National Developer Framework[E466]
United KingdomWirralWirral Council[E64]
- Deadline[E144]
- Buyer's deadline: 8 Jan 2027, 12:00 UTC. UTC: 8 Jan 2027, 12:00 UTC.
- Value[E467]
- GBP 12,000,000,000
- Procedure[E462]
- Open procedureOne stage: bids go in by the deadline
- Bid language
- Your language
- Your fit
- Sign in to see your fit
In plain English
- What they want
Wirral Council (the "Council"), as the Contracting Authority, in partnership with Procure Partnerships Framework intends to let a National Developer Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for public sector development requirements across all English Regions.
- Who can bid
- The legal basis is UKPGA 2023/54 (Procurement Act 2023).
- Lot 31 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
- Lot 49 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
- Lot 1 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
- Lot 1 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Risks and unknowns
- UnknownWe read the published notice, not the full tender documents.
- Published[E463]
- 29 Oct 2026
- Last checked
- 20 hours ago
About the requirement · From the notice
Wirral Council (the "Council"), as the Contracting Authority, in partnership with Procure Partnerships Framework intends to let a National Developer Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for public sector development requirements across all English Regions. The Framework is designed to provide Public Sector Contracting Authorities with access to suitably qualified Development Partners capable of supporting projects across the full development lifecycle, from master planning and securing planning permission through to design, construction, delivery and, where applicable, aftercare of completed assets. The Framework will include a range of delivery models, including Development Agreements (DA), Joint Ventures (JV), Special Purpose Vehicles (SPV), Limited Liability Partnerships (LLP) and pre-development and feasibility support services. The Framework will be structured on a regional basis across England, aligned with established English regions (based on NUTS codes), enabling delivery through locally experienced partners with knowledge of regional markets and supply chains. The Framework consists of 63 Lots, comprising 36 Development Agreement Lots (Lots 1-36) and 27 Joint Venture / SPV Lots (Lots 37-63), split across nine English regions and a series of value bands. Development Partners may apply for one or more Lots and one or more regional areas, subject to the Lot constraints set out below. Full details of the Lot structure are set out under each Lot below. Potential Framework users may ther…[E145]
Preliminary, from the notice only
What the published notice says. This is not a recommendation. The tender documents can add or change requirements.
10 more requirements, possible blockers and open questions are in your free profile.
Create a free profileEligibility and requirements
- ConditionThe legal basis is UKPGA 2023/54 (Procurement Act 2023).[E207]
- ConditionLot 31 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E220]
- ConditionLot 49 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E222]
- ConditionLot 1 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E289]
- ConditionLot 1 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E290]
- ConditionLot 2 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E293]
- ConditionLot 2 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E294]
- ConditionLot 3 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E297]
- ConditionLot 3 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E298]
- ConditionLot 4 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E301]
- ConditionLot 4 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E302]
- ConditionLot 5 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E305]
- ConditionLot 5 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E306]
- ConditionLot 6 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E309]
- ConditionLot 6 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E310]
- ConditionLot 7 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E313]
- ConditionLot 7 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E314]
- ConditionLot 8 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E317]
- ConditionLot 8 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E318]
- ConditionLot 9 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E321]
- ConditionLot 9 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E322]
- ConditionLot 10 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E286]
- ConditionLot 10 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E285]
- ConditionLot 11 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E284]
- ConditionLot 11 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E283]
- ConditionLot 12 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E282]
- ConditionLot 12 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E281]
- ConditionLot 13 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E280]
- ConditionLot 13 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E279]
- ConditionLot 14 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E332]
- ConditionLot 14 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E208]
- ConditionLot 15 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E271]
- ConditionLot 15 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E272]
- ConditionLot 16 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E239]
- ConditionLot 16 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E240]
- ConditionLot 17 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E311]
- ConditionLot 17 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E312]
- ConditionLot 18 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E223]
- ConditionLot 18 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E224]
- ConditionLot 19 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E255]
- ConditionLot 19 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E256]
- ConditionLot 20 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E295]
- ConditionLot 20 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E296]
- ConditionLot 21 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E325]
- ConditionLot 21 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E326]
- ConditionLot 22 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E215]
- ConditionLot 22 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E216]
- ConditionLot 23 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E231]
- ConditionLot 23 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E232]
- ConditionLot 24 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E247]
- ConditionLot 24 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E248]
- ConditionLot 25 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E263]
- ConditionLot 25 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E264]
- ConditionLot 26 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E287]
- ConditionLot 26 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E288]
- ConditionLot 27 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E303]
- ConditionLot 27 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E304]
- ConditionLot 28 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E319]
- ConditionLot 28 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E320]
- ConditionLot 29 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E329]
- ConditionLot 29 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E330]
- ConditionLot 30 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E211]
- ConditionLot 30 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E212]
- ConditionLot 31 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E219]
- ConditionLot 32 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E227]
- ConditionLot 32 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E228]
- ConditionLot 33 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E235]
- ConditionLot 33 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E236]
- ConditionLot 34 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E243]
- ConditionLot 34 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E244]
