National Developer Framework[E466]
Regno UnitoWirralWirral Council[E64]
- Scadenza[E144]
- Scadenza dell’ente: 8 gen 2027, 12:00 UTC. UTC: 8 gen 2027, 12:00 UTC.
- Valore[E467]
- GBP 12.000.000.000
- Procedura[E462]
- Open procedureUna fase: offerte entro la scadenza
- Lingua dell’offerta
- La tua lingua
- Il tuo adattamento
- Accedi per vedere la compatibilità
In parole semplici
- Cosa cercano
- Sto scrivendo un breve riepilogo nella tua lingua…
- Chi può partecipare
- The legal basis is UKPGA 2023/54 (Procurement Act 2023).
- Lot 31 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
- Lot 49 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
- Lot 1 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
- Lot 1 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Rischi e incognite
- SconosciutoWe read the published notice, not the full tender documents.
- Pubblicato[E463]
- 29 ott 2026
- Ultimo controllo
- 4 ore fa
Sul fabbisogno · Dal bando
Wirral Council (the "Council"), as the Contracting Authority, in partnership with Procure Partnerships Framework intends to let a National Developer Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for public sector development requirements across all English Regions. The Framework is designed to provide Public Sector Contracting Authorities with access to suitably qualified Development Partners capable of supporting projects across the full development lifecycle, from master planning and securing planning permission through to design, construction, delivery and, where applicable, aftercare of completed assets. The Framework will include a range of delivery models, including Development Agreements (DA), Joint Ventures (JV), Special Purpose Vehicles (SPV), Limited Liability Partnerships (LLP) and pre-development and feasibility support services. The Framework will be structured on a regional basis across England, aligned with established English regions (based on NUTS codes), enabling delivery through locally experienced partners with knowledge of regional markets and supply chains. The Framework consists of 63 Lots, comprising 36 Development Agreement Lots (Lots 1-36) and 27 Joint Venture / SPV Lots (Lots 37-63), split across nine English regions and a series of value bands. Development Partners may apply for one or more Lots and one or more regional areas, subject to the Lot constraints set out below. Full details of the Lot structure are set out under each Lot below. Potential Framework users may ther…[E145]
Preliminare, solo dal bando
Cosa dice il bando pubblicato. Non è una raccomandazione. I documenti di gara possono aggiungere o cambiare requisiti.
Altri 10 requisiti, i possibili ostacoli e le domande aperte sono nel tuo profilo gratuito.
Crea un profilo gratuitoAmmissibilità e requisiti
I dettagli del bando sono mostrati come li ha pubblicati la fonte. I fatti e i requisiti che estraiamo sono scritti in inglese.
- CondizioneThe legal basis is UKPGA 2023/54 (Procurement Act 2023).[E207]
- CondizioneLot 31 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E220]
- CondizioneLot 49 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E222]
- CondizioneLot 1 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E289]
- CondizioneLot 1 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E290]
- CondizioneLot 2 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E293]
- CondizioneLot 2 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E294]
- CondizioneLot 3 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E297]
- CondizioneLot 3 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E298]
- CondizioneLot 4 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E301]
- CondizioneLot 4 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E302]
- CondizioneLot 5 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E305]
- CondizioneLot 5 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E306]
- CondizioneLot 6 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E309]
- CondizioneLot 6 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E310]
- CondizioneLot 7 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E313]
- CondizioneLot 7 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E314]
- CondizioneLot 8 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E317]
- CondizioneLot 8 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E318]
- CondizioneLot 9 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E321]
- CondizioneLot 9 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E322]
- CondizioneLot 10 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E286]
- CondizioneLot 10 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E285]
- CondizioneLot 11 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E284]
- CondizioneLot 11 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E283]
- CondizioneLot 12 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E282]
- CondizioneLot 12 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E281]
- CondizioneLot 13 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E280]
- CondizioneLot 13 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E279]
- CondizioneLot 14 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E332]
- CondizioneLot 14 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E208]
- CondizioneLot 15 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E271]
- CondizioneLot 15 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E272]
- CondizioneLot 16 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E239]
- CondizioneLot 16 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E240]
- CondizioneLot 17 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E311]
- CondizioneLot 17 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E312]
- CondizioneLot 18 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E223]
- CondizioneLot 18 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E224]
- CondizioneLot 19 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E255]
- CondizioneLot 19 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E256]
- CondizioneLot 20 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E295]
- CondizioneLot 20 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E296]
- CondizioneLot 21 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E325]
- CondizioneLot 21 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E326]
- CondizioneLot 22 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E215]
- CondizioneLot 22 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E216]
- CondizioneLot 23 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E231]
- CondizioneLot 23 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E232]
- CondizioneLot 24 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E247]
- CondizioneLot 24 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E248]
- CondizioneLot 25 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E263]
- CondizioneLot 25 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E264]
- CondizioneLot 26 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E287]
- CondizioneLot 26 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E288]
- CondizioneLot 27 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E303]
- CondizioneLot 27 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E304]
- CondizioneLot 28 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E319]
- CondizioneLot 28 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E320]
- CondizioneLot 29 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E329]
- CondizioneLot 29 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E330]
- CondizioneLot 30 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E211]
- CondizioneLot 30 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E212]
- CondizioneLot 31 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E219]
- CondizioneLot 32 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E227]
- CondizioneLot 32 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E228]
- CondizioneLot 33 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E235]
- CondizioneLot 33 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E236]
- CondizioneLot 34 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E243]
- CondizioneLot 34 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E244]
- CondizioneLot 35 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E251]
- CondizioneLot 35 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E252]
