and social enterprises.[E372]
  • ConditionThe buyer marks lot 31 as suitable for voluntary, community and social enterprises.[E368]
  • ConditionThe buyer marks lot 57 as suitable for small and medium-sized businesses.[E419]
  • ConditionThe buyer marks lot 31 as suitable for small and medium-sized businesses.[E367]
  • ConditionThe buyer marks lot 34 as suitable for small and medium-sized businesses.[E373]
  • ConditionThe buyer marks lot 34 as suitable for voluntary, community and social enterprises.[E374]
  • ConditionThe buyer marks lot 30 as suitable for voluntary, community and social enterprises.[E366]
  • ConditionThe buyer marks lot 30 as suitable for small and medium-sized businesses.[E365]
  • ConditionThe buyer marks lot 35 as suitable for small and medium-sized businesses.[E375]
  • ConditionThe buyer marks lot 35 as suitable for voluntary, community and social enterprises.[E376]
  • ConditionThe buyer marks lot 29 as suitable for voluntary, community and social enterprises.[E364]
  • ConditionThe buyer marks lot 29 as suitable for small and medium-sized businesses.[E363]
  • ConditionThe buyer marks lot 36 as suitable for small and medium-sized businesses.[E377]
  • ConditionThe buyer marks lot 36 as suitable for voluntary, community and social enterprises.[E378]
  • ConditionThe buyer marks lot 28 as suitable for voluntary, community and social enterprises.[E362]
  • ConditionThe buyer marks lot 28 as suitable for small and medium-sized businesses.[E361]
  • ConditionThe buyer marks lot 37 as suitable for small and medium-sized businesses.[E379]
  • ConditionThe buyer marks lot 37 as suitable for voluntary, community and social enterprises.[E380]
  • ConditionThe buyer marks lot 27 as suitable for voluntary, community and social enterprises.[E360]
  • ConditionThe buyer marks lot 27 as suitable for small and medium-sized businesses.[E359]
  • ConditionThe buyer marks lot 38 as suitable for small and medium-sized businesses.[E381]
  • ConditionThe buyer marks lot 38 as suitable for voluntary, community and social enterprises.[E382]
  • ConditionThe buyer marks lot 26 as suitable for voluntary, community and social enterprises.[E358]
  • ConditionThe buyer marks lot 26 as suitable for small and medium-sized businesses.[E357]
  • ConditionThe buyer marks lot 39 as suitable for small and medium-sized businesses.[E383]
  • ConditionThe buyer marks lot 39 as suitable for voluntary, community and social enterprises.[E384]
  • ConditionThe buyer marks lot 45 as suitable for voluntary, community and social enterprises.[E396]
  • ConditionThe buyer marks lot 25 as suitable for voluntary, community and social enterprises.[E356]
  • ConditionThe buyer marks lot 25 as suitable for small and medium-sized businesses.[E355]
  • ConditionThe buyer marks lot 40 as suitable for small and medium-sized businesses.[E385]
  • ConditionThe buyer marks lot 40 as suitable for voluntary, community and social enterprises.[E386]
  • ConditionThe buyer marks lot 24 as suitable for voluntary, community and social enterprises.[E354]
  • ConditionThe buyer marks lot 24 as suitable for small and medium-sized businesses.[E353]
  • ConditionThe buyer marks lot 41 as suitable for small and medium-sized businesses.[E387]
  • ConditionThe buyer marks lot 41 as suitable for voluntary, community and social enterprises.[E388]
  • ConditionThe buyer marks lot 23 as suitable for voluntary, community and social enterprises.[E352]
  • ConditionThe buyer marks lot 23 as suitable for small and medium-sized businesses.[E351]
  • ConditionThe buyer marks lot 42 as suitable for small and medium-sized businesses.[E389]
  • ConditionThe buyer marks lot 42 as suitable for voluntary, community and social enterprises.[E390]
  • ConditionThe buyer marks lot 22 as suitable for voluntary, community and social enterprises.[E350]
  • ConditionThe buyer marks lot 22 as suitable for small and medium-sized businesses.[E349]
  • ConditionThe buyer marks lot 43 as suitable for small and medium-sized businesses.[E391]
  • ConditionThe buyer marks lot 43 as suitable for voluntary, community and social enterprises.[E392]
  • ConditionThe buyer marks lot 21 as suitable for voluntary, community and social enterprises.[E348]
  • ConditionThe buyer marks lot 21 as suitable for small and medium-sized businesses.[E347]
  • ConditionThe buyer marks lot 44 as suitable for small and medium-sized businesses.[E393]
  • ConditionThe buyer marks lot 44 as suitable for voluntary, community and social enterprises.[E394]
  • ConditionThe buyer marks lot 20 as suitable for voluntary, community and social enterprises.[E346]
  • ConditionThe buyer marks lot 20 as suitable for small and medium-sized businesses.[E345]
  • ConditionThe buyer marks lot 45 as suitable for small and medium-sized businesses.[E395]
  • ConditionThe buyer marks lot 19 as suitable for voluntary, community and social enterprises.[E344]
  • ConditionThe buyer marks lot 19 as suitable for small and medium-sized businesses.[E343]
  • ConditionThe buyer marks lot 46 as suitable for small and medium-sized businesses.[E397]
  • ConditionThe buyer marks lot 46 as suitable for voluntary, community and social enterprises.[E398]
  • ConditionThe buyer marks lot 18 as suitable for voluntary, community and social enterprises.[E342]
  • ConditionThe buyer marks lot 18 as suitable for small and medium-sized businesses.[E341]
  • ConditionThe buyer marks lot 47 as suitable for small and medium-sized businesses.[E399]
  • ConditionThe buyer marks lot 47 as suitable for voluntary, community and social enterprises.[E400]
  • ConditionThe buyer marks lot 17 as suitable for voluntary, community and social enterprises.[E340]
  • DetailDelivery location: UKI, United Kingdom.[E204]
  • DetailLot 59 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E1]
  • DetailLot 63 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E2]
  • DetailLot 62 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E3]
  • DetailLot 61 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E4]
  • DetailLot 60 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E5]
  • DetailLot 1 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E6]
  • DetailLot 2 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E7]
  • DetailLot 3 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E8]
  • DetailLot 4 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E9]
  • DetailLot 5 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E10]
  • DetailLot 6 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E11]
  • DetailLot 7 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E12]
  • DetailLot 8 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E13]
  • DetailLot 9 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E14]
  • DetailLot 10 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E15]
  • DetailLot 11 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E16]
  • DetailLot 12 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E17]
  • DetailLot 13 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E18]
  • DetailLot 14 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E19]
