Aller au contenu
OuvertFinancement du développementConstruction work

Update of the (i) technical studies and bidding documents for irrigation and hydropower; (ii) economic and financial project assessment (Phases II and III); and (iii) transboundary water analysis[E10]

Macédoine du NordPE Hydrosystem Zletovica[E1]

En termes simples

Ce qu’ils veulent
Project: Zletovica Productivity through Irrigation and Renewable Energy (P515976). REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES - FIRMS SELECTION) Republic of North Macedonia Ministry of Agriculture, Forestry and Water Economy ZLETOVICA PRODUCTIVITY THROUGH IRRIGATION AND RENEWABLE ENERGY PROJECT (PIREP) Grant No.: TF-D2152 Assignment Title: Update of the (i) technical studies and bidding documents for…
Qui peut répondre
  • World Bank procurement rules apply. Suppliers must be eligible under the World Bank Procurement Regulations, and firms debarred by the Bank cannot take part.
Date limite[E3]
Date limite de l’acheteur : 11 nov. 2026, 15:00 UTC. UTC : 11 nov. 2026, 15:00 UTC. Fuseau horaire non indiqué par la source, affiché en UTC.
Valeur
Non indiquée par l’acheteur.
Acheteur
PE Hydrosystem ZletovicaVoyez ce que cet acheteur achète d’autre, et quand.

Préliminaire, d'après l'avis seulement

Ce que dit l'avis publié. Ce n'est pas une recommandation. Les documents de la consultation peuvent ajouter ou modifier des exigences.

  • World Bank procurement rules apply. Suppliers must be eligible under the World Bank Procurement Regulations, and firms debarred by the Bank cannot take part.[E5]

Créez un profil gratuit pour voir les obstacles possibles et les questions ouvertes.

Créer un profil gratuit

Documents de consultation

Les documents de consultation sont sur le portail de l'acheteur, souvent après une inscription gratuite. Nous ne nous connectons jamais à votre place. Téléchargez-les là-bas et ajoutez-les ci-dessous, ou collez leur adresse publique.

Publié[E8]
27 oct. 2026
Procédure[E7]
Quality And Cost-Based Selection
Dernière vérification
il y a 25 heures

À propos du besoin

Extrait de l’avis

Project: Zletovica Productivity through Irrigation and Renewable Energy (P515976). REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES - FIRMS SELECTION) Republic of North Macedonia Ministry of Agriculture, Forestry and Water Economy ZLETOVICA PRODUCTIVITY THROUGH IRRIGATION AND RENEWABLE ENERGY PROJECT (PIREP) Grant No.: TF-D2152 Assignment Title: Update of the (i) technical studies and bidding documents for irrigation and hydropower; (ii) economic and financial project assessment (Phases II and III); and (iii) transboundary water analysis Reference No.: PIREP-CS-QCBS-01 The Republic of North Macedonia has received World Bank financing through the Grant Facility for Project Preparation (GFPP) to prepare the Zletovica Productivity through Irrigation and Renewable Energy Project (PIREP), and intends to apply part of the grant proceeds to these consulting services. The Ministry of Agriculture, Forestry and Water Economy (MAFWE), through its Project Implementation Unit (PIU), implements the preparation grant in partnership with PE HS Zletovica. The main objective of the consulting services (the "Services") is to validate and update the available feasibility studies and prepare construction-ready final detailed designs, statutory and permit documentation, and technical components of bidding packages for Phase 2 Irrigation and Phase 3 Hydropower of the Zletovica Hydro-System. Both components shall be prepared concurrently, with equal priority, as an integrated Project. The Services include review and gap analysis; supplementary surveys and investigations; updated hydrology,…[E4]

Éligibilité et exigences

Les détails de l’avis sont affichés tels que la source les a publiés. Les faits et exigences que nous extrayons sont rédigés en anglais.

  • ConditionWorld Bank procurement rules apply. Suppliers must be eligible under the World Bank Procurement Regulations, and firms debarred by the Bank cannot take part.[E5]

Risques et inconnues

  • RisqueThis is funded by a development bank. The bank's procurement rules apply, and the buyer is the borrowing country's agency.[E6]
  • InconnuThe notice does not state a value.
  • InconnuWe read the published notice, not the full tender documents.

Mises à jour

  1. Vu pour la première fois · 28 oct. 2026, 13:29 UTC

    The source published a call for competition with a future deadline.

    Document source OP00477454

Preuves

10 faits

Chaque information de cette page provient de l’avis publié. Chaque entrée indique le document et le champ dont elle a été lue.

  1. E1

    The buyer is PE Hydrosystem Zletovica.

    Document OP00477454, champ /contact_organization, lu 28 oct. 2026, 13:29 UTC · source (s’ouvre dans un nouvel onglet)

  2. E2

    The project is in North Macedonia.

    “MK”

    Document OP00477454, champ /project_ctry_name, lu 28 oct. 2026, 13:29 UTC · source (s’ouvre dans un nouvel onglet)

  3. E3

    Submissions are due by (local time, zone not stated) 11 Nov 2026, 15:00 UTC.

    “2026-11-11 15:00”

    Document OP00477454, champ /submission_deadline_date, lu 28 oct. 2026, 13:29 UTC · source (s’ouvre dans un nouvel onglet)

  4. E4

    The buyer describes the requirement in the notice.

    “Project: Zletovica Productivity through Irrigation and Renewable Energy (P515976). REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES - FIRMS SELECTION) Republic of North Macedonia Ministry of Agriculture, Forestry and Water Economy ZLETOVICA PRODUCTIVITY THROUGH IRRIGATIO…”

    Document OP00477454, champ /notice_text, lu 28 oct. 2026, 13:29 UTC · source (s’ouvre dans un nouvel onglet)

  5. E5

    World Bank procurement rules apply. Suppliers must be eligible under the World Bank Procurement Regulations, and firms debarred by the Bank cannot take part.

    “Request for Expression of Interest”

    Document OP00477454, champ /notice_type, lu 28 oct. 2026, 13:29 UTC · source (s’ouvre dans un nouvel onglet)

  6. E6

    This is a World Bank Request for Expression of Interest.

    Document OP00477454, champ /notice_type, lu 28 oct. 2026, 13:29 UTC · source (s’ouvre dans un nouvel onglet)

  7. E7

    The procurement method is Quality And Cost-Based Selection.

    Document OP00477454, champ /procurement_method_name, lu 28 oct. 2026, 13:29 UTC · source (s’ouvre dans un nouvel onglet)

  8. E8

    The notice was published on 27 Oct 2026.

    “2026-10-27T00:00:00Z”

    Document OP00477454, champ /submission_date, lu 28 oct. 2026, 13:29 UTC · source (s’ouvre dans un nouvel onglet)

  9. E9

    The World Bank gives the status as Published.

    Document OP00477454, champ /notice_status, lu 28 oct. 2026, 13:29 UTC · source (s’ouvre dans un nouvel onglet)

  10. E10

    The notice is titled "Update of the (i) technical studies and bidding documents for irrigation and hydropower; (ii) economic and financial project assessment (Phases II and III); and (iii) transboundary water analysis".

    Document OP00477454, champ /bid_description, lu 28 oct. 2026, 13:29 UTC · source (s’ouvre dans un nouvel onglet)

Source: The World Bank, procurement notices (CC BY 4.0). Not endorsed by the World Bank. Licence des données : Creative Commons Attribution 4.0 (World Bank) (s’ouvre dans un nouvel onglet). Les coordonnées personnelles figurant dans les avis ne sont ni conservées ni affichées.