- CondizioneLot 36 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E259]
- CondizioneLot 36 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E260]
- CondizioneLot 37 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E267]
- CondizioneLot 37 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E268]
- CondizioneLot 38 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E275]
- CondizioneLot 38 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E276]
- CondizioneLot 39 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E291]
- CondizioneLot 39 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E292]
- CondizioneLot 40 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E299]
- CondizioneLot 40 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E300]
- CondizioneLot 41 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E307]
- CondizioneLot 41 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E308]
- CondizioneLot 42 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E315]
- CondizioneLot 42 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E316]
- CondizioneLot 43 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E323]
- CondizioneLot 43 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E324]
- CondizioneLot 44 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E327]
- CondizioneLot 44 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E328]
- CondizioneLot 45 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E331]
- CondizioneLot 45 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E333]
- CondizioneLot 46 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E209]
- CondizioneLot 46 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E210]
- CondizioneLot 47 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E213]
- CondizioneLot 47 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E214]
- CondizioneLot 48 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E217]
- CondizioneLot 48 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E218]
- CondizioneLot 49 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E221]
- CondizioneLot 50 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E225]
- CondizioneLot 50 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E226]
- CondizioneLot 51 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E229]
- CondizioneLot 51 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E230]
- CondizioneLot 52 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E233]
- CondizioneLot 52 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E234]
- CondizioneLot 53 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E237]
- CondizioneLot 53 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E238]
- CondizioneLot 54 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E241]
- CondizioneLot 54 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E242]
- CondizioneLot 55 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E245]
- CondizioneLot 55 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E246]
- CondizioneLot 56 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E249]
- CondizioneLot 56 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E250]
- CondizioneLot 57 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E253]
- CondizioneLot 57 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E254]
- CondizioneLot 58 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E257]
- CondizioneLot 58 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E258]
- CondizioneLot 59 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E261]
- CondizioneLot 59 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E262]
- CondizioneLot 60 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E265]
- CondizioneLot 60 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E266]
- CondizioneLot 61 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E269]
- CondizioneLot 61 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E270]
- CondizioneLot 62 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E273]
- CondizioneLot 62 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E274]
- CondizioneLot 63 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).[E277]
- CondizioneLot 63 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).[E278]
- CondizioneThe buyer marks lot 17 as suitable for small and medium-sized businesses.[E339]
- CondizioneThe buyer marks lot 48 as suitable for small and medium-sized businesses.[E401]
- CondizioneThe buyer marks lot 48 as suitable for voluntary, community and social enterprises.[E402]
- CondizioneThe buyer marks lot 16 as suitable for small and medium-sized businesses.[E337]
- CondizioneThe buyer marks lot 15 as suitable for voluntary, community and social enterprises.[E336]
- CondizioneThe buyer marks lot 49 as suitable for small and medium-sized businesses.[E403]
- CondizioneThe buyer marks lot 49 as suitable for voluntary, community and social enterprises.[E404]
- CondizioneThe buyer marks lot 15 as suitable for small and medium-sized businesses.[E335]
- CondizioneThe buyer marks lot 1 as suitable for small and medium-sized businesses.[E433]
- CondizioneThe buyer marks lot 50 as suitable for small and medium-sized businesses.[E405]
- CondizioneThe buyer marks lot 50 as suitable for voluntary, community and social enterprises.[E406]
- CondizioneThe buyer marks lot 14 as suitable for voluntary, community and social enterprises.[E459]
- CondizioneThe buyer marks lot 14 as suitable for small and medium-sized businesses.[E334]
- CondizioneThe buyer marks lot 51 as suitable for small and medium-sized businesses.[E407]
- CondizioneThe buyer marks lot 51 as suitable for voluntary, community and social enterprises.[E408]
- CondizioneThe buyer marks lot 13 as suitable for voluntary, community and social enterprises.[E458]
- CondizioneThe buyer marks lot 13 as suitable for small and medium-sized businesses.[E457]
- CondizioneThe buyer marks lot 52 as suitable for small and medium-sized businesses.[E409]
- CondizioneThe buyer marks lot 52 as suitable for voluntary, community and social enterprises.[E410]
- CondizioneThe buyer marks lot 12 as suitable for voluntary, community and social enterprises.[E456]
- CondizioneThe buyer marks lot 12 as suitable for small and medium-sized businesses.[E455]
- CondizioneThe buyer marks lot 53 as suitable for small and medium-sized businesses.[E411]
- CondizioneThe buyer marks lot 53 as suitable for voluntary, community and social enterprises.[E412]
- CondizioneThe buyer marks lot 11 as suitable for voluntary, community and social enterprises.[E454]
- CondizioneThe buyer marks lot 11 as suitable for small and medium-sized businesses.[E453]
- CondizioneThe buyer marks lot 54 as suitable for small and medium-sized businesses.[E413]
- CondizioneThe buyer marks lot 54 as suitable for voluntary, community and social enterprises.[E414]
- CondizioneThe buyer marks lot 10 as suitable for voluntary, community and social enterprises.[E452]
- CondizioneThe buyer marks lot 10 as suitable for small and medium-sized businesses.[E451]
- CondizioneThe buyer marks lot 55 as suitable for small and medium-sized businesses.[E415]
- CondizioneThe buyer marks lot 55 as suitable for voluntary, community and social enterprises.[E416]
- CondizioneThe buyer marks lot 9 as suitable for voluntary, community and social enterprises.[E450]
- CondizioneThe buyer marks lot 9 as suitable for small and medium-sized businesses.[E449]
- CondizioneThe buyer marks lot 56 as suitable for small and medium-sized businesses.[E417]
- CondizioneThe buyer marks lot 56 as suitable for voluntary, community and social enterprises.[E418]
- CondizioneThe buyer marks lot 8 as suitable for voluntary, community and social enterprises.[E448]
- CondizioneThe buyer marks lot 8 as suitable for small and medium-sized businesses.[E447]
- CondizioneThe buyer marks lot 57 as suitable for voluntary, community and social enterprises.[E420]
- CondizioneThe buyer marks lot 7 as suitable for voluntary, community and social enterprises.[E446]
- CondizioneThe buyer marks lot 7 as suitable for small and medium-sized businesses.[E445]
- CondizioneThe buyer marks lot 58 as suitable for small and medium-sized businesses.[E421]
- CondizioneThe buyer marks lot 58 as suitable for voluntary, community and social enterprises.[E422]
- CondizioneThe buyer marks lot 6 as suitable for voluntary, community and social enterprises.[E444]
- CondizioneThe buyer marks lot 6 as suitable for small and medium-sized businesses.[E443]