- ConditionLot 35 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E251]
- ConditionLot 35 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E252]
- ConditionLot 36 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E259]
- ConditionLot 36 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E260]
- ConditionLot 37 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E267]
- ConditionLot 37 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E268]
- ConditionLot 38 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E275]
- ConditionLot 38 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E276]
- ConditionLot 39 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E291]
- ConditionLot 39 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E292]
- ConditionLot 40 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E299]
- ConditionLot 40 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E300]
- ConditionLot 41 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E307]
- ConditionLot 41 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E308]
- ConditionLot 42 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E315]
- ConditionLot 42 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E316]
- ConditionLot 43 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E323]
- ConditionLot 43 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E324]
- ConditionLot 44 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E327]
- ConditionLot 44 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E328]
- ConditionLot 45 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E331]
- ConditionLot 45 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E333]
- ConditionLot 46 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E209]
- ConditionLot 46 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E210]
- ConditionLot 47 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E213]
- ConditionLot 47 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E214]
- ConditionLot 48 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E217]
- ConditionLot 48 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E218]
- ConditionLot 49 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E221]
- ConditionLot 50 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E225]
- ConditionLot 50 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E226]
- ConditionLot 51 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E229]
- ConditionLot 51 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E230]
- ConditionLot 52 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E233]
- ConditionLot 52 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E234]
- ConditionLot 53 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E237]
- ConditionLot 53 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E238]
- ConditionLot 54 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E241]
- ConditionLot 54 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E242]
- ConditionLot 55 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E245]
- ConditionLot 55 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E246]
- ConditionLot 56 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E249]
- ConditionLot 56 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E250]
- ConditionLot 57 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E253]
- ConditionLot 57 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E254]
- ConditionLot 58 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E257]
- ConditionLot 58 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E258]
- ConditionLot 59 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E261]
- ConditionLot 59 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E262]
- ConditionLot 60 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E265]
- ConditionLot 60 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E266]
- ConditionLot 61 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E269]
- ConditionLot 61 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E270]
- ConditionLot 62 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E273]
- ConditionLot 62 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E274]
- ConditionLot 63 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E277]
- ConditionLot 63 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E278]
- ConditionThe buyer marks lot 17 as suitable for small and medium-sized businesses.[E339]
- ConditionThe buyer marks lot 48 as suitable for small and medium-sized businesses.[E401]
- ConditionThe buyer marks lot 48 as suitable for voluntary, community and social enterprises.[E402]
- ConditionThe buyer marks lot 16 as suitable for small and medium-sized businesses.[E337]
- ConditionThe buyer marks lot 15 as suitable for voluntary, community and social enterprises.[E336]
- ConditionThe buyer marks lot 49 as suitable for small and medium-sized businesses.[E403]
- ConditionThe buyer marks lot 49 as suitable for voluntary, community and social enterprises.[E404]
- ConditionThe buyer marks lot 15 as suitable for small and medium-sized businesses.[E335]
- ConditionThe buyer marks lot 1 as suitable for small and medium-sized businesses.[E433]
- ConditionThe buyer marks lot 50 as suitable for small and medium-sized businesses.[E405]
- ConditionThe buyer marks lot 50 as suitable for voluntary, community and social enterprises.[E406]
- ConditionThe buyer marks lot 14 as suitable for voluntary, community and social enterprises.[E459]
- ConditionThe buyer marks lot 14 as suitable for small and medium-sized businesses.[E334]
- ConditionThe buyer marks lot 51 as suitable for small and medium-sized businesses.[E407]
- ConditionThe buyer marks lot 51 as suitable for voluntary, community and social enterprises.[E408]
- ConditionThe buyer marks lot 13 as suitable for voluntary, community and social enterprises.[E458]
- ConditionThe buyer marks lot 13 as suitable for small and medium-sized businesses.[E457]
- ConditionThe buyer marks lot 52 as suitable for small and medium-sized businesses.[E409]
- ConditionThe buyer marks lot 52 as suitable for voluntary, community and social enterprises.[E410]
- ConditionThe buyer marks lot 12 as suitable for voluntary, community and social enterprises.[E456]
- ConditionThe buyer marks lot 12 as suitable for small and medium-sized businesses.[E455]
- ConditionThe buyer marks lot 53 as suitable for small and medium-sized businesses.[E411]
- ConditionThe buyer marks lot 53 as suitable for voluntary, community and social enterprises.[E412]
- ConditionThe buyer marks lot 11 as suitable for voluntary, community and social enterprises.[E454]
- ConditionThe buyer marks lot 11 as suitable for small and medium-sized businesses.[E453]
- ConditionThe buyer marks lot 54 as suitable for small and medium-sized businesses.[E413]
- ConditionThe buyer marks lot 54 as suitable for voluntary, community and social enterprises.[E414]
- ConditionThe buyer marks lot 10 as suitable for voluntary, community and social enterprises.[E452]
- ConditionThe buyer marks lot 10 as suitable for small and medium-sized businesses.[E451]
- ConditionThe buyer marks lot 55 as suitable for small and medium-sized businesses.[E415]
- ConditionThe buyer marks lot 55 as suitable for voluntary, community and social enterprises.[E416]
- ConditionThe buyer marks lot 9 as suitable for voluntary, community and social enterprises.[E450]
- ConditionThe buyer marks lot 9 as suitable for small and medium-sized businesses.[E449]
- ConditionThe buyer marks lot 56 as suitable for small and medium-sized businesses.[E417]
- ConditionThe buyer marks lot 56 as suitable for voluntary, community and social enterprises.[E418]
- ConditionThe buyer marks lot 8 as suitable for voluntary, community and social enterprises.[E448]
- ConditionThe buyer marks lot 8 as suitable for small and medium-sized businesses.[E447]
- ConditionThe buyer marks lot 57 as suitable for voluntary, community and social enterprises.[E420]
- ConditionThe buyer marks lot 7 as suitable for voluntary, community and social enterprises.[E446]
- ConditionThe buyer marks lot 7 as suitable for small and medium-sized businesses.[E445]
- ConditionThe buyer marks lot 58 as suitable for small and medium-sized businesses.[E421]
- ConditionThe buyer marks lot 58 as suitable for voluntary, community and social enterprises.[E422]
