Design of H3AT Control Room
Reino UnidoUK Atomic Energy Authority
The project involves the development of a dedicated Control Room environment to support H3AT operations. The design must consider Human Factors and Ergonomics, operator workflows, sightlines, accessibility, and future expansion requirements. Mandatory Scope The Contractor shall be responsible for: - Undertaking a detailed survey of the existing room and supporting infrastructure. - Developing the Control Room design, including layout options and the final recommended arrangement. - Undertaking Human Factors and Ergonomics assessments. - Assessing the existing electrical, lighting, HVAC and aco