- CondizioneThe buyer marks lot 59 as suitable for small and medium-sized businesses.[E423]
- CondizioneThe buyer marks lot 59 as suitable for voluntary, community and social enterprises.[E424]
- CondizioneThe buyer marks lot 5 as suitable for voluntary, community and social enterprises.[E442]
- CondizioneThe buyer marks lot 5 as suitable for small and medium-sized businesses.[E441]
- CondizioneThe buyer marks lot 60 as suitable for small and medium-sized businesses.[E425]
- CondizioneThe buyer marks lot 60 as suitable for voluntary, community and social enterprises.[E426]
- CondizioneThe buyer marks lot 16 as suitable for voluntary, community and social enterprises.[E338]
- CondizioneThe buyer marks lot 4 as suitable for voluntary, community and social enterprises.[E440]
- CondizioneThe buyer marks lot 61 as suitable for small and medium-sized businesses.[E427]
- CondizioneThe buyer marks lot 61 as suitable for voluntary, community and social enterprises.[E428]
- CondizioneThe buyer marks lot 4 as suitable for small and medium-sized businesses.[E439]
- CondizioneThe buyer marks lot 3 as suitable for voluntary, community and social enterprises.[E438]
- CondizioneThe buyer marks lot 62 as suitable for small and medium-sized businesses.[E429]
- CondizioneThe buyer marks lot 62 as suitable for voluntary, community and social enterprises.[E430]
- CondizioneThe buyer marks lot 3 as suitable for small and medium-sized businesses.[E437]
- CondizioneThe buyer marks lot 2 as suitable for voluntary, community and social enterprises.[E436]
- CondizioneThe buyer marks lot 63 as suitable for small and medium-sized businesses.[E431]
- CondizioneThe buyer marks lot 63 as suitable for voluntary, community and social enterprises.[E432]
- CondizioneThe buyer marks lot 2 as suitable for small and medium-sized businesses.[E435]
- CondizioneThe buyer marks lot 32 as suitable for voluntary, community and social enterprises.[E370]
- CondizioneThe buyer marks lot 1 as suitable for voluntary, community and social enterprises.[E434]
- CondizioneThe buyer marks lot 32 as suitable for small and medium-sized businesses.[E369]
- CondizioneThe buyer marks lot 33 as suitable for small and medium-sized businesses.[E371]
- CondizioneThe buyer marks lot 33 as suitable for voluntary, community and social enterprises.[E372]
- CondizioneThe buyer marks lot 31 as suitable for voluntary, community and social enterprises.[E368]
- CondizioneThe buyer marks lot 57 as suitable for small and medium-sized businesses.[E419]
- CondizioneThe buyer marks lot 31 as suitable for small and medium-sized businesses.[E367]
- CondizioneThe buyer marks lot 34 as suitable for small and medium-sized businesses.[E373]
- CondizioneThe buyer marks lot 34 as suitable for voluntary, community and social enterprises.[E374]
- CondizioneThe buyer marks lot 30 as suitable for voluntary, community and social enterprises.[E366]
- CondizioneThe buyer marks lot 30 as suitable for small and medium-sized businesses.[E365]
- CondizioneThe buyer marks lot 35 as suitable for small and medium-sized businesses.[E375]
- CondizioneThe buyer marks lot 35 as suitable for voluntary, community and social enterprises.[E376]
- CondizioneThe buyer marks lot 29 as suitable for voluntary, community and social enterprises.[E364]
- CondizioneThe buyer marks lot 29 as suitable for small and medium-sized businesses.[E363]
- CondizioneThe buyer marks lot 36 as suitable for small and medium-sized businesses.[E377]
- CondizioneThe buyer marks lot 36 as suitable for voluntary, community and social enterprises.[E378]
- CondizioneThe buyer marks lot 28 as suitable for voluntary, community and social enterprises.[E362]
- CondizioneThe buyer marks lot 28 as suitable for small and medium-sized businesses.[E361]
- CondizioneThe buyer marks lot 37 as suitable for small and medium-sized businesses.[E379]
- CondizioneThe buyer marks lot 37 as suitable for voluntary, community and social enterprises.[E380]
- CondizioneThe buyer marks lot 27 as suitable for voluntary, community and social enterprises.[E360]
- CondizioneThe buyer marks lot 27 as suitable for small and medium-sized businesses.[E359]
- CondizioneThe buyer marks lot 38 as suitable for small and medium-sized businesses.[E381]
- CondizioneThe buyer marks lot 38 as suitable for voluntary, community and social enterprises.[E382]
- CondizioneThe buyer marks lot 26 as suitable for voluntary, community and social enterprises.[E358]
- CondizioneThe buyer marks lot 26 as suitable for small and medium-sized businesses.[E357]
- CondizioneThe buyer marks lot 39 as suitable for small and medium-sized businesses.[E383]
- CondizioneThe buyer marks lot 39 as suitable for voluntary, community and social enterprises.[E384]
- CondizioneThe buyer marks lot 45 as suitable for voluntary, community and social enterprises.[E396]
- CondizioneThe buyer marks lot 25 as suitable for voluntary, community and social enterprises.[E356]
- CondizioneThe buyer marks lot 25 as suitable for small and medium-sized businesses.[E355]
- CondizioneThe buyer marks lot 40 as suitable for small and medium-sized businesses.[E385]
- CondizioneThe buyer marks lot 40 as suitable for voluntary, community and social enterprises.[E386]
- CondizioneThe buyer marks lot 24 as suitable for voluntary, community and social enterprises.[E354]
- CondizioneThe buyer marks lot 24 as suitable for small and medium-sized businesses.[E353]
- CondizioneThe buyer marks lot 41 as suitable for small and medium-sized businesses.[E387]
- CondizioneThe buyer marks lot 41 as suitable for voluntary, community and social enterprises.[E388]
- CondizioneThe buyer marks lot 23 as suitable for voluntary, community and social enterprises.[E352]
- CondizioneThe buyer marks lot 23 as suitable for small and medium-sized businesses.[E351]
- CondizioneThe buyer marks lot 42 as suitable for small and medium-sized businesses.[E389]
- CondizioneThe buyer marks lot 42 as suitable for voluntary, community and social enterprises.[E390]
- CondizioneThe buyer marks lot 22 as suitable for voluntary, community and social enterprises.[E350]
- CondizioneThe buyer marks lot 22 as suitable for small and medium-sized businesses.[E349]
- CondizioneThe buyer marks lot 43 as suitable for small and medium-sized businesses.[E391]
- CondizioneThe buyer marks lot 43 as suitable for voluntary, community and social enterprises.[E392]
- CondizioneThe buyer marks lot 21 as suitable for voluntary, community and social enterprises.[E348]
- CondizioneThe buyer marks lot 21 as suitable for small and medium-sized businesses.[E347]
- CondizioneThe buyer marks lot 44 as suitable for small and medium-sized businesses.[E393]
- CondizioneThe buyer marks lot 44 as suitable for voluntary, community and social enterprises.[E394]
- CondizioneThe buyer marks lot 20 as suitable for voluntary, community and social enterprises.[E346]
- CondizioneThe buyer marks lot 20 as suitable for small and medium-sized businesses.[E345]
- CondizioneThe buyer marks lot 45 as suitable for small and medium-sized businesses.[E395]
- CondizioneThe buyer marks lot 19 as suitable for voluntary, community and social enterprises.[E344]
- CondizioneThe buyer marks lot 19 as suitable for small and medium-sized businesses.[E343]
- CondizioneThe buyer marks lot 46 as suitable for small and medium-sized businesses.[E397]
- CondizioneThe buyer marks lot 46 as suitable for voluntary, community and social enterprises.[E398]
- CondizioneThe buyer marks lot 18 as suitable for voluntary, community and social enterprises.[E342]
- CondizioneThe buyer marks lot 18 as suitable for small and medium-sized businesses.[E341]
- CondizioneThe buyer marks lot 47 as suitable for small and medium-sized businesses.[E399]
- CondizioneThe buyer marks lot 47 as suitable for voluntary, community and social enterprises.[E400]
- CondizioneThe buyer marks lot 17 as suitable for voluntary, community and social enterprises.[E340]
- DettaglioDelivery location: UKI, United Kingdom.[E204]
- DettaglioLot 59 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E1]
- DettaglioLot 63 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E2]
- DettaglioLot 62 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E3]
- DettaglioLot 61 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E4]
- DettaglioLot 60 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E5]
- DettaglioLot 1 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E6]
- DettaglioLot 2 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E7]