- ConditionThe buyer marks lot 6 as suitable for voluntary, community and social enterprises.[E444]
- ConditionThe buyer marks lot 6 as suitable for small and medium-sized businesses.[E443]
- ConditionThe buyer marks lot 59 as suitable for small and medium-sized businesses.[E423]
- ConditionThe buyer marks lot 59 as suitable for voluntary, community and social enterprises.[E424]
- ConditionThe buyer marks lot 5 as suitable for voluntary, community and social enterprises.[E442]
- ConditionThe buyer marks lot 5 as suitable for small and medium-sized businesses.[E441]
- ConditionThe buyer marks lot 60 as suitable for small and medium-sized businesses.[E425]
- ConditionThe buyer marks lot 60 as suitable for voluntary, community and social enterprises.[E426]
- ConditionThe buyer marks lot 16 as suitable for voluntary, community and social enterprises.[E338]
- ConditionThe buyer marks lot 4 as suitable for voluntary, community and social enterprises.[E440]
- ConditionThe buyer marks lot 61 as suitable for small and medium-sized businesses.[E427]
- ConditionThe buyer marks lot 61 as suitable for voluntary, community and social enterprises.[E428]
- ConditionThe buyer marks lot 4 as suitable for small and medium-sized businesses.[E439]
- ConditionThe buyer marks lot 3 as suitable for voluntary, community and social enterprises.[E438]
- ConditionThe buyer marks lot 62 as suitable for small and medium-sized businesses.[E429]
- ConditionThe buyer marks lot 62 as suitable for voluntary, community and social enterprises.[E430]
- ConditionThe buyer marks lot 3 as suitable for small and medium-sized businesses.[E437]
- ConditionThe buyer marks lot 2 as suitable for voluntary, community and social enterprises.[E436]
- ConditionThe buyer marks lot 63 as suitable for small and medium-sized businesses.[E431]
- ConditionThe buyer marks lot 63 as suitable for voluntary, community and social enterprises.[E432]
- ConditionThe buyer marks lot 2 as suitable for small and medium-sized businesses.[E435]
- ConditionThe buyer marks lot 32 as suitable for voluntary, community and social enterprises.[E370]
- ConditionThe buyer marks lot 1 as suitable for voluntary, community and social enterprises.[E434]
- ConditionThe buyer marks lot 32 as suitable for small and medium-sized businesses.[E369]
- ConditionThe buyer marks lot 33 as suitable for small and medium-sized businesses.[E371]
- ConditionThe buyer marks lot 33 as suitable for voluntary, community and social enterprises.[E372]
- ConditionThe buyer marks lot 31 as suitable for voluntary, community and social enterprises.[E368]
- ConditionThe buyer marks lot 57 as suitable for small and medium-sized businesses.[E419]
- ConditionThe buyer marks lot 31 as suitable for small and medium-sized businesses.[E367]
- ConditionThe buyer marks lot 34 as suitable for small and medium-sized businesses.[E373]
- ConditionThe buyer marks lot 34 as suitable for voluntary, community and social enterprises.[E374]
- ConditionThe buyer marks lot 30 as suitable for voluntary, community and social enterprises.[E366]
- ConditionThe buyer marks lot 30 as suitable for small and medium-sized businesses.[E365]
- ConditionThe buyer marks lot 35 as suitable for small and medium-sized businesses.[E375]
- ConditionThe buyer marks lot 35 as suitable for voluntary, community and social enterprises.[E376]
- ConditionThe buyer marks lot 29 as suitable for voluntary, community and social enterprises.[E364]
- ConditionThe buyer marks lot 29 as suitable for small and medium-sized businesses.[E363]
- ConditionThe buyer marks lot 36 as suitable for small and medium-sized businesses.[E377]
- ConditionThe buyer marks lot 36 as suitable for voluntary, community and social enterprises.[E378]
- ConditionThe buyer marks lot 28 as suitable for voluntary, community and social enterprises.[E362]
- ConditionThe buyer marks lot 28 as suitable for small and medium-sized businesses.[E361]
- ConditionThe buyer marks lot 37 as suitable for small and medium-sized businesses.[E379]
- ConditionThe buyer marks lot 37 as suitable for voluntary, community and social enterprises.[E380]
- ConditionThe buyer marks lot 27 as suitable for voluntary, community and social enterprises.[E360]
- ConditionThe buyer marks lot 27 as suitable for small and medium-sized businesses.[E359]
- ConditionThe buyer marks lot 38 as suitable for small and medium-sized businesses.[E381]
- ConditionThe buyer marks lot 38 as suitable for voluntary, community and social enterprises.[E382]
- ConditionThe buyer marks lot 26 as suitable for voluntary, community and social enterprises.[E358]
- ConditionThe buyer marks lot 26 as suitable for small and medium-sized businesses.[E357]
- ConditionThe buyer marks lot 39 as suitable for small and medium-sized businesses.[E383]
- ConditionThe buyer marks lot 39 as suitable for voluntary, community and social enterprises.[E384]
- ConditionThe buyer marks lot 45 as suitable for voluntary, community and social enterprises.[E396]
- ConditionThe buyer marks lot 25 as suitable for voluntary, community and social enterprises.[E356]
- ConditionThe buyer marks lot 25 as suitable for small and medium-sized businesses.[E355]
- ConditionThe buyer marks lot 40 as suitable for small and medium-sized businesses.[E385]
- ConditionThe buyer marks lot 40 as suitable for voluntary, community and social enterprises.[E386]
- ConditionThe buyer marks lot 24 as suitable for voluntary, community and social enterprises.[E354]
- ConditionThe buyer marks lot 24 as suitable for small and medium-sized businesses.[E353]
- ConditionThe buyer marks lot 41 as suitable for small and medium-sized businesses.[E387]
- ConditionThe buyer marks lot 41 as suitable for voluntary, community and social enterprises.[E388]
- ConditionThe buyer marks lot 23 as suitable for voluntary, community and social enterprises.[E352]
- ConditionThe buyer marks lot 23 as suitable for small and medium-sized businesses.[E351]
- ConditionThe buyer marks lot 42 as suitable for small and medium-sized businesses.[E389]
- ConditionThe buyer marks lot 42 as suitable for voluntary, community and social enterprises.[E390]
- ConditionThe buyer marks lot 22 as suitable for voluntary, community and social enterprises.[E350]
- ConditionThe buyer marks lot 22 as suitable for small and medium-sized businesses.[E349]
- ConditionThe buyer marks lot 43 as suitable for small and medium-sized businesses.[E391]
- ConditionThe buyer marks lot 43 as suitable for voluntary, community and social enterprises.[E392]
- ConditionThe buyer marks lot 21 as suitable for voluntary, community and social enterprises.[E348]
- ConditionThe buyer marks lot 21 as suitable for small and medium-sized businesses.[E347]
- ConditionThe buyer marks lot 44 as suitable for small and medium-sized businesses.[E393]
- ConditionThe buyer marks lot 44 as suitable for voluntary, community and social enterprises.[E394]
- ConditionThe buyer marks lot 20 as suitable for voluntary, community and social enterprises.[E346]
- ConditionThe buyer marks lot 20 as suitable for small and medium-sized businesses.[E345]
- ConditionThe buyer marks lot 45 as suitable for small and medium-sized businesses.[E395]
- ConditionThe buyer marks lot 19 as suitable for voluntary, community and social enterprises.[E344]
- ConditionThe buyer marks lot 19 as suitable for small and medium-sized businesses.[E343]
- ConditionThe buyer marks lot 46 as suitable for small and medium-sized businesses.[E397]
- ConditionThe buyer marks lot 46 as suitable for voluntary, community and social enterprises.[E398]
- ConditionThe buyer marks lot 18 as suitable for voluntary, community and social enterprises.[E342]
- ConditionThe buyer marks lot 18 as suitable for small and medium-sized businesses.[E341]
- ConditionThe buyer marks lot 47 as suitable for small and medium-sized businesses.[E399]
- ConditionThe buyer marks lot 47 as suitable for voluntary, community and social enterprises.[E400]
- ConditionThe buyer marks lot 17 as suitable for voluntary, community and social enterprises.[E340]
- DetailDelivery location: UKI, United Kingdom.[E204]
- DetailLot 59 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E1]
- DetailLot 63 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E2]
- DetailLot 62 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E3]
