Inspised First Floor Fit Out and Renovations, Brandon Court, Basin Road, Tralee, Co. Kerry.
IrlandeRCE Engineers
Avis de marchés publics issus de sources officielles. Chacun est revérifié à la source avant la livraison d’un rapport.
13 avis ouverts
IrlandeRCE Engineers
Valeur
EUR 500 k
Clôture
IrlandeWaterford City and County Council_103683
Waterford City and County Council intend to carry out remedial Works on the Clock Tower. Works required will be to recondition and renew the clock dials, glass and moving parts.
Valeur
EUR 55 k
Clôture
IrlandeLouth County Council_381
Development of new training facility and upgrade works to existing
Valeur
EUR 5,5 M
Clôture
IrlandeMilford and District Resource Centre
Phase 2 - Completion of large multi-purpose space including replacement windows and building services; new kitchen units. Phase 3 - Construction of new glazed link; refurbishment and alterations to smaller hall including new toilets; completion of building services; site works.
Valeur
EUR 600 k
Clôture
IrlandeMayo Sligo and Leitrim ETB
Invitation to Tenders is sought from suitably qualified Contractors to undertake the complete Project Scope comprising of supply, delivery, installation and commissioning of modular off-site constructed containerised biomass cabins and the subsequent supply and delivery of fuel to each school for a period of 15 years. The successful contractor will be required to enter into 2 separate contracts covering the works element (Contract A) and the supply of fuel element (Contract B) as follows: a. Contract A: Public Works Contract (PWC) relating to the supply, delivery, installation and commissionin
Valeur
EUR 4,6 M
Clôture
IrlandeHealth Service Executive (HSE)
The Works comprise the extensive refurbishment and alteration of approximately 248 m² of the existing Blackthorn Unit at Cherry Orchard Hospital to accommodate the Community Day Care Service. The Works generally include internal refurbishment and alterations; mechanical and electrical services installations/upgrades; replacement/upgrading of windows, roofing, finishes and associated services; construction of an infill extension; associated external works including paths and ramps; installation of external wall insulation to the existing Blackthorn Unit; and upgrading of the existing roof const
Valeur
EUR 1,6 M
Clôture
IrlandeClare County Council
Clare County Council has been granted provisional funding under the Housing Infrastructure Investment Fund (HIIF) for a residential road scheme at Claureen, Ennis, Co. Clare. This involves the construction of an enabling road from the previously granted and soon to be constructed Claureen Link Road Phase 1 (LIHAF) between the N85 and junction of Drumcliffe Road Lees Road to facilitate an initial development of in excess of 200 number housing units with scope for development for a significant number of housing units on surrounding benefitting lands.
Valeur
EUR 225 k
Clôture
IrlandeTransport Infrastructure Ireland (TII)
Luas Finglas is a 4 km extension of the Luas Green Line, delivering a high-capacity light rail connection between Finglas and Dublin city centre to support sustainable transport and urban development. The scheme will serve communities including Charlestown, Finglas Village, Finglas West, St Helena’s, and the Tolka Valley, and will comprise four new stops at St Helena’s, Finglas Village, St Margaret’s Road, and Charlestown. It also includes a 350-space Park and Ride facility near St Margaret’s Road, as well as interchange opportunities with bus services and with mainline rail services at Broomb
Valeur
EUR 250 M
Clôture
IrlandeOffice of Public Works (OPW)
Retrofitting of an automatic high-pressure water mist system for the two (2) levels of basement car parking in Walter Scott House,Military Road, Dublin 8.
Valeur
Non indiqué
Valeur indicative
Clôture
IrlandeKilkenny County Council_1185
Technical Consultancy services for the Kilkenny City Centre Vibrant Streets West. Engagement of the services of a multi-disciplinary team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement, construction and handover to complete the Kilkenny City Centre Vibrant Streets West scheme, including fulfilment of the PSDP role along with the procurement of specialist services and all other services as prescribed to complete the scheme.
Valeur
EUR 5 M
Clôture
IrlandeOffice of Public Works (OPW)
Valeur
Non indiqué
Clôture
IrlandeSt Edward's National School (Ballytivnan), Sligo
Construction of a single storey extension to the north side of the existing school building to create a single new classroom and 4 no. S.E.T. Rooms, Connection to existing services on the site including works to existing Irish Water Drop manhole and all the site works connected with the work mentioned above at St. Edward’s NS, Clarion Road, Ballytivnan, Sligo, F91 DX64.
Valeur
EUR 775 k
Clôture
IrlandeGrangegorman Development Agency_564
It is proposed to establish a Single-Party Framework Agreement for the provision of Geothermal Engineering Consultancy services described under the headings of General Services and Works Related Services (refer to Section 2 of PIM) and using The GEMINI Geothermal Design Project as the basis for this Framework competition which will be the first project requiring the services of a Geothermal Engineering Consultant. The scope of service required for this project is detailed further in the PIM. Subsequent potential appointments will be drawn down in accordance with the Framework Agreement.
Valeur
EUR 1,8 M
Clôture