- DettaglioLot 3 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E8]
- DettaglioLot 4 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E9]
- DettaglioLot 5 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E10]
- DettaglioLot 6 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E11]
- DettaglioLot 7 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E12]
- DettaglioLot 8 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E13]
- DettaglioLot 9 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E14]
- DettaglioLot 10 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E15]
- DettaglioLot 11 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E16]
- DettaglioLot 12 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E17]
- DettaglioLot 13 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E18]
- DettaglioLot 14 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E19]
- DettaglioLot 15 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E20]
- DettaglioLot 16 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E21]
- DettaglioLot 17 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E22]
- DettaglioLot 18 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E23]
- DettaglioLot 19 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E24]
- DettaglioLot 20 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E25]
- DettaglioLot 21 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E26]
- DettaglioLot 22 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E27]
- DettaglioLot 23 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E28]
- DettaglioLot 24 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E29]
- DettaglioLot 25 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E30]
- DettaglioLot 26 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E31]
- DettaglioLot 27 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E32]
- DettaglioLot 28 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E33]
- DettaglioLot 29 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E34]
- DettaglioLot 30 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E35]
- DettaglioLot 31 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E36]
- DettaglioLot 32 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E37]
- DettaglioLot 33 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E38]
- DettaglioLot 34 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E39]
- DettaglioLot 35 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E40]
- DettaglioLot 36 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E41]
- DettaglioLot 37 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E42]
- DettaglioLot 38 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E43]
- DettaglioLot 39 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E44]
- DettaglioLot 40 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E45]
- DettaglioLot 41 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E46]
- DettaglioLot 42 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E47]
- DettaglioLot 43 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E48]
- DettaglioLot 44 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E49]
- DettaglioLot 45 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E50]
- DettaglioLot 46 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E51]
- DettaglioLot 47 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E52]
- DettaglioLot 48 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E53]
- DettaglioLot 49 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E54]
- DettaglioLot 50 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E55]
- DettaglioLot 51 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E56]
- DettaglioLot 52 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E57]
- DettaglioLot 53 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E58]
- DettaglioLot 54 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E59]
- DettaglioLot 55 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E60]
- DettaglioLot 56 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E61]
- DettaglioLot 57 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E62]
- DettaglioLot 58 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..[E63]
- DettaglioLot 27 runs from 31 Mar 2027 to 31 Mar 2031.[E80]
- DettaglioLot 44 runs from 31 Mar 2027 to 31 Mar 2031.[E81]
- DettaglioLot 28 runs from 31 Mar 2027 to 31 Mar 2031.[E82]
- DettaglioLot 60 runs from 31 Mar 2027 to 31 Mar 2031.[E83]
- DettaglioLot 50 runs from 31 Mar 2027 to 31 Mar 2031.[E84]
- DettaglioLot 40 runs from 31 Mar 2027 to 31 Mar 2031.[E85]
- DettaglioLot 20 runs from 31 Mar 2027 to 31 Mar 2031.[E86]
- DettaglioLot 58 runs from 31 Mar 2027 to 31 Mar 2031.[E87]
- DettaglioLot 21 runs from 31 Mar 2027 to 31 Mar 2031.[E88]
- DettaglioLot 41 runs from 31 Mar 2027 to 31 Mar 2031.[E89]
- DettaglioLot 22 runs from 31 Mar 2027 to 31 Mar 2031.[E90]
- DettaglioLot 51 runs from 31 Mar 2027 to 31 Mar 2031.[E91]
- DettaglioLot 23 runs from 31 Mar 2027 to 31 Mar 2031.[E92]
- DettaglioLot 42 runs from 31 Mar 2027 to 31 Mar 2031.[E93]
- DettaglioLot 24 runs from 31 Mar 2027 to 31 Mar 2031.[E94]
- DettaglioLot 56 runs from 31 Mar 2027 to 31 Mar 2031.[E95]
- DettaglioLot 25 runs from 31 Mar 2027 to 31 Mar 2031.[E96]
- DettaglioLot 43 runs from 31 Mar 2027 to 31 Mar 2031.[E97]
- DettaglioLot 26 runs from 31 Mar 2027 to 31 Mar 2031.[E98]
- DettaglioLot 52 runs from 31 Mar 2027 to 31 Mar 2031.[E99]
- DettaglioLot 39 runs from 31 Mar 2027 to 31 Mar 2031.[E100]
- DettaglioLot 18 runs from 31 Mar 2027 to 31 Mar 2031.[E101]
- DettaglioLot 19 runs from 31 Mar 2027 to 31 Mar 2031.[E102]
- DettaglioLot 29 runs from 31 Mar 2027 to 31 Mar 2031.[E103]
- DettaglioLot 63 runs from 31 Mar 2027 to 31 Mar 2031.[E104]
- DettaglioLot 45 runs from 31 Mar 2027 to 31 Mar 2031.[E105]
- DettaglioLot 62 runs from 31 Mar 2027 to 31 Mar 2031.[E106]
- DettaglioLot 30 runs from 31 Mar 2027 to 31 Mar 2031.[E107]
- DettaglioLot 61 runs from 31 Mar 2027 to 31 Mar 2031.[E108]
- DettaglioLot 53 runs from 31 Mar 2027 to 31 Mar 2031.[E109]
- DettaglioLot 1 runs from 31 Mar 2027 to 31 Mar 2031.[E110]
- DettaglioLot 31 runs from 31 Mar 2027 to 31 Mar 2031.[E111]
- DettaglioLot 2 runs from 31 Mar 2027 to 31 Mar 2031.[E112]
- DettaglioLot 46 runs from 31 Mar 2027 to 31 Mar 2031.[E113]
- DettaglioLot 3 runs from 31 Mar 2027 to 31 Mar 2031.[E114]
- DettaglioLot 32 runs from 31 Mar 2027 to 31 Mar 2031.[E115]
- DettaglioLot 4 runs from 31 Mar 2027 to 31 Mar 2031.[E116]
- DettaglioLot 57 runs from 31 Mar 2027 to 31 Mar 2031.[E117]
- DettaglioLot 5 runs from 31 Mar 2027 to 31 Mar 2031.[E118]
- DettaglioLot 33 runs from 31 Mar 2027 to 31 Mar 2031.[E119]
- DettaglioLot 6 runs from 31 Mar 2027 to 31 Mar 2031.[E120]
- DettaglioLot 47 runs from 31 Mar 2027 to 31 Mar 2031.[E121]
- DettaglioLot 7 runs from 31 Mar 2027 to 31 Mar 2031.[E122]
- DettaglioLot 34 runs from 31 Mar 2027 to 31 Mar 2031.[E123]
- DettaglioLot 8 runs from 31 Mar 2027 to 31 Mar 2031.[E124]
- DettaglioLot 54 runs from 31 Mar 2027 to 31 Mar 2031.[E125]
- DettaglioLot 9 runs from 31 Mar 2027 to 31 Mar 2031.[E126]
- DettaglioLot 35 runs from 31 Mar 2027 to 31 Mar 2031.[E127]
- DettaglioLot 10 runs from 31 Mar 2027 to 31 Mar 2031.[E128]
- DettaglioLot 48 runs from 31 Mar 2027 to 31 Mar 2031.[E129]
- DettaglioLot 11 runs from 31 Mar 2027 to 31 Mar 2031.[E130]
- DettaglioLot 36 runs from 31 Mar 2027 to 31 Mar 2031.[E131]
- DettaglioLot 12 runs from 31 Mar 2027 to 31 Mar 2031.[E132]
- DettaglioLot 59 runs from 31 Mar 2027 to 31 Mar 2031.[E133]
- DettaglioLot 13 runs from 31 Mar 2027 to 31 Mar 2031.[E134]
- DettaglioLot 37 runs from 31 Mar 2027 to 31 Mar 2031.[E135]
- DettaglioLot 14 runs from 31 Mar 2027 to 31 Mar 2031.[E136]
- DettaglioLot 49 runs from 31 Mar 2027 to 31 Mar 2031.[E137]
- DettaglioLot 15 runs from 31 Mar 2027 to 31 Mar 2031.[E138]
- DettaglioLot 38 runs from 31 Mar 2027 to 31 Mar 2031.[E139]
- DettaglioLot 16 runs from 31 Mar 2027 to 31 Mar 2031.[E140]
- DettaglioLot 55 runs from 31 Mar 2027 to 31 Mar 2031.[E141]
- DettaglioLot 17 runs from 31 Mar 2027 to 31 Mar 2031.[E142]
- DettaglioClarification questions close at 4 Dec 2026, 12:00 UTC.[E460]
- DettaglioThe notice explains how to submit a tender.[E465]
Documenti di gara
I documenti di gara sono sul portale della stazione appaltante, di solito dopo una registrazione gratuita. Non accediamo mai al posto tuo. Scaricali lì e aggiungili qui sotto, o incolla il loro indirizzo pubblico.