- DetailLot 61 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E4]
- DetailLot 60 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E5]
- DetailLot 1 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E6]
- DetailLot 2 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E7]
- DetailLot 3 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E8]
- DetailLot 4 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E9]
- DetailLot 5 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E10]
- DetailLot 6 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E11]
- DetailLot 7 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E12]
- DetailLot 8 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E13]
- DetailLot 9 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E14]
- DetailLot 10 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E15]
- DetailLot 11 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E16]
- DetailLot 12 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E17]
- DetailLot 13 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E18]
- DetailLot 14 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E19]
- DetailLot 15 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E20]
- DetailLot 16 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E21]
- DetailLot 17 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E22]
- DetailLot 18 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E23]
- DetailLot 19 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E24]
- DetailLot 20 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E25]
- DetailLot 21 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E26]
- DetailLot 22 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E27]
- DetailLot 23 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E28]
- DetailLot 24 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E29]
- DetailLot 25 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E30]
- DetailLot 26 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E31]
- DetailLot 27 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E32]
- DetailLot 28 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E33]
- DetailLot 29 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E34]
- DetailLot 30 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E35]
- DetailLot 31 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E36]
- DetailLot 32 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E37]
- DetailLot 33 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E38]
- DetailLot 34 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E39]
- DetailLot 35 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E40]
- DetailLot 36 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E41]
- DetailLot 37 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E42]
- DetailLot 38 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E43]
- DetailLot 39 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E44]
- DetailLot 40 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E45]
- DetailLot 41 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E46]
- DetailLot 42 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E47]
- DetailLot 43 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E48]
- DetailLot 44 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E49]
- DetailLot 45 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E50]
- DetailLot 46 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E51]
- DetailLot 47 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E52]
- DetailLot 48 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E53]
- DetailLot 49 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E54]
- DetailLot 50 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E55]
- DetailLot 51 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E56]
- DetailLot 52 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E57]
- DetailLot 53 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E58]
- DetailLot 54 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E59]
- DetailLot 55 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E60]
- DetailLot 56 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E61]
- DetailLot 57 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E62]
- DetailLot 58 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E63]
- DetailLot 27 runs from 31 Mar 2027 to 31 Mar 2031.[E80]
- DetailLot 44 runs from 31 Mar 2027 to 31 Mar 2031.[E81]
- DetailLot 28 runs from 31 Mar 2027 to 31 Mar 2031.[E82]
- DetailLot 60 runs from 31 Mar 2027 to 31 Mar 2031.[E83]
- DetailLot 50 runs from 31 Mar 2027 to 31 Mar 2031.[E84]
- DetailLot 40 runs from 31 Mar 2027 to 31 Mar 2031.[E85]
- DetailLot 20 runs from 31 Mar 2027 to 31 Mar 2031.[E86]
- DetailLot 58 runs from 31 Mar 2027 to 31 Mar 2031.[E87]
- DetailLot 21 runs from 31 Mar 2027 to 31 Mar 2031.[E88]
- DetailLot 41 runs from 31 Mar 2027 to 31 Mar 2031.[E89]
- DetailLot 22 runs from 31 Mar 2027 to 31 Mar 2031.[E90]
- DetailLot 51 runs from 31 Mar 2027 to 31 Mar 2031.[E91]
- DetailLot 23 runs from 31 Mar 2027 to 31 Mar 2031.[E92]
- DetailLot 42 runs from 31 Mar 2027 to 31 Mar 2031.[E93]
- DetailLot 24 runs from 31 Mar 2027 to 31 Mar 2031.[E94]
- DetailLot 56 runs from 31 Mar 2027 to 31 Mar 2031.[E95]
- DetailLot 25 runs from 31 Mar 2027 to 31 Mar 2031.[E96]
- DetailLot 43 runs from 31 Mar 2027 to 31 Mar 2031.[E97]
- DetailLot 26 runs from 31 Mar 2027 to 31 Mar 2031.[E98]
- DetailLot 52 runs from 31 Mar 2027 to 31 Mar 2031.[E99]
- DetailLot 39 runs from 31 Mar 2027 to 31 Mar 2031.[E100]
- DetailLot 18 runs from 31 Mar 2027 to 31 Mar 2031.[E101]
- DetailLot 19 runs from 31 Mar 2027 to 31 Mar 2031.[E102]
- DetailLot 29 runs from 31 Mar 2027 to 31 Mar 2031.[E103]
- DetailLot 63 runs from 31 Mar 2027 to 31 Mar 2031.[E104]
- DetailLot 45 runs from 31 Mar 2027 to 31 Mar 2031.[E105]
- DetailLot 62 runs from 31 Mar 2027 to 31 Mar 2031.[E106]
- DetailLot 30 runs from 31 Mar 2027 to 31 Mar 2031.[E107]
- DetailLot 61 runs from 31 Mar 2027 to 31 Mar 2031.[E108]
- DetailLot 53 runs from 31 Mar 2027 to 31 Mar 2031.[E109]
- DetailLot 1 runs from 31 Mar 2027 to 31 Mar 2031.[E110]
- DetailLot 31 runs from 31 Mar 2027 to 31 Mar 2031.[E111]
- DetailLot 2 runs from 31 Mar 2027 to 31 Mar 2031.[E112]
- DetailLot 46 runs from 31 Mar 2027 to 31 Mar 2031.[E113]
- DetailLot 3 runs from 31 Mar 2027 to 31 Mar 2031.[E114]
- DetailLot 32 runs from 31 Mar 2027 to 31 Mar 2031.[E115]
- DetailLot 4 runs from 31 Mar 2027 to 31 Mar 2031.[E116]
- DetailLot 57 runs from 31 Mar 2027 to 31 Mar 2031.[E117]
- DetailLot 5 runs from 31 Mar 2027 to 31 Mar 2031.[E118]
- DetailLot 33 runs from 31 Mar 2027 to 31 Mar 2031.[E119]
- DetailLot 6 runs from 31 Mar 2027 to 31 Mar 2031.[E120]
- DetailLot 47 runs from 31 Mar 2027 to 31 Mar 2031.[E121]
- DetailLot 7 runs from 31 Mar 2027 to 31 Mar 2031.[E122]
- DetailLot 34 runs from 31 Mar 2027 to 31 Mar 2031.[E123]
- DetailLot 8 runs from 31 Mar 2027 to 31 Mar 2031.[E124]
- DetailLot 54 runs from 31 Mar 2027 to 31 Mar 2031.[E125]
- DetailLot 9 runs from 31 Mar 2027 to 31 Mar 2031.[E126]
- DetailLot 35 runs from 31 Mar 2027 to 31 Mar 2031.[E127]
- DetailLot 10 runs from 31 Mar 2027 to 31 Mar 2031.[E128]
- DetailLot 48 runs from 31 Mar 2027 to 31 Mar 2031.[E129]
- DetailLot 11 runs from 31 Mar 2027 to 31 Mar 2031.[E130]
- DetailLot 36 runs from 31 Mar 2027 to 31 Mar 2031.[E131]
- DetailLot 12 runs from 31 Mar 2027 to 31 Mar 2031.[E132]
- DetailLot 59 runs from 31 Mar 2027 to 31 Mar 2031.[E133]
- DetailLot 13 runs from 31 Mar 2027 to 31 Mar 2031.[E134]
- DetailLot 37 runs from 31 Mar 2027 to 31 Mar 2031.[E135]
- DetailLot 14 runs from 31 Mar 2027 to 31 Mar 2031.[E136]
- DetailLot 49 runs from 31 Mar 2027 to 31 Mar 2031.[E137]
- DetailLot 15 runs from 31 Mar 2027 to 31 Mar 2031.[E138]
- DetailLot 38 runs from 31 Mar 2027 to 31 Mar 2031.[E139]
- DetailLot 16 runs from 31 Mar 2027 to 31 Mar 2031.[E140]
- DetailLot 55 runs from 31 Mar 2027 to 31 Mar 2031.[E141]
- DetailLot 17 runs from 31 Mar 2027 to 31 Mar 2031.[E142]
- DetailClarification questions close at 4 Dec 2026, 12:00 UTC.[E460]
- DetailThe notice explains how to submit a tender.[E465]
Tender documents
The tender documents are on the buyer's own portal, usually behind a free supplier registration. We never sign in for you. Download them there and add them below, or paste their public address.