  • DetailLot 15 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E20]
  • DetailLot 16 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E21]
  • DetailLot 17 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E22]
  • DetailLot 18 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E23]
  • DetailLot 19 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E24]
  • DetailLot 20 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E25]
  • DetailLot 21 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E26]
  • DetailLot 22 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E27]
  • DetailLot 23 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E28]
  • DetailLot 24 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E29]
  • DetailLot 25 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E30]
  • DetailLot 26 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E31]
  • DetailLot 27 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E32]
  • DetailLot 28 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E33]
  • DetailLot 29 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E34]
  • DetailLot 30 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E35]
  • DetailLot 31 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E36]
  • DetailLot 32 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E37]
  • DetailLot 33 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E38]
  • DetailLot 34 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E39]
  • DetailLot 35 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E40]
  • DetailLot 36 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E41]
  • DetailLot 37 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E42]
  • DetailLot 38 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E43]
  • DetailLot 39 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E44]
  • DetailLot 40 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E45]
  • DetailLot 41 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E46]
  • DetailLot 42 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E47]
  • DetailLot 43 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E48]
  • DetailLot 44 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E49]
  • DetailLot 45 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E50]
  • DetailLot 46 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E51]
  • DetailLot 47 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E52]
  • DetailLot 48 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E53]
  • DetailLot 49 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E54]
  • DetailLot 50 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E55]
  • DetailLot 51 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E56]
  • DetailLot 52 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E57]
  • DetailLot 53 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E58]
  • DetailLot 54 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E59]
  • DetailLot 55 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E60]
  • DetailLot 56 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E61]
  • DetailLot 57 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E62]
  • DetailLot 58 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E63]
  • DetailLot 27 runs from 31 Mar 2027 to 31 Mar 2031.[E80]
  • DetailLot 44 runs from 31 Mar 2027 to 31 Mar 2031.[E81]
  • DetailLot 28 runs from 31 Mar 2027 to 31 Mar 2031.[E82]
  • DetailLot 60 runs from 31 Mar 2027 to 31 Mar 2031.[E83]
  • DetailLot 50 runs from 31 Mar 2027 to 31 Mar 2031.[E84]
  • DetailLot 40 runs from 31 Mar 2027 to 31 Mar 2031.[E85]
  • DetailLot 20 runs from 31 Mar 2027 to 31 Mar 2031.[E86]
  • DetailLot 58 runs from 31 Mar 2027 to 31 Mar 2031.[E87]
  • DetailLot 21 runs from 31 Mar 2027 to 31 Mar 2031.[E88]
  • DetailLot 41 runs from 31 Mar 2027 to 31 Mar 2031.[E89]
  • DetailLot 22 runs from 31 Mar 2027 to 31 Mar 2031.[E90]
  • DetailLot 51 runs from 31 Mar 2027 to 31 Mar 2031.[E91]
  • DetailLot 23 runs from 31 Mar 2027 to 31 Mar 2031.[E92]
  • DetailLot 42 runs from 31 Mar 2027 to 31 Mar 2031.[E93]
  • DetailLot 24 runs from 31 Mar 2027 to 31 Mar 2031.[E94]
  • DetailLot 56 runs from 31 Mar 2027 to 31 Mar 2031.[E95]
  • DetailLot 25 runs from 31 Mar 2027 to 31 Mar 2031.[E96]
  • DetailLot 43 runs from 31 Mar 2027 to 31 Mar 2031.[E97]
  • DetailLot 26 runs from 31 Mar 2027 to 31 Mar 2031.[E98]
  • DetailLot 52 runs from 31 Mar 2027 to 31 Mar 2031.[E99]
  • DetailLot 39 runs from 31 Mar 2027 to 31 Mar 2031.[E100]
  • DetailLot 18 runs from 31 Mar 2027 to 31 Mar 2031.[E101]
  • DetailLot 19 runs from 31 Mar 2027 to 31 Mar 2031.[E102]
  • DetailLot 29 runs from 31 Mar 2027 to 31 Mar 2031.[E103]
  • DetailLot 63 runs from 31 Mar 2027 to 31 Mar 2031.[E104]
  • DetailLot 45 runs from 31 Mar 2027 to 31 Mar 2031.[E105]
  • DetailLot 62 runs from 31 Mar 2027 to 31 Mar 2031.[E106]
  • DetailLot 30 runs from 31 Mar 2027 to 31 Mar 2031.[E107]
  • DetailLot 61 runs from 31 Mar 2027 to 31 Mar 2031.[E108]
  • DetailLot 53 runs from 31 Mar 2027 to 31 Mar 2031.[E109]
  • DetailLot 1 runs from 31 Mar 2027 to 31 Mar 2031.[E110]
  • DetailLot 31 runs from 31 Mar 2027 to 31 Mar 2031.[E111]
  • DetailLot 2 runs from 31 Mar 2027 to 31 Mar 2031.[E112]
  • DetailLot 46 runs from 31 Mar 2027 to 31 Mar 2031.[E113]
  • DetailLot 3 runs from 31 Mar 2027 to 31 Mar 2031.[E114]
  • DetailLot 32 runs from 31 Mar 2027 to 31 Mar 2031.[E115]
  • DetailLot 4 runs from 31 Mar 2027 to 31 Mar 2031.[E116]
  • DetailLot 57 runs from 31 Mar 2027 to 31 Mar 2031.[E117]
  • DetailLot 5 runs from 31 Mar 2027 to 31 Mar 2031.[E118]
  • DetailLot 33 runs from 31 Mar 2027 to 31 Mar 2031.[E119]
  • DetailLot 6 runs from 31 Mar 2027 to 31 Mar 2031.[E120]
  • DetailLot 47 runs from 31 Mar 2027 to 31 Mar 2031.[E121]
  • DetailLot 7 runs from 31 Mar 2027 to 31 Mar 2031.[E122]
  • DetailLot 34 runs from 31 Mar 2027 to 31 Mar 2031.[E123]
  • DetailLot 8 runs from 31 Mar 2027 to 31 Mar 2031.[E124]
  • DetailLot 54 runs from 31 Mar 2027 to 31 Mar 2031.[E125]
  • DetailLot 9 runs from 31 Mar 2027 to 31 Mar 2031.[E126]
  • DetailLot 35 runs from 31 Mar 2027 to 31 Mar 2031.[E127]
  • DetailLot 10 runs from 31 Mar 2027 to 31 Mar 2031.[E128]
  • DetailLot 48 runs from 31 Mar 2027 to 31 Mar 2031.[E129]
  • DetailLot 11 runs from 31 Mar 2027 to 31 Mar 2031.[E130]
  • DetailLot 36 runs from 31 Mar 2027 to 31 Mar 2031.[E131]
  • DetailLot 12 runs from 31 Mar 2027 to 31 Mar 2031.[E132]
  • DetailLot 59 runs from 31 Mar 2027 to 31 Mar 2031.[E133]
  • DetailLot 13 runs from 31 Mar 2027 to 31 Mar 2031.[E134]
  • DetailLot 37 runs from 31 Mar 2027 to 31 Mar 2031.[E135]
  • DetailLot 14 runs from 31 Mar 2027 to 31 Mar 2031.[E136]
  • DetailLot 49 runs from 31 Mar 2027 to 31 Mar 2031.[E137]
  • DetailLot 15 runs from 31 Mar 2027 to 31 Mar 2031.[E138]
  • DetailLot 38 runs from 31 Mar 2027 to 31 Mar 2031.[E139]
  • DetailLot 16 runs from 31 Mar 2027 to 31 Mar 2031.[E140]
  • DetailLot 55 runs from 31 Mar 2027 to 31 Mar 2031.[E141]
  • DetailLot 17 runs from 31 Mar 2027 to 31 Mar 2031.[E142]
  • DetailClarification questions close at 4 Dec 2026, 12:00 UTC.[E460]
  • DetailThe notice explains how to submit a tender.[E465]