Cosa serve alla verifica
- Disciplinare di gara: mancante
- Capitolato tecnico: mancante
- Questionario di selezione: mancante
- Criteri di valutazione e aggiudicazione: mancante
Manca ancora: disciplinare di gara, capitolato tecnico, questionario di selezione, criteri di valutazione e aggiudicazione. Aggiungi solo questi.
Aggiungi tu i documenti
Aggiungi solo le parti mancanti dal portale della stazione appaltante: disciplinare di gara, capitolato tecnico, questionario di selezione, criteri di valutazione e aggiudicazione. Leggiamo ogni pagina e la confrontiamo con la tua azienda.
Accedi per caricare i documenti.
Oppure inoltrali via email
Accedi per ottenere un indirizzo di inoltro per questa gara.
- Solo per la tua organizzazioneSolo le persone della tua organizzazione vedono i file.
- Eliminati dopo 90 giorniO subito, quando li elimini.
- Mai usati per addestrare IAI file vengono letti solo per la tua verifica.
Hai già scritto le risposte?
Controlla la tua bozza rispetto alle domande, ai limiti e alle tue prove per questa gara prima di presentarla.
Rivedi la mia bozza · 199 £Vedi una revisione di esempioStazione appaltante
Cos'altro acquista questo enteWirral Council
- Documenti di gara
- find-tender.service.gov.uk/…
- Casella condivisa
- procurementcorporate@wirral.gov.uk
- Indirizzo
- Town Hall, Brighton Street, CH44 8ED, Wallasey
Come fare una domanda
Invii i chiarimenti tramite la procedura dell'ente, di solito la sua piattaforma di gara, entro il termine per i chiarimenti. Le risposte sono di norma condivise con tutti gli offerenti. Apri il canale dell'ente
Mostriamo solo il canale di contatto dell'organizzazione come pubblicato: sito web, piattaforma, caselle condivise e centralino. Mai una persona.
Evidenze467 fatti dal bando · MostraNascondi
Ogni dato di questa pagina proviene dal bando pubblicato. Ogni voce indica il documento e il campo da cui è stato letto.
- E1
Lot 59 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/58/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E2
Lot 63 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/62/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E3
Lot 62 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/61/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E4
Lot 61 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/60/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E5
Lot 60 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/59/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E6
Lot 1 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/0/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E7
Lot 2 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/1/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E8
Lot 3 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/2/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E9
Lot 4 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/3/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E10
Lot 5 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/4/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E11
Lot 6 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/5/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E12
Lot 7 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/6/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E13
Lot 8 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/7/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E14
Lot 9 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/8/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E15
Lot 10 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/9/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E16
Lot 11 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/10/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E17
Lot 12 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/11/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E18
Lot 13 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/12/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E19
Lot 14 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/13/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E20
Lot 15 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/14/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E21
Lot 16 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/15/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E22
Lot 17 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/16/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E23
Lot 18 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/17/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E24
Lot 19 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/18/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E25
Lot 20 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/19/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E26
Lot 21 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/20/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E27
Lot 22 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/21/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E28
Lot 23 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/22/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E29
Lot 24 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/23/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E30
Lot 25 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/24/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E31
Lot 26 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/25/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E32
Lot 27 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/26/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E33
Lot 28 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/27/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E34
Lot 29 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/28/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E35
Lot 30 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/29/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E36
Lot 31 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/30/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E37
Lot 32 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/31/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E38
Lot 33 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/32/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E39
Lot 34 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/33/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E40
Lot 35 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/34/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E41
Lot 36 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/35/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E42
Lot 37 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/36/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E43
Lot 38 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/37/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E44
Lot 39 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/38/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E45
Lot 40 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/39/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E46
Lot 41 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/40/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E47
Lot 42 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/41/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E48
Lot 43 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/42/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E49
Lot 44 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/43/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E50
Lot 45 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/44/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E51
Lot 46 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/45/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E52
Lot 47 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/46/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E53
Lot 48 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/47/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E54
Lot 49 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/48/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E55
Lot 50 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/49/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E56
Lot 51 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/50/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E57
Lot 52 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/51/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E58
Lot 53 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/52/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E59
Lot 54 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/53/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E60
Lot 55 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/54/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E61
Lot 56 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/55/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E62
Lot 57 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/56/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E63
Lot 58 is evaluated on: Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%) Performance Management (6%) Development Delivery Methodology / Joint Venture Governance and Long-term Partnership (12%) Commercial Price (30%) - split 7.5% Pre-Construction %, 7.5% Delivery % and 15% Developer's Profit % Technical (Quality) criteria are worth a maximum of 70% of the overall score; Commercial (Price) criteria are worth a maximum of 30%..
“Acceptance of Framework Terms and Conditions - Pass/Fail (not separately weighted) Framework Management (10%) Finance and Funding Capability (12%) Supply Chain Management (6%) Social Value (10%) Sustainability and Net Zero (6%) Stakeholder and Community Engagement (8%)…”
Documento 102591-2026, campo /tender/lots/57/awardCriteria/weightingDescription, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E64
The buyer is Wirral Council.
Documento 102591-2026, campo /buyer/name, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E65–E79
Classificato con CPV: Lavori generali di costruzione di edifici (45210000); Opere d'arte e strutture (45220000); Lavori di costruzione ferroviari e sistemi di trasporto a fune (45234000); Lavori di costruzione per aerodromi, piste e superfici di manovra di campi d'aviazione (45235000); Lavori di costruzione di porti (45241000); Lavori di costruzioni di impianti di svago a riva (45242000); Lavori di costruzione marina (45244000); Lavori di costruzione per dighe, canali, reti di irrigazione e acquedotti (45247000); Lavori di costruzione di impianti di trattamento delle acque fognarie, impianti di depurazione e impianti di incenerimento di rifiuti (45252000); Servizi immobiliari (70000000); Studi di fattibilità, servizi di consulenza, analisi (71241000); Preparazione di progetti e progettazioni, stima dei costi (71242000); Servizi di consulenza in ingegneria civile (71311000); Servizi di consulenza in ingegneria strutturale (71312000); Servizi di ideazione tecnica (71320000).