What the check needs
- Instructions to bidders: still needed
- Specification: still needed
- Selection questionnaire: still needed
- Scoring and award criteria: still needed
Still needed: instructions to bidders, specification, selection questionnaire, scoring and award criteria. Add only these.
Add the documents yourself
Add only the missing parts from the buyer's portal: instructions to bidders, specification, selection questionnaire, scoring and award criteria. We read every page and check it against your company.
Sign in to upload documents.
Or forward them by email
Sign in to get a forwarding address for this tender.
- Private to your organisationOnly people in your organisation can see the files.
- Deleted after 90 daysOr straight away when you delete them.
- Never used to train AIFiles are read for your check only.
Already written your answers?
Check your draft against this tender's questions, limits and your evidence before you submit.
Review my draft · £199See a sample reviewWirral Council
- Tender documents
- find-tender.service.gov.uk/…
- Shared mailbox
- procurementcorporate@wirral.gov.uk
- Address
- Town Hall, Brighton Street, CH44 8ED, Wallasey
How to ask a question
Ask clarification questions through the buyer's own process, usually its procurement portal, before the clarification deadline. Answers are normally shared with every bidder. Open the buyer's route
We show only the organisation's own contact route as published: its website, portal, shared mailboxes and main lines. Never a named person.
Evidence467 facts from the notice · ShowHide
Every fact on this page comes from the published notice. Each entry shows the document and the field it was read from.
- E1
Lot 59 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/58/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E2
Lot 63 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/62/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E3
Lot 62 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/61/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E4
Lot 61 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/60/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E5
Lot 60 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/59/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E6
Lot 1 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/0/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E7
Lot 2 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/1/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E8
Lot 3 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/2/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E9
Lot 4 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/3/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E10
Lot 5 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/4/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E11
Lot 6 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/5/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E12
Lot 7 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/6/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E13
Lot 8 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/7/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E14
Lot 9 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/8/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E15
Lot 10 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/9/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E16
Lot 11 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/10/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E17
Lot 12 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/11/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E18
Lot 13 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/12/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E19
Lot 14 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/13/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E20
Lot 15 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/14/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E21
Lot 16 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/15/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E22
Lot 17 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/16/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E23
Lot 18 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/17/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E24
Lot 19 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/18/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E25
Lot 20 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/19/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E26
Lot 21 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/20/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E27
Lot 22 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/21/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E28
Lot 23 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/22/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E29
Lot 24 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/23/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E30
Lot 25 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/24/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E31
Lot 26 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/25/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E32
Lot 27 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/26/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E33
Lot 28 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/27/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E34
Lot 29 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/28/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E35
Lot 30 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/29/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E36
Lot 31 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/30/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E37
Lot 32 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/31/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E38
Lot 33 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/32/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E39
Lot 34 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/33/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E40
Lot 35 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/34/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E41
Lot 36 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/35/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E42
Lot 37 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/36/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E43
Lot 38 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/37/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E44
Lot 39 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/38/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E45
Lot 40 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/39/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E46
Lot 41 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/40/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E47
Lot 42 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/41/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E48
Lot 43 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/42/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E49
Lot 44 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/43/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E50
Lot 45 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/44/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E51
Lot 46 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/45/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E52
Lot 47 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/46/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E53
Lot 48 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/47/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E54
Lot 49 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/48/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E55
Lot 50 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/49/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E56
Lot 51 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/50/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E57
Lot 52 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/51/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E58
Lot 53 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/52/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E59
Lot 54 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/53/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E60
Lot 55 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/54/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E61
Lot 56 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/55/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E62
Lot 57 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/56/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E63
Lot 58 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Document 102591-2026, field /tender/lots/57/awardCriteria/weightingDescription, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E64
The buyer is Wirral Council.
Document 102591-2026, field /buyer/name, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E65–E79
Classified under CPV: Building construction work (45210000); Engineering works and construction works (45220000); Construction work for railways and cable transport systems (45234000); Construction work for airfields, runways and manoeuvring surfaces (45235000); Harbour construction works (45241000); Waterside leisure facilities construction work (45242000); Marine construction works (45244000); Construction work for dams, canals, irrigation channels and aqueducts (45247000); Construction works for sewage treatment plants, purification plants and refuse incineration plants (45252000); Real estate services (70000000); Feasibility study, advisory service, analysis (71241000); Project and design preparation, estimation of costs (71242000); Civil engineering consultancy services (71311000); Structural engineering consultancy services (71312000); Engineering design services (71320000).
read 29 Oct 2026, 23:26 UTC
- E80
Lot 27 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/26/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E81
Lot 44 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/43/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E82
Lot 28 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/27/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E83
Lot 60 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/59/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E84
Lot 50 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/49/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E85
Lot 40 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/39/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E86
Lot 20 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/19/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E87
Lot 58 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/57/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E88
Lot 21 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/20/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E89
Lot 41 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/40/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E90
Lot 22 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/21/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E91
Lot 51 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/50/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E92
Lot 23 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/22/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E93
Lot 42 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/41/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E94
Lot 24 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/23/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E95
Lot 56 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/55/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E96
Lot 25 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/24/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E97
Lot 43 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/42/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E98
Lot 26 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/25/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E99
Lot 52 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/51/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E100
Lot 39 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/38/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E101
Lot 18 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/17/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E102
Lot 19 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/18/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E103
Lot 29 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/28/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E104
Lot 63 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/62/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E105
Lot 45 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/44/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E106
Lot 62 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/61/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E107
Lot 30 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/29/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E108
Lot 61 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/60/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E109
Lot 53 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/52/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E110
Lot 1 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/0/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E111
Lot 31 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/30/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E112
Lot 2 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/1/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E113
Lot 46 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/45/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E114
Lot 3 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/2/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E115
Lot 32 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/31/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E116
Lot 4 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/3/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E117
Lot 57 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/56/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E118
Lot 5 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/4/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E119
Lot 33 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/32/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E120
Lot 6 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/5/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E121
Lot 47 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/46/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E122
Lot 7 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/6/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E123
Lot 34 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/33/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E124
Lot 8 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/7/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E125
Lot 54 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/53/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E126
Lot 9 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/8/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E127
Lot 35 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/34/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E128
Lot 10 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/9/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E129
Lot 48 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/47/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E130
Lot 11 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/10/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E131
Lot 36 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/35/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E132
Lot 12 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/11/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E133
Lot 59 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/58/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E134
Lot 13 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/12/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E135
Lot 37 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/36/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E136
Lot 14 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/13/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E137
Lot 49 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/48/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E138
Lot 15 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/14/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E139
Lot 38 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/37/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E140
Lot 16 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/15/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E141
Lot 55 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/54/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E142
Lot 17 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Document 102591-2026, field /tender/lots/16/contractPeriod, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E143
The buyer's address is in United Kingdom.