Tender documents

The tender documents are on the buyer's own portal, usually behind a free supplier registration. We never sign in for you. Download them there and add them below, or paste their public address.

What the check needs

  • Instructions to bidders: still needed
  • Specification: still needed
  • Selection questionnaire: still needed
  • Scoring and award criteria: still needed

Still needed: instructions to bidders, specification, selection questionnaire, scoring and award criteria. Add only these.

Add the documents yourself

Add only the missing parts from the buyer's portal: instructions to bidders, specification, selection questionnaire, scoring and award criteria. We read every page and check it against your company.

Sign in to upload documents.

Or forward them by email

Sign in to get a forwarding address for this tender.

  • Private to your organisationOnly people in your organisation can see the files.
  • Deleted after 90 daysOr straight away when you delete them.
  • Never used to train AIFiles are read for your check only.

Already written your answers?

Check your draft against this tender's questions, limits and your evidence before you submit.

Review my draft · £199See a sample review

Wirral Council

Address
Town Hall, Brighton Street, CH44 8ED, Wallasey

How to ask a question

Ask clarification questions through the buyer's own process, usually its procurement portal, before the clarification deadline. Answers are normally shared with every bidder. Open the buyer's route

We show only the organisation's own contact route as published: its website, portal, shared mailboxes and main lines. Never a named person.

Evidence467 facts from the notice · Show

Every fact on this page comes from the published notice. Each entry shows the document and the field it was read from.

  1. E1

    Lot 59 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/58/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  2. E2

    Lot 63 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/62/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  3. E3

    Lot 62 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/61/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  4. E4

    Lot 61 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/60/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  5. E5

    Lot 60 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/59/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  6. E6

    Lot 1 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/0/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  7. E7

    Lot 2 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/1/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  8. E8

    Lot 3 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/2/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  9. E9

    Lot 4 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/3/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  10. E10

    Lot 5 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/4/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  11. E11

    Lot 6 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/5/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  12. E12

    Lot 7 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/6/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  13. E13

    Lot 8 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/7/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  14. E14

    Lot 9 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/8/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  15. E15

    Lot 10 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/9/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  16. E16

    Lot 11 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/10/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  17. E17

    Lot 12 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/11/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  18. E18

    Lot 13 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/12/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  19. E19

    Lot 14 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/13/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  20. E20

    Lot 15 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/14/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  21. E21

    Lot 16 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/15/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  22. E22

