Advanced TSO control rooms to enhance grid observability, stability and resilience[E8]
UnknownEuropean Commission[E1]
In plain English
- What they want
- Call: ENERGY. Type of action: HORIZON Innovation Actions. Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, and efficiency of electricity transmission grids. Grid congestion is managed efficiently; Enhanced observability of grids and improved forecasting of supply, demand, grid capacity availability, and flexibility;
- Who can bid
- No restrictions are stated in the notice data. The tender documents may set more.
- Expected deadline
- Buyer's deadline: 1 Dec 2027, 01:00 Central European time (UTC+1). UTC: 1 Dec 2027, 00:00 UTC.Published Not stated.
- Value
- EUR 10,000,000
- Buyer
- European CommissionSee what else this buyer buys and when.
- How to apply
- Through the buyer's official process. Open the original notice on EU Funding & Tenders Portal (grants and calls for proposals) (opens in a new tab) ↗
- Tender documents
The tender documents for this notice are on the buyer's own portal, usually behind a free supplier registration. We link to them and do not fetch them, so the report is based on the notice only.
Your tender documents
Download the tender pack from the buyer's portal (the invitation to tender, specification, selection questionnaire, scoring and draft contract) and add it here. We read every page and check it against your company for the bid assessment.
Sign in to upload documents.
- Expected deadline[E2]
- 1 Dec 2027, 01:00 Central European time (UTC+1)
- Value[E9]
- EUR 10,000,000
- Published[E6]
- Not stated
- Procedure
- Not stated
- Last checked
- 10 hours ago
About the requirement
From the notice
Call: ENERGY. Type of action: HORIZON Innovation Actions. Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, and efficiency of electricity transmission grids. Grid congestion is managed efficiently; Enhanced observability of grids and improved forecasting of supply, demand, grid capacity availability, and flexibility; Transmission system operators (TSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with other TSOs; Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the TSO control room design and operation. Scope: Projects are expected to address all the following items: Design and test innovative solutions, technologies and processes for advancing the way the TSO control rooms are designed and operated, increasing observability and entailing enhanced support for the operators, providing more automation and enhanced support for decision, faster response times and less room for error. The solutions are expected to incorporate both hardware and software aspects; Analyse and include, as far as possible, solutions for Wide Area Monitoring Systems (WAMS) to extend the real-time monitoring and control capabilities over large areas, while coping with the decentralisation and increased complexity of the system; The novel solutions are expected to help the operators to manage better grid congestion and incorporate more renewables while reducing curtailment. The solutions will facil…[E3]
Eligibility and requirements
- ConditionEU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.[E4]
- The notice data states no restriction on who may bid. Exclusion grounds and selection criteria in the tender documents still apply.
Risks and unknowns
- RiskBidding has not opened. Scope and dates can change before the call for competition.[E5]
- RiskThis is a grant, not a contract. Grants usually need a proposal against the funder's criteria, may need partners and often need co-funding.[E5]
- UnknownWe read the published notice, not the full tender documents.
Updates
First seen · 28 Oct 2026, 21:22 UTC
The source published a planning or prior information notice. Bidding has not opened.
Source document HORIZON-CL5-2027-07-D3-25:31094501:2026-10-07T11:13:45.530+0200
Evidence
9 factsEvery fact on this page comes from the published notice. Each entry shows the document and the field it was read from.
- E1
The buyer is European Commission.
Document HORIZON-CL5-2027-07-D3-25:31094501:2026-10-07T11:13:45.530+0200, field /metadata/type/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E2
Proposals must be submitted by 1 Dec 2027, 01:00 Central European time (UTC+1).
“2027-12-01T00:00:00.000+0000”
Document HORIZON-CL5-2027-07-D3-25:31094501:2026-10-07T11:13:45.530+0200, field /metadata/deadlineDate/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E3
The buyer describes the requirement in the notice.
“Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, and efficiency of electricity transmission grids. Grid congestion is managed efficiently; Enhanced observability of grids and improved forecasti…”
Document HORIZON-CL5-2027-07-D3-25:31094501:2026-10-07T11:13:45.530+0200, field /metadata/descriptionByte/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E4
EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.
“EU call topic”
Document HORIZON-CL5-2027-07-D3-25:31094501:2026-10-07T11:13:45.530+0200, field /metadata/type/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E5
This call is forthcoming: it is announced but not open yet.
“31094501”
Document HORIZON-CL5-2027-07-D3-25:31094501:2026-10-07T11:13:45.530+0200, field /metadata/status/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E6
The notice was published on 4 Aug 2027.
“2027-08-04T00:00:00.000+0000”
Document HORIZON-CL5-2027-07-D3-25:31094501:2026-10-07T11:13:45.530+0200, field /metadata/startDate/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E7
The Funding & Tenders Portal gives the status as forthcoming.
Document HORIZON-CL5-2027-07-D3-25:31094501:2026-10-07T11:13:45.530+0200, field /metadata/status/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E8
The notice is titled "Advanced TSO control rooms to enhance grid observability, stability and resilience".
Document HORIZON-CL5-2027-07-D3-25:31094501:2026-10-07T11:13:45.530+0200, field /metadata/title/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
- E9
The EU contribution per grant is up to EUR 10,000,000 (from EUR 6,000,000).
Document HORIZON-CL5-2027-07-D3-25:31094501:2026-10-07T11:13:45.530+0200, field /metadata/budgetOverview/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)
Source: EU Funding & Tenders Portal, © European Union, CC BY 4.0. SLETOR shortened and reformatted the text. Data licence: Creative Commons Attribution 4.0 (European Commission) (opens in a new tab). Personal contact details in notices are not stored or shown.