Skip to content
UpcomingGrantPlanned procurementElectrical equipment

Sustainable and Competitive Cell Production Techniques for Lithium-ion And Sodium-ion Batteries (BATT4EU Partnership)[E8]

UnknownEuropean Commission[E1]

In plain English

What they want
Call: BATTERIES and ENERGY. Type of action: HORIZON Innovation Actions. Expected Outcome: Proposals are expected to contribute to all following points: Significantly enhanced competitiveness, resilience, and sustainability of the European battery cell manufacturing industry, achieving measurable reductions in capital expenditure (CAPEX), operational expenditure (OPEX), energy consumption, and environmental footprint…
Who can bid
No restrictions are stated in the notice data. The tender documents may set more.
Expected deadline
Buyer's deadline: 31 Mar 2027, 02:00 Central European time (UTC+2). UTC: 31 Mar 2027, 00:00 UTC.
Published Not stated.
Value
EUR 43,000,000
Buyer
European CommissionSee what else this buyer buys and when.
Tender documents

The tender documents for this notice are on the buyer's own portal, usually behind a free supplier registration. We link to them and do not fetch them, so the report is based on the notice only.

Your tender documents

Download the tender pack from the buyer's portal (the invitation to tender, specification, selection questionnaire, scoring and draft contract) and add it here. We read every page and check it against your company for the bid assessment.

Sign in to upload documents.

Expected deadline[E2]
31 Mar 2027, 02:00 Central European time (UTC+2)
Value[E9]
EUR 43,000,000
Published[E6]
Not stated
Procedure
Not stated
Last checked
10 hours ago

About the requirement

From the notice

Call: BATTERIES and ENERGY. Type of action: HORIZON Innovation Actions. Expected Outcome: Proposals are expected to contribute to all following points: Significantly enhanced competitiveness, resilience, and sustainability of the European battery cell manufacturing industry, achieving measurable reductions in capital expenditure (CAPEX), operational expenditure (OPEX), energy consumption, and environmental footprint compared to state-of-the-art processes. Demonstrated advanced manufacturing processes and equipment that substantially decrease battery production costs and improve overall production efficiency and battery quality. Established flexible and modular pilot production lines capable of efficiently transitioning between various battery chemistries and compositions, with demonstrated reduction in cross-contamination and effective management of sensitive materials. Scope: Proposals are expected to target the development and demonstration of innovative, next-generation battery cell manufacturing processes and machinery. These solutions are expected to explicitly focus on simultaneously achieving significant cost reductions and considerable decreases in energy consumption over the battery lifecycle, while maintaining or improving battery cell quality and sustainability metrics. Proposals are expected to address all of the following: Demonstration of flexible, modular, and reconfigurable machinery to be integrated in manufacturing pilot lines that effectively accommodate transitions between various lithium-ion chemistries/compositions and sodium-ion chemistries. Developme…[E3]

Eligibility and requirements

  • ConditionEU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.[E4]
  • The notice data states no restriction on who may bid. Exclusion grounds and selection criteria in the tender documents still apply.

Risks and unknowns

  • RiskBidding has not opened. Scope and dates can change before the call for competition.[E5]
  • RiskThis is a grant, not a contract. Grants usually need a proposal against the funder's criteria, may need partners and often need co-funding.[E5]
  • UnknownWe read the published notice, not the full tender documents.

Updates

  1. First seen · 28 Oct 2026, 21:22 UTC

    The source published a planning or prior information notice. Bidding has not opened.

    Source document HORIZON-CL5-2027-02-D2-06:31094501:2026-10-07T11:12:23.385+0200

Evidence

9 facts

Every fact on this page comes from the published notice. Each entry shows the document and the field it was read from.

  1. E1

    The buyer is European Commission.

    Document HORIZON-CL5-2027-02-D2-06:31094501:2026-10-07T11:12:23.385+0200, field /metadata/type/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)

  2. E2

    Proposals must be submitted by 31 Mar 2027, 02:00 Central European time (UTC+2).

    “2027-03-31T00:00:00.000+0000”

    Document HORIZON-CL5-2027-02-D2-06:31094501:2026-10-07T11:12:23.385+0200, field /metadata/deadlineDate/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)

  3. E3

    The buyer describes the requirement in the notice.

    “Expected Outcome: Proposals are expected to contribute to all following points: Significantly enhanced competitiveness, resilience, and sustainability of the European battery cell manufacturing industry, achieving measurable reductions in capital expenditure (CAPEX), operational…”

    Document HORIZON-CL5-2027-02-D2-06:31094501:2026-10-07T11:12:23.385+0200, field /metadata/descriptionByte/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)

  4. E4

    EU grant rules apply: check the call conditions for who can apply, consortium rules and co-funding.

    “EU call topic”

    Document HORIZON-CL5-2027-02-D2-06:31094501:2026-10-07T11:12:23.385+0200, field /metadata/type/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)

  5. E5

    This call is forthcoming: it is announced but not open yet.

    “31094501”

    Document HORIZON-CL5-2027-02-D2-06:31094501:2026-10-07T11:12:23.385+0200, field /metadata/status/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)

  6. E6

    The notice was published on 3 Dec 2026.

    “2026-12-03T00:00:00.000+0000”

    Document HORIZON-CL5-2027-02-D2-06:31094501:2026-10-07T11:12:23.385+0200, field /metadata/startDate/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)

  7. E7

    The Funding & Tenders Portal gives the status as forthcoming.

    Document HORIZON-CL5-2027-02-D2-06:31094501:2026-10-07T11:12:23.385+0200, field /metadata/status/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)

  8. E8

    The notice is titled "Sustainable and Competitive Cell Production Techniques for Lithium-ion And Sodium-ion Batteries (BATT4EU Partnership)".

    Document HORIZON-CL5-2027-02-D2-06:31094501:2026-10-07T11:12:23.385+0200, field /metadata/title/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)

  9. E9

    The EU contribution per grant is up to EUR 43,000,000 (from EUR 380,000).

    Document HORIZON-CL5-2027-02-D2-06:31094501:2026-10-07T11:12:23.385+0200, field /metadata/budgetOverview/0, read 28 Oct 2026, 21:22 UTC · source (opens in a new tab)

Source: EU Funding & Tenders Portal, © European Union, CC BY 4.0. SLETOR shortened and reformatted the text. Data licence: Creative Commons Attribution 4.0 (European Commission) (opens in a new tab). Personal contact details in notices are not stored or shown.