    Lot 17 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/16/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  23. E23

    Lot 18 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/17/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  24. E24

    Lot 19 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/18/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  25. E25

    Lot 20 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/19/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  26. E26

    Lot 21 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/20/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  27. E27

    Lot 22 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/21/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  28. E28

    Lot 23 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/22/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  29. E29

    Lot 24 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/23/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  30. E30

    Lot 25 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/24/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  31. E31

    Lot 26 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/25/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  32. E32

    Lot 27 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/26/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  33. E33

    Lot 28 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/27/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  34. E34

    Lot 29 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/28/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  35. E35

    Lot 30 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/29/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  36. E36

    Lot 31 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/30/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  37. E37

    Lot 32 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/31/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  38. E38

    Lot 33 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/32/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  39. E39

    Lot 34 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/33/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  40. E40

    Lot 35 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/34/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  41. E41

    Lot 36 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/35/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  42. E42

    Lot 37 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/36/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  43. E43

    Lot 38 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/37/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  44. E44

    Lot 39 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/38/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  45. E45

    Lot 40 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/39/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  46. E46

    Lot 41 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/40/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  47. E47

    Lot 42 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/41/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  48. E48

    Lot 43 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/42/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  49. E49

    Lot 44 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/43/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  50. E50

    Lot 45 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/44/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  51. E51

    Lot 46 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/45/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  52. E52

    Lot 47 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/46/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  53. E53

    Lot 48 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/47/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  54. E54

    Lot 49 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/48/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  55. E55

    Lot 50 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/49/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  56. E56

    Lot 51 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/50/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  57. E57

    Lot 52 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/51/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  58. E58

    Lot 53 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/52/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  59. E59

    Lot 54 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/53/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  60. E60

    Lot 55 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/54/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  61. E61

    Lot 56 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/55/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  62. E62

    Lot 57 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/56/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  63. E63

    Lot 58 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..

    “Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”

    Document 102591-2026, field /tender/lots/57/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  64. E64

    The buyer is Wirral Council.

    Document 102591-2026, field /buyer/name, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  65. E65–E79

    Classified under CPV: Building construction work (45210000); Engineering works and construction works (45220000); Construction work for railways and cable transport systems (45234000); Construction work for airfields, runways and manoeuvring surfaces (45235000); Harbour construction works (45241000); Waterside leisure facilities construction work (45242000); Marine construction works (45244000); Construction work for dams, canals, irrigation channels and aqueducts (45247000); Construction works for sewage treatment plants, purification plants and refuse incineration plants (45252000); Real estate services (70000000); Feasibility study, advisory service, analysis (71241000); Project and design preparation, estimation of costs (71242000); Civil engineering consultancy services (71311000); Structural engineering consultancy services (71312000); Engineering design services (71320000).

    read 29 Oct 2026, 23:26 UTC

  66. E80

    Lot 27 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/26/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  67. E81

    Lot 44 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/43/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  68. E82

    Lot 28 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/27/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  69. E83

    Lot 60 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/59/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  70. E84

    Lot 50 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/49/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  71. E85

    Lot 40 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/39/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  72. E86

    Lot 20 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/19/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  73. E87

    Lot 58 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/57/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  74. E88

    Lot 21 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/20/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  75. E89

    Lot 41 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/40/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  76. E90

    Lot 22 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/21/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  77. E91

    Lot 51 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/50/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  78. E92

    Lot 23 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/22/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  79. E93

    Lot 42 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/41/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  80. E94

    Lot 24 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/23/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  81. E95

    Lot 56 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/55/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  82. E96

    Lot 25 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/24/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  83. E97

    Lot 43 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/42/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  84. E98

    Lot 26 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/25/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  85. E99

    Lot 52 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/51/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  86. E100

    Lot 39 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/38/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  87. E101

    Lot 18 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/17/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  88. E102

    Lot 19 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/18/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  89. E103

    Lot 29 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/28/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  90. E104

    Lot 63 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/62/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  91. E105

    Lot 45 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/44/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  92. E106

    Lot 62 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/61/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  93. E107

    Lot 30 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/29/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  94. E108

    Lot 61 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/60/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  95. E109

    Lot 53 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/52/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  96. E110

    Lot 1 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/0/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  97. E111

    Lot 31 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/30/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  98. E112

    Lot 2 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/1/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  99. E113

    Lot 46 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/45/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  100. E114

    Lot 3 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/2/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  101. E115

    Lot 32 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/31/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  102. E116

    Lot 4 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/3/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  103. E117

    Lot 57 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/56/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  104. E118

    Lot 5 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/4/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  105. E119

    Lot 33 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/32/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  106. E120

    Lot 6 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/5/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  107. E121

    Lot 47 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/46/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  108. E122

    Lot 7 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/6/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  109. E123

    Lot 34 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/33/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  110. E124

    Lot 8 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/7/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  111. E125

    Lot 54 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/53/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  112. E126

    Lot 9 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/8/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  113. E127

    Lot 35 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/34/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  114. E128

    Lot 10 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/9/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  115. E129

    Lot 48 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/47/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  116. E130

    Lot 11 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/10/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  117. E131

    Lot 36 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/35/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  118. E132

    Lot 12 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/11/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  119. E133

    Lot 59 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/58/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  120. E134

    Lot 13 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/12/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  121. E135

    Lot 37 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/36/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  122. E136

    Lot 14 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/13/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  123. E137

    Lot 49 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/48/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  124. E138

    Lot 15 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/14/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  125. E139

    Lot 38 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/37/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  126. E140

    Lot 16 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/15/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  127. E141

    Lot 55 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/54/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  128. E142

    Lot 17 runs from 31 Mar 2027 to 31 Mar 2031.