Document 102591-2026, field /parties/0/address/country, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E144
Tenders must be submitted by 8 Jan 2027, 12:00 UTC.
“2027-01-08T12:00:00Z”
Document 102591-2026, field /tender/tenderPeriod/endDate, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E145
The buyer describes the requirement in the notice.
“Wirral Council (the "Council"), as the Contracting Authority, in partnership with Procure Partnerships Framework intends to let a National Developer Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for…”
Document 102591-2026, field /tender/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E146
Delivery location: UKK, United Kingdom.
Document 102591-2026, field /tender/items/62/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E147
Delivery location: UKC, United Kingdom.
Document 102591-2026, field /tender/items/0/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E148
Delivery location: UKC, United Kingdom.
Document 102591-2026, field /tender/items/1/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E149
Delivery location: UKC, United Kingdom.
Document 102591-2026, field /tender/items/2/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E150
Delivery location: UKC, United Kingdom.
Document 102591-2026, field /tender/items/3/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E151
Delivery location: UKE, United Kingdom.
Document 102591-2026, field /tender/items/4/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E152
Delivery location: UKE, United Kingdom.
Document 102591-2026, field /tender/items/5/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E153
Delivery location: UKE, United Kingdom.
Document 102591-2026, field /tender/items/6/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E154
Delivery location: UKE, United Kingdom.
Document 102591-2026, field /tender/items/7/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E155
Delivery location: UKD, United Kingdom.
Document 102591-2026, field /tender/items/8/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E156
Delivery location: UKD, United Kingdom.
Document 102591-2026, field /tender/items/10/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E157
Delivery location: UKD, United Kingdom.
Document 102591-2026, field /tender/items/11/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E158
Delivery location: UKG, United Kingdom.
Document 102591-2026, field /tender/items/12/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E159
Delivery location: UKG, United Kingdom.
Document 102591-2026, field /tender/items/13/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E160
Delivery location: UKG, United Kingdom.
Document 102591-2026, field /tender/items/14/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E161
Delivery location: UKG, United Kingdom.
Document 102591-2026, field /tender/items/15/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E162
Delivery location: UKF, United Kingdom.
Document 102591-2026, field /tender/items/16/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E163
Delivery location: UKF, United Kingdom.
Document 102591-2026, field /tender/items/17/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E164
Delivery location: UKF, United Kingdom.
Document 102591-2026, field /tender/items/18/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E165
Delivery location: UKF, United Kingdom.
Document 102591-2026, field /tender/items/19/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E166
Delivery location: UKH, United Kingdom.
Document 102591-2026, field /tender/items/20/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E167
Delivery location: UKH, United Kingdom.
Document 102591-2026, field /tender/items/21/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E168
Delivery location: UKH, United Kingdom.
Document 102591-2026, field /tender/items/22/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E169
Delivery location: UKH, United Kingdom.
Document 102591-2026, field /tender/items/23/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E170
Delivery location: UKJ, United Kingdom.
Document 102591-2026, field /tender/items/24/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E171
Delivery location: UKJ, United Kingdom.
Document 102591-2026, field /tender/items/25/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E172
Delivery location: UKJ, United Kingdom.
Document 102591-2026, field /tender/items/26/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E173
Delivery location: UKJ, United Kingdom.
Document 102591-2026, field /tender/items/27/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E174
Delivery location: UKI, United Kingdom.
Document 102591-2026, field /tender/items/28/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E175
Delivery location: UKI, United Kingdom.
Document 102591-2026, field /tender/items/29/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E176
Delivery location: UKI, United Kingdom.
Document 102591-2026, field /tender/items/30/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E177
Delivery location: UKI, United Kingdom.
Document 102591-2026, field /tender/items/31/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E178
Delivery location: UKK, United Kingdom.
Document 102591-2026, field /tender/items/32/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E179
Delivery location: UKK, United Kingdom.
Document 102591-2026, field /tender/items/33/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E180
Delivery location: UKK, United Kingdom.
Document 102591-2026, field /tender/items/34/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E181
Delivery location: UKC, United Kingdom.
Document 102591-2026, field /tender/items/36/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E182
Delivery location: UKC, United Kingdom.
Document 102591-2026, field /tender/items/37/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E183
Delivery location: UKC, United Kingdom.
Document 102591-2026, field /tender/items/38/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E184
Delivery location: UKE, United Kingdom.
Document 102591-2026, field /tender/items/39/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E185
Delivery location: UKE, United Kingdom.
Document 102591-2026, field /tender/items/40/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E186
Delivery location: UKE, United Kingdom.
Document 102591-2026, field /tender/items/41/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E187
Delivery location: UKD, United Kingdom.
Document 102591-2026, field /tender/items/42/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E188
Delivery location: UKD, United Kingdom.
Document 102591-2026, field /tender/items/43/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E189
Delivery location: UKD, United Kingdom.
Document 102591-2026, field /tender/items/44/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E190
Delivery location: UKG, United Kingdom.
Document 102591-2026, field /tender/items/45/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E191
Delivery location: UKG, United Kingdom.
Document 102591-2026, field /tender/items/46/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E192
Delivery location: UKG, United Kingdom.
Document 102591-2026, field /tender/items/47/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E193
Delivery location: UKF, United Kingdom.
Document 102591-2026, field /tender/items/48/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E194
Delivery location: UKF, United Kingdom.
Document 102591-2026, field /tender/items/49/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E195
Delivery location: UKF, United Kingdom.
Document 102591-2026, field /tender/items/50/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E196
Delivery location: UKH, United Kingdom.
Document 102591-2026, field /tender/items/51/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E197
Delivery location: UKH, United Kingdom.