letto 29 ott 2026, 23:26 UTC
- E80
Lot 27 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/26/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E81
Lot 44 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/43/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E82
Lot 28 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/27/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E83
Lot 60 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/59/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E84
Lot 50 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/49/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E85
Lot 40 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/39/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E86
Lot 20 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/19/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E87
Lot 58 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/57/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E88
Lot 21 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/20/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E89
Lot 41 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/40/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E90
Lot 22 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/21/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E91
Lot 51 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/50/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E92
Lot 23 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/22/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E93
Lot 42 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/41/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E94
Lot 24 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/23/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E95
Lot 56 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/55/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E96
Lot 25 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/24/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E97
Lot 43 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/42/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E98
Lot 26 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/25/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E99
Lot 52 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/51/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E100
Lot 39 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/38/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E101
Lot 18 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/17/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E102
Lot 19 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/18/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E103
Lot 29 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/28/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E104
Lot 63 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/62/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E105
Lot 45 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/44/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E106
Lot 62 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/61/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E107
Lot 30 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/29/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E108
Lot 61 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/60/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E109
Lot 53 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/52/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E110
Lot 1 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/0/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E111
Lot 31 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/30/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E112
Lot 2 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/1/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E113
Lot 46 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/45/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E114
Lot 3 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/2/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E115
Lot 32 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/31/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E116
Lot 4 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/3/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E117
Lot 57 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/56/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E118
Lot 5 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/4/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E119
Lot 33 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/32/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E120
Lot 6 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/5/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E121
Lot 47 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/46/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E122
Lot 7 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/6/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E123
Lot 34 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/33/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E124
Lot 8 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/7/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E125
Lot 54 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/53/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E126
Lot 9 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/8/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E127
Lot 35 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/34/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E128
Lot 10 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/9/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E129
Lot 48 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/47/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E130
Lot 11 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/10/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E131
Lot 36 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/35/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E132
Lot 12 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/11/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E133
Lot 59 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/58/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E134
Lot 13 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/12/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E135
Lot 37 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/36/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E136
Lot 14 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/13/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E137
Lot 49 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/48/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E138
Lot 15 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/14/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E139
Lot 38 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/37/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E140
Lot 16 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/15/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E141
Lot 55 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/54/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E142
Lot 17 runs from 31 Mar 2027 to 31 Mar 2031.
“2027-04-01T00:00:00+01:00 to 2031-03-31T23:59:59+01:00”
Documento 102591-2026, campo /tender/lots/16/contractPeriod, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E143
The buyer's address is in United Kingdom.
Documento 102591-2026, campo /parties/0/address/country, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E144
Tenders must be submitted by 8 Jan 2027, 12:00 UTC.
“2027-01-08T12:00:00Z”
Documento 102591-2026, campo /tender/tenderPeriod/endDate, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E145
The buyer describes the requirement in the notice.
“Wirral Council (the "Council"), as the Contracting Authority, in partnership with Procure Partnerships Framework intends to let a National Developer Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for…”
Documento 102591-2026, campo /tender/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E146
Delivery location: UKK, United Kingdom.
Documento 102591-2026, campo /tender/items/62/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E147
Delivery location: UKC, United Kingdom.
Documento 102591-2026, campo /tender/items/0/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E148
Delivery location: UKC, United Kingdom.
Documento 102591-2026, campo /tender/items/1/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E149
Delivery location: UKC, United Kingdom.
Documento 102591-2026, campo /tender/items/2/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E150
Delivery location: UKC, United Kingdom.
Documento 102591-2026, campo /tender/items/3/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E151
Delivery location: UKE, United Kingdom.
Documento 102591-2026, campo /tender/items/4/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E152
Delivery location: UKE, United Kingdom.
Documento 102591-2026, campo /tender/items/5/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E153
Delivery location: UKE, United Kingdom.
Documento 102591-2026, campo /tender/items/6/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E154
Delivery location: UKE, United Kingdom.
Documento 102591-2026, campo /tender/items/7/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E155
Delivery location: UKD, United Kingdom.
Documento 102591-2026, campo /tender/items/8/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E156
Delivery location: UKD, United Kingdom.
Documento 102591-2026, campo /tender/items/10/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E157
Delivery location: UKD, United Kingdom.
Documento 102591-2026, campo /tender/items/11/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E158
Delivery location: UKG, United Kingdom.
Documento 102591-2026, campo /tender/items/12/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E159
Delivery location: UKG, United Kingdom.
Documento 102591-2026, campo /tender/items/13/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E160
Delivery location: UKG, United Kingdom.
Documento 102591-2026, campo /tender/items/14/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E161
Delivery location: UKG, United Kingdom.
Documento 102591-2026, campo /tender/items/15/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E162
Delivery location: UKF, United Kingdom.
Documento 102591-2026, campo /tender/items/16/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E163
Delivery location: UKF, United Kingdom.
Documento 102591-2026, campo /tender/items/17/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E164
Delivery location: UKF, United Kingdom.
Documento 102591-2026, campo /tender/items/18/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E165
Delivery location: UKF, United Kingdom.
Documento 102591-2026, campo /tender/items/19/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E166
Delivery location: UKH, United Kingdom.
Documento 102591-2026, campo /tender/items/20/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E167
Delivery location: UKH, United Kingdom.
Documento 102591-2026, campo /tender/items/21/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E168
Delivery location: UKH, United Kingdom.
Documento 102591-2026, campo /tender/items/22/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E169
Delivery location: UKH, United Kingdom.
Documento 102591-2026, campo /tender/items/23/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E170
Delivery location: UKJ, United Kingdom.
Documento 102591-2026, campo /tender/items/24/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E171
Delivery location: UKJ, United Kingdom.
Documento 102591-2026, campo /tender/items/25/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E172
Delivery location: UKJ, United Kingdom.
Documento 102591-2026, campo /tender/items/26/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E173
Delivery location: UKJ, United Kingdom.
Documento 102591-2026, campo /tender/items/27/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E174
Delivery location: UKI, United Kingdom.
Documento 102591-2026, campo /tender/items/28/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E175
Delivery location: UKI, United Kingdom.
Documento 102591-2026, campo /tender/items/29/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E176
Delivery location: UKI, United Kingdom.
Documento 102591-2026, campo /tender/items/30/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E177
Delivery location: UKI, United Kingdom.
Documento 102591-2026, campo /tender/items/31/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E178
Delivery location: UKK, United Kingdom.
Documento 102591-2026, campo /tender/items/32/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E179
Delivery location: UKK, United Kingdom.
Documento 102591-2026, campo /tender/items/33/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E180
Delivery location: UKK, United Kingdom.
Documento 102591-2026, campo /tender/items/34/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E181
Delivery location: UKC, United Kingdom.
Documento 102591-2026, campo /tender/items/36/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E182
Delivery location: UKC, United Kingdom.
Documento 102591-2026, campo /tender/items/37/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E183
Delivery location: UKC, United Kingdom.
Documento 102591-2026, campo /tender/items/38/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E184
Delivery location: UKE, United Kingdom.
Documento 102591-2026, campo /tender/items/39/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E185
Delivery location: UKE, United Kingdom.
Documento 102591-2026, campo /tender/items/40/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E186
Delivery location: UKE, United Kingdom.
Documento 102591-2026, campo /tender/items/41/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E187
Delivery location: UKD, United Kingdom.
Documento 102591-2026, campo /tender/items/42/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E188
Delivery location: UKD, United Kingdom.
Documento 102591-2026, campo /tender/items/43/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E189
Delivery location: UKD, United Kingdom.
Documento 102591-2026, campo /tender/items/44/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E190
Delivery location: UKG, United Kingdom.
Documento 102591-2026, campo /tender/items/45/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E191
Delivery location: UKG, United Kingdom.