    “2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”

    Document 102591-2026, field /tender/lots/16/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  129. E143

    The buyer's address is in United Kingdom.

    Document 102591-2026, field /parties/0/address/country, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  130. E144

    Tenders must be submitted by 8 Jan 2027, 12:00 UTC.

    “2027-01-08T12:00:00Z”

    Document 102591-2026, field /tender/tenderPeriod/endDate, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  131. E145

    The buyer describes the requirement in the notice.

    “Wirral Council (the "Council"), as the Contracting Authority, in partnership with Procure Partnerships Framework intends to let a National Developer Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for…”

    Document 102591-2026, field /tender/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  132. E146

    Delivery location: UKK, United Kingdom.

    Document 102591-2026, field /tender/items/62/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  133. E147

    Delivery location: UKC, United Kingdom.

    Document 102591-2026, field /tender/items/0/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  134. E148

    Delivery location: UKC, United Kingdom.

    Document 102591-2026, field /tender/items/1/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  135. E149

    Delivery location: UKC, United Kingdom.

    Document 102591-2026, field /tender/items/2/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  136. E150

    Delivery location: UKC, United Kingdom.

    Document 102591-2026, field /tender/items/3/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  137. E151

    Delivery location: UKE, United Kingdom.

    Document 102591-2026, field /tender/items/4/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  138. E152

    Delivery location: UKE, United Kingdom.

    Document 102591-2026, field /tender/items/5/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  139. E153

    Delivery location: UKE, United Kingdom.

    Document 102591-2026, field /tender/items/6/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  140. E154

    Delivery location: UKE, United Kingdom.

    Document 102591-2026, field /tender/items/7/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  141. E155

    Delivery location: UKD, United Kingdom.

    Document 102591-2026, field /tender/items/8/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  142. E156

    Delivery location: UKD, United Kingdom.

    Document 102591-2026, field /tender/items/10/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  143. E157

    Delivery location: UKD, United Kingdom.

    Document 102591-2026, field /tender/items/11/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  144. E158

    Delivery location: UKG, United Kingdom.

    Document 102591-2026, field /tender/items/12/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  145. E159

    Delivery location: UKG, United Kingdom.

    Document 102591-2026, field /tender/items/13/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  146. E160

    Delivery location: UKG, United Kingdom.

    Document 102591-2026, field /tender/items/14/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  147. E161

    Delivery location: UKG, United Kingdom.

    Document 102591-2026, field /tender/items/15/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  148. E162

    Delivery location: UKF, United Kingdom.

    Document 102591-2026, field /tender/items/16/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  149. E163

    Delivery location: UKF, United Kingdom.

    Document 102591-2026, field /tender/items/17/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  150. E164

    Delivery location: UKF, United Kingdom.

    Document 102591-2026, field /tender/items/18/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  151. E165

    Delivery location: UKF, United Kingdom.

    Document 102591-2026, field /tender/items/19/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  152. E166

    Delivery location: UKH, United Kingdom.

    Document 102591-2026, field /tender/items/20/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  153. E167

    Delivery location: UKH, United Kingdom.

    Document 102591-2026, field /tender/items/21/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  154. E168

    Delivery location: UKH, United Kingdom.

    Document 102591-2026, field /tender/items/22/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  155. E169

    Delivery location: UKH, United Kingdom.

    Document 102591-2026, field /tender/items/23/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  156. E170

    Delivery location: UKJ, United Kingdom.

    Document 102591-2026, field /tender/items/24/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  157. E171

    Delivery location: UKJ, United Kingdom.

    Document 102591-2026, field /tender/items/25/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  158. E172

    Delivery location: UKJ, United Kingdom.

    Document 102591-2026, field /tender/items/26/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  159. E173

    Delivery location: UKJ, United Kingdom.

    Document 102591-2026, field /tender/items/27/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  160. E174

    Delivery location: UKI, United Kingdom.

    Document 102591-2026, field /tender/items/28/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  161. E175

    Delivery location: UKI, United Kingdom.

    Document 102591-2026, field /tender/items/29/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  162. E176

    Delivery location: UKI, United Kingdom.

    Document 102591-2026, field /tender/items/30/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  163. E177

    Delivery location: UKI, United Kingdom.

    Document 102591-2026, field /tender/items/31/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  164. E178

    Delivery location: UKK, United Kingdom.

    Document 102591-2026, field /tender/items/32/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  165. E179

    Delivery location: UKK, United Kingdom.

    Document 102591-2026, field /tender/items/33/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  166. E180

    Delivery location: UKK, United Kingdom.

    Document 102591-2026, field /tender/items/34/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  167. E181

    Delivery location: UKC, United Kingdom.

    Document 102591-2026, field /tender/items/36/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  168. E182

    Delivery location: UKC, United Kingdom.

    Document 102591-2026, field /tender/items/37/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  169. E183

    Delivery location: UKC, United Kingdom.

    Document 102591-2026, field /tender/items/38/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  170. E184

    Delivery location: UKE, United Kingdom.

    Document 102591-2026, field /tender/items/39/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  171. E185

    Delivery location: UKE, United Kingdom.

    Document 102591-2026, field /tender/items/40/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  172. E186

    Delivery location: UKE, United Kingdom.

    Document 102591-2026, field /tender/items/41/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  173. E187

    Delivery location: UKD, United Kingdom.

    Document 102591-2026, field /tender/items/42/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  174. E188

    Delivery location: UKD, United Kingdom.

    Document 102591-2026, field /tender/items/43/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  175. E189

    Delivery location: UKD, United Kingdom.

    Document 102591-2026, field /tender/items/44/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  176. E190

    Delivery location: UKG, United Kingdom.

