Planting of Seagrass for Ostwind 3 Offshore project between KP18.1-18.4
Germany50Hertz Offshore GmbH
The main target for this operation is the planting of seagrass, either as a single plant or/and as a rope consisting plants. Employer is requesting the Bidder to submit a quotation for the execution of seagrass planting works. The designated location for the seagrass planting is at Ostwind 3 cable route between KP18.1 – 18.4, which is a 325m long and 7m wide (about 2300m²) corridor. Seagrass planting will require the following pre-requisites and follow-ups: A consolidated coarse sediment layer of approx. 20 - 30 cm thickness (engineered material), An execution plan, prepared early enough to ac