Documento 102591-2026, campo /tender/items/46/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E192
Delivery location: UKG, United Kingdom.
Documento 102591-2026, campo /tender/items/47/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E193
Delivery location: UKF, United Kingdom.
Documento 102591-2026, campo /tender/items/48/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E194
Delivery location: UKF, United Kingdom.
Documento 102591-2026, campo /tender/items/49/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E195
Delivery location: UKF, United Kingdom.
Documento 102591-2026, campo /tender/items/50/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E196
Delivery location: UKH, United Kingdom.
Documento 102591-2026, campo /tender/items/51/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E197
Delivery location: UKH, United Kingdom.
Documento 102591-2026, campo /tender/items/52/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E198
Delivery location: UKH, United Kingdom.
Documento 102591-2026, campo /tender/items/53/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E199
Delivery location: UKJ, United Kingdom.
Documento 102591-2026, campo /tender/items/54/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E200
Delivery location: UKJ, United Kingdom.
Documento 102591-2026, campo /tender/items/55/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E201
Delivery location: UKJ, United Kingdom.
Documento 102591-2026, campo /tender/items/56/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E202
Delivery location: UKI, United Kingdom.
Documento 102591-2026, campo /tender/items/57/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E203
Delivery location: UKI, United Kingdom.
Documento 102591-2026, campo /tender/items/58/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E204
Delivery location: UKI, United Kingdom.
Documento 102591-2026, campo /tender/items/59/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E205
Delivery location: UKK, United Kingdom.
Documento 102591-2026, campo /tender/items/60/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E206
Delivery location: UKK, United Kingdom.
Documento 102591-2026, campo /tender/items/61/deliveryAddresses/0, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E207
The legal basis is UKPGA 2023/54 (Procurement Act 2023).
Documento 102591-2026, campo /tender/legalBasis/id, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E208
Lot 14 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/13/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E209
Lot 46 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/45/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E210
Lot 46 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/45/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E211
Lot 30 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/29/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E212
Lot 30 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/29/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E213
Lot 47 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/46/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E214
Lot 47 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/46/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E215
Lot 22 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/21/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E216
Lot 22 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/21/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E217
Lot 48 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/47/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E218
Lot 48 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/47/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E219
Lot 31 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/30/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E220
Lot 31 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/30/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E221
Lot 49 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/48/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E222
Lot 49 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/48/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E223
Lot 18 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/17/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E224
Lot 18 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/17/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E225
Lot 50 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/49/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E226
Lot 50 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/49/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E227
Lot 32 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/31/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E228
Lot 32 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/31/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E229
Lot 51 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/50/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E230
Lot 51 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/50/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E231
Lot 23 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/22/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E232
Lot 23 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/22/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E233
Lot 52 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/51/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E234
Lot 52 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/51/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E235
Lot 33 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/32/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E236
Lot 33 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/32/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E237
Lot 53 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/52/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E238
Lot 53 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/52/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E239
Lot 16 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/15/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E240
Lot 16 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/15/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E241
Lot 54 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/53/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E242
Lot 54 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/53/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E243
Lot 34 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/33/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E244
Lot 34 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/33/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E245
Lot 55 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/54/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E246
Lot 55 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/54/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E247
Lot 24 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/23/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E248
Lot 24 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/23/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E249
Lot 56 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/55/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E250
Lot 56 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/55/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E251
Lot 35 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/34/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E252
Lot 35 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/34/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E253
Lot 57 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/56/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E254
Lot 57 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/56/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E255
Lot 19 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/18/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E256
Lot 19 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/18/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E257
Lot 58 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/57/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E258
Lot 58 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/57/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E259
Lot 36 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/35/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E260
Lot 36 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/35/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E261
Lot 59 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/58/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E262
Lot 59 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/58/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E263
Lot 25 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/24/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E264
Lot 25 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/24/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E265
Lot 60 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/59/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E266
Lot 60 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/59/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E267
Lot 37 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/36/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E268
Lot 37 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/36/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E269
Lot 61 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/60/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E270
Lot 61 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/60/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E271
Lot 15 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/14/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E272
Lot 15 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/14/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E273
Lot 62 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/61/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E274
Lot 62 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/61/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E275
Lot 38 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/37/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E276
Lot 38 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/37/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E277
Lot 63 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/62/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E278
Lot 63 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/62/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E279
Lot 13 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/12/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E280
Lot 13 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/12/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E281
Lot 12 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/11/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E282
Lot 12 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/11/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E283
Lot 11 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/10/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E284
Lot 11 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/10/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E285
Lot 10 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/9/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E286
Lot 10 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/9/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E287
Lot 26 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/25/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E288
Lot 26 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/25/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E289
Lot 1 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/0/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E290
Lot 1 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/0/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E291
Lot 39 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/38/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E292
Lot 39 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/38/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E293
Lot 2 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/1/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E294
Lot 2 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/1/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E295
Lot 20 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/19/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E296
Lot 20 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/19/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E297
Lot 3 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/2/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E298
Lot 3 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/2/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E299
Lot 40 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/39/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E300
Lot 40 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/39/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E301
Lot 4 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/3/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E302
Lot 4 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/3/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E303
Lot 27 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/26/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E304
Lot 27 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/26/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E305
Lot 5 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/4/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E306
Lot 5 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/4/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E307
Lot 41 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/40/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E308
Lot 41 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/40/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E309
Lot 6 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/5/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E310
Lot 6 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/5/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E311
Lot 17 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/16/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E312
Lot 17 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/16/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E313
Lot 7 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/6/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E314
Lot 7 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/6/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E315
Lot 42 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/41/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E316
Lot 42 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/41/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E317
Lot 8 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/7/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E318
Lot 8 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/7/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E319
Lot 28 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/27/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E320
Lot 28 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/27/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E321
Lot 9 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/8/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E322
Lot 9 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/8/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E323
Lot 43 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/42/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E324
Lot 43 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/42/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E325
Lot 21 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/20/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E326
Lot 21 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/20/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E327
Lot 44 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/43/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E328
Lot 44 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/43/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E329
Lot 29 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/28/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E330
Lot 29 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/28/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E331
Lot 45 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/44/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E332
Lot 14 economic criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire and Appendix 5 - Financial Standing Assessment).
Documento 102591-2026, campo /tender/lots/13/selectionCriteria/criteria/0/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E333
Lot 45 technical criterion: Applies to all Lots (Lots 1-63). Please refer to procurement documentation (Appendix 4 - Procurement Specific Questionnaire).