    Document 102591-2026, field /tender/items/45/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  177. E191

    Delivery location: UKG, United Kingdom.

    Document 102591-2026, field /tender/items/46/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  178. E192

    Delivery location: UKG, United Kingdom.

    Document 102591-2026, field /tender/items/47/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  179. E193

    Delivery location: UKF, United Kingdom.

    Document 102591-2026, field /tender/items/48/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  180. E194

    Delivery location: UKF, United Kingdom.

    Document 102591-2026, field /tender/items/49/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  181. E195

    Delivery location: UKF, United Kingdom.

    Document 102591-2026, field /tender/items/50/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  182. E196

    Delivery location: UKH, United Kingdom.

    Document 102591-2026, field /tender/items/51/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  183. E197

    Delivery location: UKH, United Kingdom.

    Document 102591-2026, field /tender/items/52/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  184. E198

    Delivery location: UKH, United Kingdom.

    Document 102591-2026, field /tender/items/53/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  185. E199

    Delivery location: UKJ, United Kingdom.

    Document 102591-2026, field /tender/items/54/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  186. E200

    Delivery location: UKJ, United Kingdom.

    Document 102591-2026, field /tender/items/55/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  187. E201

    Delivery location: UKJ, United Kingdom.

    Document 102591-2026, field /tender/items/56/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  188. E202

    Delivery location: UKI, United Kingdom.

    Document 102591-2026, field /tender/items/57/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  189. E203

    Delivery location: UKI, United Kingdom.

    Document 102591-2026, field /tender/items/58/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  190. E204

    Delivery location: UKI, United Kingdom.

    Document 102591-2026, field /tender/items/59/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  191. E205

    Delivery location: UKK, United Kingdom.

    Document 102591-2026, field /tender/items/60/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  192. E206

    Delivery location: UKK, United Kingdom.

    Document 102591-2026, field /tender/items/61/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  193. E207

    The legal basis is UKPGA 2023/54 (Procurement Act 2023).

    Document 102591-2026, field /tender/legalBasis/id, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  194. E208

    Lot 14 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/13/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  195. E209

    Lot 46 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/45/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  196. E210

    Lot 46 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/45/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  197. E211

    Lot 30 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/29/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  198. E212

    Lot 30 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/29/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  199. E213

    Lot 47 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/46/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  200. E214

    Lot 47 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/46/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  201. E215

    Lot 22 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/21/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  202. E216

    Lot 22 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/21/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  203. E217

    Lot 48 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/47/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  204. E218

    Lot 48 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/47/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  205. E219

    Lot 31 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/30/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  206. E220

    Lot 31 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/30/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  207. E221

    Lot 49 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/48/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  208. E222

    Lot 49 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/48/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  209. E223

    Lot 18 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/17/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  210. E224

    Lot 18 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/17/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  211. E225

    Lot 50 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/49/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  212. E226

    Lot 50 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/49/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  213. E227

    Lot 32 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/31/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  214. E228

    Lot 32 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/31/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  215. E229

    Lot 51 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/50/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  216. E230

    Lot 51 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/50/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  217. E231

    Lot 23 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/22/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  218. E232

    Lot 23 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/22/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  219. E233

    Lot 52 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/51/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  220. E234

    Lot 52 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/51/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  221. E235

    Lot 33 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/32/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  222. E236

    Lot 33 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/32/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  223. E237

    Lot 53 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/52/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  224. E238

    Lot 53 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/52/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  225. E239

    Lot 16 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/15/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  226. E240

    Lot 16 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/15/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  227. E241

    Lot 54 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/53/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  228. E242

    Lot 54 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/53/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  229. E243

    Lot 34 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/33/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  230. E244

    Lot 34 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/33/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  231. E245

    Lot 55 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/54/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  232. E246

    Lot 55 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/54/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  233. E247

    Lot 24 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/23/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  234. E248

    Lot 24 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/23/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  235. E249

    Lot 56 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/55/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  236. E250

    Lot 56 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/55/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  237. E251

    Lot 35 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/34/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  238. E252

    Lot 35 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/34/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  239. E253

    Lot 57 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/56/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  240. E254

    Lot 57 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/56/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  241. E255

    Lot 19 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/18/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  242. E256

    Lot 19 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/18/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  243. E257

    Lot 58 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/57/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  244. E258

    Lot 58 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/57/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  245. E259

    Lot 36 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/35/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  246. E260

    Lot 36 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/35/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  247. E261

    Lot 59 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/58/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  248. E262

    Lot 59 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/58/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  249. E263

    Lot 25 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/24/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  250. E264

    Lot 25 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/24/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  251. E265

    Lot 60 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/59/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  252. E266

    Lot 60 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/59/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  253. E267

    Lot 37 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/36/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  254. E268

    Lot 37 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/36/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  255. E269

    Lot 61 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/60/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  256. E270

    Lot 61 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/60/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  257. E271

    Lot 15 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/14/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  258. E272

    Lot 15 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/14/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  259. E273

    Lot 62 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/61/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  260. E274

    Lot 62 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/61/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  261. E275

    Lot 38 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/37/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  262. E276

    Lot 38 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/37/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  263. E277

    Lot 63 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/62/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  264. E278

    Lot 63 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/62/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  265. E279

    Lot 13 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/12/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  266. E280

    Lot 13 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/12/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  267. E281

    Lot 12 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/11/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  268. E282

    Lot 12 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/11/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  269. E283

    Lot 11 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/10/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  270. E284

    Lot 11 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/10/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  271. E285

    Lot 10 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/9/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  272. E286

    Lot 10 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/9/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  273. E287