Document 102591-2026, field /tender/items/52/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E198
Delivery location: UKH, United Kingdom.
Document 102591-2026, field /tender/items/53/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E199
Delivery location: UKJ, United Kingdom.
Document 102591-2026, field /tender/items/54/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E200
Delivery location: UKJ, United Kingdom.
Document 102591-2026, field /tender/items/55/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E201
Delivery location: UKJ, United Kingdom.
Document 102591-2026, field /tender/items/56/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E202
Delivery location: UKI, United Kingdom.
Document 102591-2026, field /tender/items/57/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E203
Delivery location: UKI, United Kingdom.
Document 102591-2026, field /tender/items/58/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E204
Delivery location: UKI, United Kingdom.
Document 102591-2026, field /tender/items/59/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E205
Delivery location: UKK, United Kingdom.
Document 102591-2026, field /tender/items/60/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E206
Delivery location: UKK, United Kingdom.
Document 102591-2026, field /tender/items/61/deliveryAddresses/0, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E207
The legal basis is UKPGA 2023/54 (Procurement Act 2023).
Document 102591-2026, field /tender/legalBasis/id, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E208
Lot 14 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/13/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E209
Lot 46 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/45/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E210
Lot 46 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/45/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E211
Lot 30 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/29/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E212
Lot 30 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/29/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E213
Lot 47 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/46/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E214
Lot 47 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/46/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E215
Lot 22 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/21/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E216
Lot 22 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/21/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E217
Lot 48 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/47/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E218
Lot 48 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/47/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E219
Lot 31 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/30/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E220
Lot 31 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/30/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E221
Lot 49 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/48/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E222
Lot 49 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/48/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E223
Lot 18 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/17/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E224
Lot 18 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/17/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E225
Lot 50 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/49/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E226
Lot 50 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/49/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E227
Lot 32 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/31/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E228
Lot 32 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/31/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E229
Lot 51 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/50/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E230
Lot 51 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/50/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E231
Lot 23 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/22/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E232
Lot 23 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/22/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E233
Lot 52 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/51/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E234
Lot 52 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/51/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E235
Lot 33 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/32/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E236
Lot 33 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/32/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E237
Lot 53 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/52/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E238
Lot 53 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/52/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E239
Lot 16 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/15/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E240
Lot 16 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/15/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E241
Lot 54 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/53/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E242
Lot 54 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/53/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E243
Lot 34 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/33/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E244
Lot 34 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/33/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E245
Lot 55 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/54/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E246
Lot 55 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/54/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E247
Lot 24 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/23/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E248
Lot 24 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/23/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E249
Lot 56 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/55/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E250
Lot 56 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/55/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E251
Lot 35 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/34/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E252
Lot 35 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/34/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E253
Lot 57 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/56/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E254
Lot 57 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/56/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E255
Lot 19 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/18/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E256
Lot 19 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/18/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E257
Lot 58 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/57/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E258
Lot 58 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/57/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E259
Lot 36 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/35/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E260
Lot 36 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/35/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E261
Lot 59 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/58/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E262
Lot 59 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/58/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E263
Lot 25 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/24/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E264
Lot 25 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/24/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E265
Lot 60 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/59/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E266
Lot 60 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/59/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E267
Lot 37 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/36/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E268
Lot 37 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/36/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E269
Lot 61 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/60/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E270
Lot 61 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/60/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E271
Lot 15 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/14/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E272
Lot 15 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/14/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E273
Lot 62 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/61/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E274
Lot 62 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/61/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E275
Lot 38 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/37/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E276
Lot 38 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/37/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E277
Lot 63 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/62/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E278
Lot 63 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/62/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E279
Lot 13 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/12/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E280
Lot 13 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/12/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E281
Lot 12 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/11/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E282
Lot 12 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/11/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E283
Lot 11 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/10/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E284
Lot 11 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/10/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E285
Lot 10 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/9/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E286
Lot 10 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/9/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E287
Lot 26 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/25/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E288
Lot 26 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/25/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E289
Lot 1 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/0/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E290
Lot 1 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/0/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E291
Lot 39 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/38/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E292
Lot 39 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/38/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E293
Lot 2 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/1/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E294
Lot 2 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/1/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E295
Lot 20 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/19/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E296
Lot 20 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/19/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E297
Lot 3 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/2/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E298
Lot 3 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/2/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E299
Lot 40 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/39/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E300
Lot 40 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/39/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E301
Lot 4 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/3/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E302
Lot 4 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/3/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E303
Lot 27 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/26/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E304
Lot 27 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/26/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E305
Lot 5 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/4/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E306
Lot 5 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/4/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E307
Lot 41 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/40/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E308
Lot 41 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/40/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E309
Lot 6 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/5/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E310
Lot 6 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/5/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E311
Lot 17 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/16/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E312
Lot 17 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/16/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E313
Lot 7 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/6/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E314
Lot 7 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/6/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E315
Lot 42 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/41/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E316
Lot 42 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/41/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E317
Lot 8 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/7/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E318
Lot 8 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/7/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E319
Lot 28 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/27/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E320
Lot 28 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/27/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E321
Lot 9 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/8/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E322
Lot 9 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/8/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E323
Lot 43 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/42/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E324
Lot 43 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/42/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E325
Lot 21 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/20/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E326
Lot 21 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/20/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E327
Lot 44 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/43/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E328
Lot 44 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/43/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E329
Lot 29 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/28/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E330
Lot 29 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/28/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E331
Lot 45 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/44/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E332
Lot 14 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Document 102591-2026, field /tender/lots/13/selectionCriteria/criteria/0/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E333
Lot 45 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Document 102591-2026, field /tender/lots/44/selectionCriteria/criteria/1/description, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E334
The buyer marks lot 14 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/13/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E335
The buyer marks lot 15 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/14/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E336
The buyer marks lot 15 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/14/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E337
The buyer marks lot 16 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/15/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E338
The buyer marks lot 16 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/15/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E339
The buyer marks lot 17 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/16/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E340
The buyer marks lot 17 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/16/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E341
The buyer marks lot 18 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/17/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E342
The buyer marks lot 18 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/17/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E343
