Advanced TSO control rooms to enhance grid observability, stability and resilience[E8]
UnknownEuropean Commission[E1]
- Clôture[E2]
- Date limite du financeur : 1 déc. 2027, 01:00 heure d’Europe centrale (UTC+1). UTC : 1 déc. 2027, 00:00 UTC.
- Financement total[E9]
- EUR 10 000 000
- Langue de l’offre
- Votre langue
- Votre adéquation
- Connectez-vous pour voir l’adéquation
En termes simples
- Ce qui est financé
- Rédaction d’un court résumé dans votre langue…
- Qui peut candidater
- EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.
- Guide et candidature
Le guide, le règlement et le formulaire de candidature sont sur la page du financeur. Lisez-les avant de candidater.
Risques et inconnues
- RisqueApplications open on 4 août 2027. The funder can change the details before then.[E6]
- RisqueThis is a grant, not a contract. Grants usually need a proposal against the funder's criteria, may need partners and often need co-funding.[E5]
- InconnuWe read the funder's listing, not the full guidance or application forms.
- Ouverture[E6]
- 4 août 2027
- Dernière vérification
- il y a 6 heures
À propos du financement · Extrait de l’avis
Call: ENERGY. Type of action: HORIZON Innovation Actions. Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, and efficiency of electricity transmission grids. Grid congestion is managed efficiently; Enhanced observability of grids and improved forecasting of supply, demand, grid capacity availability, and flexibility; Transmission system operators (TSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with other TSOs; Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the TSO control room design and operation. Scope: Projects are expected to address all the following items: Design and test innovative solutions, technologies and processes for advancing the way the TSO control rooms are designed and operated, increasing observability and entailing enhanced support for the operators, providing more automation and enhanced support for decision, faster response times and less room for error. The solutions are expected to incorporate both hardware and software aspects; Analyse and include, as far as possible, solutions for Wide Area Monitoring Systems (WAMS) to extend the real-time monitoring and control capabilities over large areas, while coping with the decentralisation and increased complexity of the system; The novel solutions are expected to help the operators to manage better grid congestion and incorporate more renewables while reducing curtailment. The solutions will facil…[E3]
Qui peut candidater
- ConditionEU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.[E4]
Financeur
Ce que ce financeur propose d'autreEuropean Commission
L'appel ne donne pas d'autre moyen de contacter le financeur que la page d'origine.
Comment poser une question
Posez vos questions via la page ou le contact du financeur. Lisez d'abord le guide. Ouvrir le moyen de contact de l'acheteur
Nous n'affichons que les moyens de contact de l'organisation tels que publiés : site web, plateforme, boîtes partagées et standard. Jamais une personne.
Preuves9 faits tirés de l’avis · AfficherMasquer
Chaque fait de cette page vient de l'annonce du financeur. Chaque entrée indique l'enregistrement et le champ d'où il a été lu.
- E1
The funder is European Commission.
Source : Advanced TSO control rooms to enhance grid observability, stability and resilie… (ID HORIZON-CL5-2027-07-D3-25), champ /metadata/type/0, lu 28 oct. 2026, 21:22 UTC · source (s’ouvre dans un nouvel onglet)
- E2
Proposals must be submitted by 1 Dec 2027, 01:00 Central European time (UTC+1).
“2027-12-01T00:00:00.000+0000”
Source : Advanced TSO control rooms to enhance grid observability, stability and resilie… (ID HORIZON-CL5-2027-07-D3-25), champ /metadata/deadlineDate/0, lu 28 oct. 2026, 21:22 UTC · source (s’ouvre dans un nouvel onglet)
- E3
The buyer describes the requirement in the notice.
“Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, and efficiency of electricity transmission grids. Grid congestion is managed efficiently; Enhanced observability of grids and improved forecasti…”
Source : Advanced TSO control rooms to enhance grid observability, stability and resilie… (ID HORIZON-CL5-2027-07-D3-25), champ /metadata/descriptionByte/0, lu 28 oct. 2026, 21:22 UTC · source (s’ouvre dans un nouvel onglet)
- E4
EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.
“EU call topic”
Source : Advanced TSO control rooms to enhance grid observability, stability and resilie… (ID HORIZON-CL5-2027-07-D3-25), champ /metadata/type/0, lu 28 oct. 2026, 21:22 UTC · source (s’ouvre dans un nouvel onglet)
- E5
The portal lists this call as forthcoming: it is announced but not open yet.
“31094501”
Source : Advanced TSO control rooms to enhance grid observability, stability and resilie… (ID HORIZON-CL5-2027-07-D3-25), champ /metadata/status/0, lu 28 oct. 2026, 21:22 UTC · source (s’ouvre dans un nouvel onglet)
- E6
Applications open on 4 Aug 2027.
“2027-08-04T00:00:00.000+0000”
Source : Advanced TSO control rooms to enhance grid observability, stability and resilie… (ID HORIZON-CL5-2027-07-D3-25), champ /metadata/startDate/0, lu 28 oct. 2026, 21:22 UTC · source (s’ouvre dans un nouvel onglet)
- E7
The Funding & Tenders Portal gives the status as forthcoming.
Source : Advanced TSO control rooms to enhance grid observability, stability and resilie… (ID HORIZON-CL5-2027-07-D3-25), champ /metadata/status/0, lu 28 oct. 2026, 21:22 UTC · source (s’ouvre dans un nouvel onglet)
- E8
The notice is titled "Advanced TSO control rooms to enhance grid observability, stability and resilience".
Source : Advanced TSO control rooms to enhance grid observability, stability and resilie… (ID HORIZON-CL5-2027-07-D3-25), champ /metadata/title/0, lu 28 oct. 2026, 21:22 UTC · source (s’ouvre dans un nouvel onglet)
- E9
The EU contribution per grant is up to EUR 10,000,000 (from EUR 6,000,000).
Source : Advanced TSO control rooms to enhance grid observability, stability and resilie… (ID HORIZON-CL5-2027-07-D3-25), champ /metadata/budgetOverview/0, lu 28 oct. 2026, 21:22 UTC · source (s’ouvre dans un nouvel onglet)
Source: EU Funding & Tenders Portal, © European Union, CC BY 4.0. SLETOR shortened and reformatted the text. Licence des données : Creative Commons Attribution 4.0 (European Commission) (s’ouvre dans un nouvel onglet). Les coordonnées personnelles figurant dans les avis ne sont ni conservées ni affichées.
Mises à jour
Vu pour la première fois · 28 oct. 2026, 21:22 UTC
The funder announced the call. Applications have not opened yet.
Enregistrement source : Advanced TSO control rooms to enhance grid observability, stability and resilie… (ID HORIZON-CL5-2027-07-D3-25)