    Lot 26 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/25/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  274. E288

    Lot 26 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/25/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  275. E289

    Lot 1 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/0/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  276. E290

    Lot 1 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/0/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  277. E291

    Lot 39 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/38/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  278. E292

    Lot 39 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/38/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  279. E293

    Lot 2 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/1/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  280. E294

    Lot 2 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/1/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  281. E295

    Lot 20 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/19/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  282. E296

    Lot 20 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/19/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  283. E297

    Lot 3 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/2/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  284. E298

    Lot 3 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/2/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  285. E299

    Lot 40 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/39/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  286. E300

    Lot 40 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/39/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  287. E301

    Lot 4 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/3/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  288. E302

    Lot 4 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/3/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  289. E303

    Lot 27 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/26/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  290. E304

    Lot 27 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/26/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  291. E305

    Lot 5 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/4/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  292. E306

    Lot 5 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/4/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  293. E307

    Lot 41 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/40/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  294. E308

    Lot 41 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/40/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  295. E309

    Lot 6 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/5/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  296. E310

    Lot 6 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/5/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  297. E311

    Lot 17 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/16/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  298. E312

    Lot 17 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/16/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  299. E313

    Lot 7 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/6/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  300. E314

    Lot 7 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/6/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  301. E315

    Lot 42 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/41/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  302. E316

    Lot 42 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/41/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  303. E317

    Lot 8 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/7/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  304. E318

    Lot 8 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/7/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  305. E319

    Lot 28 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/27/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  306. E320

    Lot 28 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/27/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  307. E321

    Lot 9 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/8/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  308. E322

    Lot 9 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/8/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  309. E323

    Lot 43 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/42/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  310. E324

    Lot 43 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/42/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  311. E325

    Lot 21 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/20/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  312. E326

    Lot 21 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/20/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  313. E327

    Lot 44 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/43/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  314. E328

    Lot 44 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/43/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  315. E329

    Lot 29 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/28/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  316. E330

    Lot 29 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/28/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  317. E331

    Lot 45 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/44/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  318. E332

    Lot 14 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).

    Document 102591-2026, field /tender/lots/13/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  319. E333

    Lot 45 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).

    Document 102591-2026, field /tender/lots/44/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  320. E334

    The buyer marks lot 14 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/13/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  321. E335

    The buyer marks lot 15 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/14/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  322. E336

    The buyer marks lot 15 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/14/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  323. E337

    The buyer marks lot 16 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/15/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  324. E338

    The buyer marks lot 16 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/15/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  325. E339

    The buyer marks lot 17 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/16/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  326. E340

    The buyer marks lot 17 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/16/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  327. E341

    The buyer marks lot 18 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/17/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  328. E342

    The buyer marks lot 18 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/17/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  329. E343

    The buyer marks lot 19 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/18/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  330. E344

    The buyer marks lot 19 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/18/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  331. E345

    The buyer marks lot 20 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/19/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  332. E346

    The buyer marks lot 20 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/19/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  333. E347

    The buyer marks lot 21 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/20/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  334. E348

    The buyer marks lot 21 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/20/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  335. E349

    The buyer marks lot 22 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/21/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  336. E350

    The buyer marks lot 22 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/21/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  337. E351

    The buyer marks lot 23 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/22/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  338. E352

    The buyer marks lot 23 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/22/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  339. E353

    The buyer marks lot 24 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/23/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  340. E354

    The buyer marks lot 24 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/23/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  341. E355

    The buyer marks lot 25 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/24/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  342. E356

    The buyer marks lot 25 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/24/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  343. E357

    The buyer marks lot 26 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/25/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  344. E358

    The buyer marks lot 26 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/25/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  345. E359

    The buyer marks lot 27 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/26/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  346. E360

    The buyer marks lot 27 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/26/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  347. E361

    The buyer marks lot 28 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/27/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  348. E362

    The buyer marks lot 28 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/27/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  349. E363

    The buyer marks lot 29 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/28/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  350. E364

    The buyer marks lot 29 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/28/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  351. E365

    The buyer marks lot 30 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/29/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  352. E366

    The buyer marks lot 30 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/29/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  353. E367

    The buyer marks lot 31 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/30/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  354. E368

    The buyer marks lot 31 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/30/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  355. E369

    The buyer marks lot 32 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/31/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  356. E370

    The buyer marks lot 32 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/31/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  357. E371

    The buyer marks lot 33 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/32/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  358. E372

    The buyer marks lot 33 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/32/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  359. E373

    The buyer marks lot 34 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/33/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  360. E374

    The buyer marks lot 34 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/33/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  361. E375

    The buyer marks lot 35 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/34/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  362. E376

    The buyer marks lot 35 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/34/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  363. E377

    The buyer marks lot 36 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/35/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  364. E378

    The buyer marks lot 36 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/35/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  365. E379

    The buyer marks lot 37 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/36/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  366. E380

    The buyer marks lot 37 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/36/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  367. E381

    The buyer marks lot 38 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/37/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  368. E382

    The buyer marks lot 38 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/37/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  369. E383

    The buyer marks lot 39 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/38/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  370. E384

    The buyer marks lot 39 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/38/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  371. E385

    The buyer marks lot 40 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/39/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  372. E386

    The buyer marks lot 40 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/39/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  373. E387

    The buyer marks lot 41 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/40/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  374. E388

    The buyer marks lot 41 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/40/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  375. E389

    The buyer marks lot 42 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/41/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  376. E390

    The buyer marks lot 42 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/41/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  377. E391

    The buyer marks lot 43 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/42/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  378. E392

    The buyer marks lot 43 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/42/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  379. E393

    The buyer marks lot 44 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/43/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  380. E394