The buyer marks lot 19 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/18/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E344
The buyer marks lot 19 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/18/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E345
The buyer marks lot 20 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/19/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E346
The buyer marks lot 20 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/19/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E347
The buyer marks lot 21 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/20/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E348
The buyer marks lot 21 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/20/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E349
The buyer marks lot 22 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/21/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E350
The buyer marks lot 22 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/21/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E351
The buyer marks lot 23 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/22/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E352
The buyer marks lot 23 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/22/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E353
The buyer marks lot 24 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/23/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E354
The buyer marks lot 24 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/23/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E355
The buyer marks lot 25 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/24/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E356
The buyer marks lot 25 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/24/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E357
The buyer marks lot 26 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/25/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E358
The buyer marks lot 26 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/25/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E359
The buyer marks lot 27 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/26/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E360
The buyer marks lot 27 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/26/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E361
The buyer marks lot 28 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/27/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E362
The buyer marks lot 28 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/27/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E363
The buyer marks lot 29 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/28/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E364
The buyer marks lot 29 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/28/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E365
The buyer marks lot 30 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/29/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E366
The buyer marks lot 30 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/29/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E367
The buyer marks lot 31 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/30/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E368
The buyer marks lot 31 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/30/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E369
The buyer marks lot 32 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/31/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E370
The buyer marks lot 32 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/31/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E371
The buyer marks lot 33 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/32/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E372
The buyer marks lot 33 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/32/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E373
The buyer marks lot 34 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/33/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E374
The buyer marks lot 34 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/33/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E375
The buyer marks lot 35 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/34/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E376
The buyer marks lot 35 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/34/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E377
The buyer marks lot 36 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/35/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E378
The buyer marks lot 36 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/35/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E379
The buyer marks lot 37 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/36/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E380
The buyer marks lot 37 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/36/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E381
The buyer marks lot 38 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/37/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E382
The buyer marks lot 38 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/37/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E383
The buyer marks lot 39 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/38/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E384
The buyer marks lot 39 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/38/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E385
The buyer marks lot 40 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/39/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E386
The buyer marks lot 40 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/39/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E387
The buyer marks lot 41 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/40/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E388
The buyer marks lot 41 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/40/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E389
The buyer marks lot 42 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/41/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E390
The buyer marks lot 42 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/41/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E391
The buyer marks lot 43 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/42/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E392
The buyer marks lot 43 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/42/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E393
The buyer marks lot 44 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/43/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E394
The buyer marks lot 44 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/43/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E395
The buyer marks lot 45 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/44/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E396
The buyer marks lot 45 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/44/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E397
The buyer marks lot 46 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/45/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E398
The buyer marks lot 46 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/45/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E399
The buyer marks lot 47 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/46/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E400
The buyer marks lot 47 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/46/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E401
The buyer marks lot 48 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/47/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E402
The buyer marks lot 48 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/47/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E403
The buyer marks lot 49 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/48/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E404
The buyer marks lot 49 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/48/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E405
The buyer marks lot 50 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/49/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E406
The buyer marks lot 50 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/49/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E407
The buyer marks lot 51 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/50/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E408
The buyer marks lot 51 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/50/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E409
The buyer marks lot 52 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/51/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E410
The buyer marks lot 52 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/51/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E411
The buyer marks lot 53 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/52/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E412
The buyer marks lot 53 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/52/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E413
The buyer marks lot 54 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/53/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E414
The buyer marks lot 54 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/53/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E415
The buyer marks lot 55 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/54/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E416
The buyer marks lot 55 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/54/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E417
The buyer marks lot 56 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/55/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E418
The buyer marks lot 56 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/55/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E419
The buyer marks lot 57 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/56/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E420
The buyer marks lot 57 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/56/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E421
The buyer marks lot 58 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/57/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E422
The buyer marks lot 58 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/57/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E423
The buyer marks lot 59 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/58/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E424
The buyer marks lot 59 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/58/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E425
The buyer marks lot 60 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/59/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E426
The buyer marks lot 60 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/59/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E427
The buyer marks lot 61 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/60/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E428
The buyer marks lot 61 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/60/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E429
The buyer marks lot 62 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/61/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E430
The buyer marks lot 62 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/61/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E431
The buyer marks lot 63 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/62/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E432
The buyer marks lot 63 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/62/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E433
The buyer marks lot 1 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/0/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E434
The buyer marks lot 1 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/0/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E435
The buyer marks lot 2 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/1/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E436
The buyer marks lot 2 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/1/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E437
The buyer marks lot 3 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/2/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E438
The buyer marks lot 3 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/2/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E439
The buyer marks lot 4 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/3/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E440
The buyer marks lot 4 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/3/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E441
The buyer marks lot 5 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/4/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E442
The buyer marks lot 5 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/4/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E443
The buyer marks lot 6 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/5/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E444
The buyer marks lot 6 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/5/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E445
The buyer marks lot 7 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/6/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E446
The buyer marks lot 7 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/6/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E447
The buyer marks lot 8 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/7/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E448
The buyer marks lot 8 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/7/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E449
The buyer marks lot 9 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/8/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E450
The buyer marks lot 9 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/8/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E451
The buyer marks lot 10 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/9/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E452
The buyer marks lot 10 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/9/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E453
The buyer marks lot 11 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/10/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E454
The buyer marks lot 11 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/10/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E455
The buyer marks lot 12 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/11/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E456
The buyer marks lot 12 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/11/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E457
The buyer marks lot 13 as suitable for small and medium-sized businesses.
“sme: true”
Document 102591-2026, field /tender/lots/12/suitability/sme, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E458
The buyer marks lot 13 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/12/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E459
The buyer marks lot 14 as suitable for voluntary, community and social enterprises.
“vcse: true”
Document 102591-2026, field /tender/lots/13/suitability/vcse, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E460
Clarification questions close at 4 Dec 2026, 12:00 UTC.
“2026-12-04T12:00:00Z”
Document 102591-2026, field /tender/enquiryPeriod/endDate, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E461
This is a call for competition. Suppliers can respond.
“tender”
Document 102591-2026, field /tag, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E462
The procedure is: Open procedure.
Document 102591-2026, field /tender/procurementMethodDetails, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E463
The notice was published on 29 Oct 2026.
“2026-10-29T12:39:43Z”
Document 102591-2026, field /tender/documents/1/datePublished, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E464
Find a Tender gives the tender status as active.
Document 102591-2026, field /tender/status, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E465
The notice explains how to submit a tender.
“The Council will be using the Chest Portal for this Procurement. To register on the Portal please use the link https://procontract.due-north.com and follow the instructions to register as a Supplier. If you are already registered on the Portal and wish to participate in this…”
Document 102591-2026, field /tender/submissionMethodDetails, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E466
The notice is titled "National Developer Framework".
Document 102591-2026, field /tender/title, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
- E467
The stated value is GBP 12,000,000,000 excluding VAT.
“12000000000 GBP”
Document 102591-2026, field /tender/value/amount, read 29 Oct 2026, 23:26 UTC · source (opens in a new tab)
Contains public sector information from Find a Tender, licensed under the Open Government Licence v3.0. Data licence: Open Government Licence v3.0 (opens in a new tab). Personal contact details in notices are not stored or shown.
Updates
First seen · 29 Oct 2026, 23:26 UTC
The source published a call for competition with a future deadline.
Source document 102591-2026