Documento 102591-2026, campo /tender/lots/44/selectionCriteria/criteria/1/description, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E334
The buyer marks lot 14 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/13/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E335
The buyer marks lot 15 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/14/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E336
The buyer marks lot 15 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/14/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E337
The buyer marks lot 16 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/15/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E338
The buyer marks lot 16 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/15/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E339
The buyer marks lot 17 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/16/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E340
The buyer marks lot 17 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/16/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E341
The buyer marks lot 18 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/17/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E342
The buyer marks lot 18 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/17/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E343
The buyer marks lot 19 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/18/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E344
The buyer marks lot 19 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/18/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E345
The buyer marks lot 20 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/19/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E346
The buyer marks lot 20 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/19/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E347
The buyer marks lot 21 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/20/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E348
The buyer marks lot 21 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/20/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E349
The buyer marks lot 22 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/21/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E350
The buyer marks lot 22 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/21/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E351
The buyer marks lot 23 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/22/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E352
The buyer marks lot 23 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/22/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E353
The buyer marks lot 24 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/23/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E354
The buyer marks lot 24 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/23/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E355
The buyer marks lot 25 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/24/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E356
The buyer marks lot 25 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/24/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E357
The buyer marks lot 26 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/25/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E358
The buyer marks lot 26 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/25/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E359
The buyer marks lot 27 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/26/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E360
The buyer marks lot 27 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/26/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E361
The buyer marks lot 28 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/27/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E362
The buyer marks lot 28 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/27/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E363
The buyer marks lot 29 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/28/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E364
The buyer marks lot 29 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/28/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E365
The buyer marks lot 30 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/29/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E366
The buyer marks lot 30 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/29/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E367
The buyer marks lot 31 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/30/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E368
The buyer marks lot 31 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/30/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E369
The buyer marks lot 32 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/31/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E370
The buyer marks lot 32 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/31/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E371
The buyer marks lot 33 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/32/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E372
The buyer marks lot 33 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/32/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E373
The buyer marks lot 34 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/33/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E374
The buyer marks lot 34 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/33/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E375
The buyer marks lot 35 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/34/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E376
The buyer marks lot 35 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/34/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E377
The buyer marks lot 36 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/35/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E378
The buyer marks lot 36 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/35/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E379
The buyer marks lot 37 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/36/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E380
The buyer marks lot 37 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/36/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E381
The buyer marks lot 38 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/37/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E382
The buyer marks lot 38 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/37/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E383
The buyer marks lot 39 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/38/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E384
The buyer marks lot 39 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/38/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E385
The buyer marks lot 40 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/39/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E386
The buyer marks lot 40 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/39/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E387
The buyer marks lot 41 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/40/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E388
The buyer marks lot 41 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/40/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E389
The buyer marks lot 42 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/41/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E390
The buyer marks lot 42 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/41/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E391
The buyer marks lot 43 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/42/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E392
The buyer marks lot 43 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/42/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E393
The buyer marks lot 44 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/43/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E394
The buyer marks lot 44 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/43/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E395
The buyer marks lot 45 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/44/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E396
The buyer marks lot 45 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/44/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E397
The buyer marks lot 46 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/45/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E398
The buyer marks lot 46 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/45/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E399
The buyer marks lot 47 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/46/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E400
The buyer marks lot 47 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/46/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E401
The buyer marks lot 48 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/47/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E402
The buyer marks lot 48 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/47/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E403
The buyer marks lot 49 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/48/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E404
The buyer marks lot 49 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/48/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E405
The buyer marks lot 50 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/49/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E406
The buyer marks lot 50 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/49/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E407
The buyer marks lot 51 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/50/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E408
The buyer marks lot 51 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/50/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E409
The buyer marks lot 52 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/51/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E410
The buyer marks lot 52 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/51/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E411
The buyer marks lot 53 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/52/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E412
The buyer marks lot 53 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/52/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E413
The buyer marks lot 54 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/53/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E414
The buyer marks lot 54 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/53/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E415
The buyer marks lot 55 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/54/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E416
The buyer marks lot 55 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/54/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E417
The buyer marks lot 56 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/55/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E418
The buyer marks lot 56 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/55/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E419
The buyer marks lot 57 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/56/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E420
The buyer marks lot 57 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/56/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E421
The buyer marks lot 58 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/57/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E422
The buyer marks lot 58 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/57/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E423
The buyer marks lot 59 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/58/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E424
The buyer marks lot 59 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/58/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E425
The buyer marks lot 60 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/59/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E426
The buyer marks lot 60 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/59/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E427
The buyer marks lot 61 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/60/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E428
The buyer marks lot 61 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/60/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E429
The buyer marks lot 62 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/61/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E430
The buyer marks lot 62 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/61/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E431
The buyer marks lot 63 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/62/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E432
The buyer marks lot 63 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/62/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E433
The buyer marks lot 1 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/0/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E434
The buyer marks lot 1 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/0/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E435
The buyer marks lot 2 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/1/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E436
The buyer marks lot 2 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/1/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E437
The buyer marks lot 3 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/2/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E438
The buyer marks lot 3 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/2/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E439
The buyer marks lot 4 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/3/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E440
The buyer marks lot 4 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/3/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E441
The buyer marks lot 5 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/4/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E442
The buyer marks lot 5 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/4/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E443
The buyer marks lot 6 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/5/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E444
The buyer marks lot 6 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/5/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E445
The buyer marks lot 7 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/6/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E446
The buyer marks lot 7 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/6/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E447
The buyer marks lot 8 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/7/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E448
The buyer marks lot 8 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/7/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E449
The buyer marks lot 9 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/8/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E450
The buyer marks lot 9 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/8/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E451
The buyer marks lot 10 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/9/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E452
The buyer marks lot 10 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/9/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E453
The buyer marks lot 11 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/10/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E454
The buyer marks lot 11 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/10/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E455
The buyer marks lot 12 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/11/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E456
The buyer marks lot 12 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/11/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E457
The buyer marks lot 13 as suitable for small and medium-sized businesses.
“sme: true”
Documento 102591-2026, campo /tender/lots/12/suitability/sme, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E458
The buyer marks lot 13 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/12/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E459
The buyer marks lot 14 as suitable for voluntary, community and social enterprises.
“vcse: true”
Documento 102591-2026, campo /tender/lots/13/suitability/vcse, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E460
Clarification questions close at 4 Dec 2026, 12:00 UTC.
“2026-12-04T12:00:00Z”
Documento 102591-2026, campo /tender/enquiryPeriod/endDate, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E461
This is a call for competition. Suppliers can respond.
“tender”
Documento 102591-2026, campo /tag, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E462
The procedure is: Open procedure.
Documento 102591-2026, campo /tender/procurementMethodDetails, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E463
The notice was published on 29 Oct 2026.
“2026-10-29T12:39:43Z”
Documento 102591-2026, campo /tender/documents/1/datePublished, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E464
Find a Tender gives the tender status as active.
Documento 102591-2026, campo /tender/status, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E465
The notice explains how to submit a tender.
“The Council will be using the Chest Portal for this Procurement. To register on the Portal please use the link https://procontract.due-north.com and follow the instructions to register as a Supplier. If you are already registered on the Portal and wish to participate in this…”
Documento 102591-2026, campo /tender/submissionMethodDetails, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E466
The notice is titled "National Developer Framework".
Documento 102591-2026, campo /tender/title, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
- E467
The stated value is GBP 12,000,000,000 excluding VAT.
“12000000000 GBP”
Documento 102591-2026, campo /tender/value/amount, letto 29 ott 2026, 23:26 UTC · fonte (si apre in una nuova scheda)
Contains public sector information from Find a Tender, licensed under the Open Government Licence v3.0. Licenza dei dati: Open Government Licence v3.0 (si apre in una nuova scheda). I recapiti personali presenti nei bandi non vengono conservati né mostrati.
Aggiornamenti
Visto per la prima volta · 29 ott 2026, 23:26 UTC
The source published a call for competition with a future deadline.
Documento di origine 102591-2026