    The buyer marks lot 44 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/43/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  381. E395

    The buyer marks lot 45 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/44/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  382. E396

    The buyer marks lot 45 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/44/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  383. E397

    The buyer marks lot 46 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/45/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  384. E398

    The buyer marks lot 46 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/45/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  385. E399

    The buyer marks lot 47 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/46/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  386. E400

    The buyer marks lot 47 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/46/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  387. E401

    The buyer marks lot 48 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/47/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  388. E402

    The buyer marks lot 48 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/47/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  389. E403

    The buyer marks lot 49 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/48/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  390. E404

    The buyer marks lot 49 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/48/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  391. E405

    The buyer marks lot 50 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/49/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  392. E406

    The buyer marks lot 50 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/49/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  393. E407

    The buyer marks lot 51 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/50/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  394. E408

    The buyer marks lot 51 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/50/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  395. E409

    The buyer marks lot 52 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/51/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  396. E410

    The buyer marks lot 52 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/51/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  397. E411

    The buyer marks lot 53 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/52/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  398. E412

    The buyer marks lot 53 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/52/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  399. E413

    The buyer marks lot 54 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/53/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  400. E414

    The buyer marks lot 54 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/53/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  401. E415

    The buyer marks lot 55 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/54/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  402. E416

    The buyer marks lot 55 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/54/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  403. E417

    The buyer marks lot 56 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/55/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  404. E418

    The buyer marks lot 56 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/55/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  405. E419

    The buyer marks lot 57 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/56/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  406. E420

    The buyer marks lot 57 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/56/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  407. E421

    The buyer marks lot 58 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/57/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  408. E422

    The buyer marks lot 58 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/57/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  409. E423

    The buyer marks lot 59 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/58/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  410. E424

    The buyer marks lot 59 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/58/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  411. E425

    The buyer marks lot 60 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/59/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  412. E426

    The buyer marks lot 60 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/59/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  413. E427

    The buyer marks lot 61 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/60/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  414. E428

    The buyer marks lot 61 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/60/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  415. E429

    The buyer marks lot 62 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/61/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  416. E430

    The buyer marks lot 62 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/61/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  417. E431

    The buyer marks lot 63 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/62/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  418. E432

    The buyer marks lot 63 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/62/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  419. E433

    The buyer marks lot 1 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/0/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  420. E434

    The buyer marks lot 1 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/0/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  421. E435

    The buyer marks lot 2 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/1/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  422. E436

    The buyer marks lot 2 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/1/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  423. E437

    The buyer marks lot 3 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/2/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  424. E438

    The buyer marks lot 3 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/2/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  425. E439

    The buyer marks lot 4 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/3/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  426. E440

    The buyer marks lot 4 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/3/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  427. E441

    The buyer marks lot 5 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/4/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  428. E442

    The buyer marks lot 5 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/4/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  429. E443

    The buyer marks lot 6 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/5/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  430. E444

    The buyer marks lot 6 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/5/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  431. E445

    The buyer marks lot 7 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/6/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  432. E446

    The buyer marks lot 7 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/6/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  433. E447

    The buyer marks lot 8 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/7/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  434. E448

    The buyer marks lot 8 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/7/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  435. E449

    The buyer marks lot 9 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/8/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  436. E450

    The buyer marks lot 9 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/8/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  437. E451

    The buyer marks lot 10 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/9/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  438. E452

    The buyer marks lot 10 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/9/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  439. E453

    The buyer marks lot 11 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/10/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  440. E454

    The buyer marks lot 11 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/10/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  441. E455

    The buyer marks lot 12 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/11/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  442. E456

    The buyer marks lot 12 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/11/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  443. E457

    The buyer marks lot 13 as suitable for small and medium-sized businesses.

    “sme: true”

    Document 102591-2026, field /tender/lots/12/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  444. E458

    The buyer marks lot 13 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/12/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  445. E459

    The buyer marks lot 14 as suitable for voluntary, community and social enterprises.

    “vcse: true”

    Document 102591-2026, field /tender/lots/13/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  446. E460

    Clarification questions close at 4 Dec 2026, 12:00 UTC.

    “2026-12-04T12:00:00Z”

    Document 102591-2026, field /tender/enquiryPeriod/endDate, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  447. E461

    This is a call for competition. Suppliers can respond.

    “tender”

    Document 102591-2026, field /tag, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  448. E462

    The procedure is: Open procedure.

    Document 102591-2026, field /tender/procurementMethodDetails, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  449. E463

    The notice was published on 29 Oct 2026.

    “2026-10-29T12:39:43Z”

    Document 102591-2026, field /tender/documents/1/datePublished, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  450. E464

    Find a Tender gives the tender status as active.

    Document 102591-2026, field /tender/status, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  451. E465

    The notice explains how to submit a tender.

    “The Council will be using the Chest Portal for this Procurement. To register on the Portal please use the link https://procontract.due-north.com and follow the instructions to register as a Supplier. If you are already registered on the Portal and wish to participate in this…”

    Document 102591-2026, field /tender/submissionMethodDetails, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  452. E466

    The notice is titled "National Developer Framework".

    Document 102591-2026, field /tender/title, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

  453. E467

    The stated value is GBP 12,000,000,000 excluding VAT.

    “12000000000 GBP”

    Document 102591-2026, field /tender/value/amount, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)

Contains public sector information from Find a Tender, licensed under the Open Government Licence v3.0. Data licence: Open Government Licence v3.0 (opens in a new tab). Personal contact details in notices are not stored or shown.

Updates

  1. First seen · 29 Oct 2026, 23:26 UTC

    The source published a call for competition with a future deadline.

    Source document 102591-2026