E02 Kløfta tunnel
ノルウェーStatens vegvesen
This competition is for contract E02 the Kløfta tunnel. Main quantities: The north side of the tunnel (the Alta side): * Expansion and preparation of mass depot at Garajokka * Road between the new bridge (E03) and tunnel. 500 m with Main Road H1 * One stop * Treatment Plant * Technical buildings Tunnel: * 4,200 meters of T9.5 tunnel. * Tunnel portals, T12.5 constant cross section * Three technical rooms/buildings * Turnaround The south side of the tunnel (Kautokeino side): * 1.7 km with main road H1 * One technical building